Original source · versioned page text
Planning Report - 6-10 Diamond Street, Cooroy 27.12.18
Attached to the e-mail Commercial Business Type 1 Office, Retail Business Type 2 Shop & Salon & Multiple Housing Type 4 Conventional - 4 units (Cover Letter, DA Form, Owners Consent & Planning Report) - MCU19/0001.
Probable Solutions as described in the Earthworks Code Table 14.52.
Erosion and Sediment Control Code
Comment: The Operations Works application which is to follow this Material Change in Use application will
detail how the development will comply with the Probable Solutions as described in the Erosion and Sediment
Control Code Table 14.53. Best practice measures will be incorporated during construction phase to ensure any
potential off-site environmental impacts are mitigated.
Existing Services Code
Comment: The proposed development has been assessed against the Probable Solutions listed in Table 14.54
of the Existing Services Code. The proposed development is not within close proximity to Council’s trunk
infrastructure and will connect to standard reticulated water, electricity, and sewer supplies.
Transport, Roads and Drainage Code
Comment: The proposed development complies with the Probable Solutions of the Transport, Roads and
Drainage Code where relevant.
BMC Traffic has conducted a Traffic Engineering Assessment Report (Appendix C) for the proposed mixed-use
development. The report has assessed and analysed the proposal. Presented in Section 6 of this report are the
extracted conclusions of the report.
The Operations Works application which is to follow this application will detail how the development will
comply with the Probable Solutions concerning drainage as described in Tables 14.58 and 14.59.
Waste Management Code
Comment: The proposed development complies with the relevant Probable Solutions detailed in Table 14.60
of the Waste Management Drainage Code.
Sufficient carparking is provided on-site to accommodate the storage and removable of waste. The proposal
has been assessed against the requirement of Planning Scheme Policy 09 —Waste Management below.
Water Sensitive Design Code
Comment: The proposed development complies with the relevant Probable Solutions detailed in Table 14.61
of the Water Sensitive Design Code. On site water run-off will be captured and treated on site via the
landscaped features. Suitable plant species will be utilised in order to reduce water consumption.
6-10 Diamond Street, COOROY Page 30
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.