File No: MCU 12/0208
SI!I~I~I iI~il l~~~I~l l fl !l ~ Bf’X: ..
R: .
X0062872
Postal address of Land (as
advertised): Eenie Creek Rd, 99 & 191 Hollett Rd Noosaville +
Road, Weyba Downs (Lot 2 RP160983, Lot 2 106, 108-142 Tidswell
SP179590, Lot 7 RP46782, Lot 53 SP163571, Lot 11
12 RP893393 + Lot 1667
M37772) SP250714, Lot
Nature of Proposed Development: Mixed Use
Community Title Development
Full name of Submitter/s: David John Watts
and Alison Joy Watts
Postal address: POBox 539
Telephone:5 l’ 852
Suburb:Tewan ’n
J, ~J I
State:Qld
Signature(s)
’Fc(JkJ
:27/11/11
Pursuant to the Sustainable Planning Act
2009, I (We),the undersigned make the
following submission:
._----_._----
Facts and Circumstances We reside at 158 Eumarella
Rd, Weyba Downs. In reference to this
-
are concerned about the application we
following...traffic flow, run off, type of construction.
Grounds for submission -
Traffic Flow......If the Sunshine Coast Council
part is approved Eumarella Rd through to Tidswell Rd
would be used
by heavy vehicles..trucks etc. The road is a goat track now and the
deteriorate. As in the past in the Weyba Downs estate
heavy load and volume would only see this road
repairs to road damage are not carried out after
usage. With access via Walter Hay Drive the extra load on this heavy vehicle
road will only see this
further along with delays coming out of Eumarella By pass road deteriorate
Road because of anticipated volume. If
Tidswell Road ends up
being the only access point the current road will not stand
up to the volume. The surrounding roads are
to the task of carrying the
anticipated increase in traffic. simply not up
Run Off..Whilst water and
sewerage are to be connected to the estate the run off is into
the Lake Weyba and Noosa River water Keyser Creek a vital part of
system. Lake Weyba is very shallow and further run off from
estate will see the water system and wild life a multi dwelling
suffer and even disappear.
Type of Construction..The type of Construction being
proposed is not in line with any Council plan and as in the
past if this is overlooked then it will be open slather for other
parts of both Councils.To paddle out on the lake as we
do and look back on 2 to 3
story dwellings is not in keeping with the ambience of the area. 308M2
see crammed accomodation with extra allotments will only
cars not being able to be
certain types of pets will be allowed
garaged. The developer has stated that no or only
by residents. How is this monitored.? The area we reside in is
are privileged to reside in a spacious and we
quiet area of our choosing and which was
originally set up for this. The
magnitude of this
development is not in keeping with anything else around Lake
Weyba and not within any Council plan
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 2 pages
Page 2
" (ifnecessary, use separate sheet ofpaper and attach) [OCR of page images] (if necessary, use separate sheet of Paper and attach)
Page 3
...
Send to:
OR Deliver to:
Chief Executive Officer
9 Pelican Street Tewantin
Qld 4565; or
Sunshine Coast Regional Council
Cnr Currie and Bury Streets
Nambour Qld 4560; or
Locked Bag 72
11-13 Ocean Street
Maroochydore Qld 4568; or
SUNSHINE COAST MAIL CENTRE Qld 4560
1 Omrah Avenue Caloundra
Qld 4551
To ensure your submission is
properly made you must ensure that:
It is in writing and is
signed by each person who made the submission; and
11-....-
Is received on or before the _.~
1!9 December 2013; and
States the name and address of each
person; and
States the grounds of the submission and the
facts and circumstances relied on in
support of the grounds.
Used in these records
Properly Made submission (object) David & Alison Watts - MCU13/0208Related documentApplication case desk ↗
About this file
- File size
- 1.1 MB (small file)
- File type
No other editions are linked here.