Council archive · source document
William Street OP WORKS 14-4-21 · OPW21/0107
KEY NOTE:
RH RAIN HEAD
ALL DOWN PIPES AND PLUMBING DUCTS
S SPITTER LOCATIONS ARE RECOMMENDATIONS ONLY
DP DOWN PIPE AND SHOULD BE REFERENCED FROM
HYDRAULIC PLANS
SW STORM WATER DRAINAGE SHOULD BE CONCEALED
FR FLAT ROOF WITHIN SLAB WHERE NOTED
PD PLUMBING DUCT
FALL DIRECTION
A/C
AIR-CON UNIT
MFR METAL FLAT ROOF
2470
2470
3070
3070
COLORBOND WINDOW HOOD COLORBOND WINDOW HOOD
FR
WILLIAM STREET
7800
6696
FR
A A
14.070
14.070
LINE OF ROOF
OVER
LINE OF PITCHED
FR ROOF OVER
LINE OF CEILING VOID
LINE OF CEILING VOID
FR
FR FR
ROOF PLAN
3000
3000
2400
2400
42.286
EAVE COVERAGE
ROOF PERIMETER 73.180 m
REQUIRED EAVES 54.885 m / 75%
ACTUAL EAVES 55.830 m / 76.2%
PAUL CLOUT DESIGN GENERAL NOTES: CLIENT NAME: Clout, Paul
SITE ADDRESS: 7 WILLIAM STREET, NOOSAVILLE
Suite 3, 44 MARY STREET, NOOSAVILLE Use written dimensions only. DO NOT scale drawings. Contractors to verify all
dimensions on site prior to commencing works. Site location to engineer's
PO BOX 152, NOOSAVILLE, QLD 4566.
requirements. These drawings are to be read in conjunction with engineer's
DRAWING TITLE: LOWER ROOF PLAN
BSA LICENCE: 1066417
design and details, the accompanying building specification and schedule of DRAWING DATE: 14/04/21 SCALE: 1:100 on A2 DRAWING No:
PH: (07) 5440 5388
[email protected]
COPYRIGHT to PAUL CLOUT DESIGN PTY LTD.
www.paulclout.com
finishes. If in doubt, please request clarification. DO NOT ASSUME. STAGE:
OPERATIONAL WORKS 04.0
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
William Street OP WORKS 14-4-21.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.