Original source · versioned page text
2015-08-18 Planning and Organisation Committee Attachment 1 to Item 13 Updated Delegations of Authority - Council to CEO 2015-16
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Council to CEO Updated Delegations 15/16 Attachment 1
Delegation No: 2015-27
DESCRIPTION OF POWER DELEGATED LEGISLATION
Power to require for a supply pipe for a premises group: Section 34(3)
(a) part of the supply pipe (premises group main) to be built to the
standard of a water main;
(b) each separately occupied part of the premises group to be served
directly by a supply pipe connected to the premises group main; and
(c) each separately occupied part of the premises group that is to have a
fire service to be served directly by a fire service connected to the
premises group main.
Power to require the sanitary drainage for premises or a group of premises to be Section 35
of a standard of a sewer forming part of Council’s or another service provider’s
sewerage system.
Power to implement and maintain a program for the registration, maintenance Section 38
and testing of testable backflow prevention devices.
Power to approve the design and location of a grease arrestor. Section 39
Power to approve air-cooling equipment’s connection to a supply pipe. Section 41
Power to approve hydraulic powered equipment’s connection to a supply pipe. Section 44
Power to approve a pipe carrying water supplied by the local government or Section 45
other service provider to be:-
(a) connected to a water storage tank used to store water obtained from
another source or;
(b) discharged into a water storage tank used to store water obtained from
another source.
Power to approve a water closet pan, urinal or another fixture below the level of Section 47
the sewer or on-site sewerage facility.
Power to issue a notice to the owner of a new building and an old building, Section 52
requiring:-
(a) the owner of the new building to pay the reasonable costs of changing the
vents of the old building; and
(b) the owner of the old building to change the vents.
Power to determine the qualifications, skills and experience that an individual Section 53
should have to be competent to assess plumbing and drainage work.
Power to perform maintenance work on existing combined sanitary drains, Section 54
apportion the reasonable costs between or among the owners and recover from
each owner, the owner’s share of Council’s costs.
Any Conditions of Delegation:
1. The delegated officer must exercise this delegation in accordance with council; resolutions,
policies, guidelines, procedures, industrial instruments and agreements.
2. If the CEO on delegates any of these powers the delegated officer must exercise any
delegated power in accordance with the scope and limitations of the subject officer’s letter of
appointment and/or, position description, qualifications, technical knowledge and legislative
requirements.
Page 5 of 5
LGAQ updated 31/01/2015 31
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.