Delegated Report - Code - Planning OPW17 0612 · OPW17/0612
Author Coordinator Engineering, Mark Lewis Development Assessment APPLICATION DETAILS Application No. OPW17/0612 Applicant Altum Properties No 4 Pty Ltd TTE Proposal Operational Works - Carparking, Frontage Work, Roadworks, Stormwater Properly Made Date 19 December 2017 Information Request Date 24 January 2018 Information Response Date 23 February 2018 Decision Due Date 17 April 2018 Report Completed Date 16 April 2018 Number of Submissions Not Applicable PROPERTY DETAILS Property Address 75 Resort Dr Noosa Heads Qld 4567 RP Description Lot 6 SP 178340 Land Area 11800.000 m² Existing Use of Land Vacant STATUTORY DETAILS SEQRP Designation Urban Footprint Locality Noosa Heads Zone Semi-attached housing Overlays Biodiversity, Natural Hazards Assessment Type Code PROPOSAL The application seeks approval for Operational Works – Carparking and Access, Site Civil Works, Frontage Works and Vegetation Management. site details Background The site is part of the larger development site of Noosa Springs. It is noted that the applicant requested that the external pathway be deleted from the subject application. Site Description Lot 6 on SP178340 known as Precinct E2 assessment Instruments for Statutory Assessment Under the Planning Act 2016 the application must be assessed against each of the following statutory planning instruments to the extent they are relevant to the development: State Planning Policy; South East Queensland Regional Plan; Planning Regulation 2017 The Noosa Plan. The following codes from the Noosa Plan are applicable to this development: Engineering Works Codes The subject site is located in the Noosa Heads Locality and is zoned Semi-Attached Housing. The application has been found to generally comply with all applicable statutory instruments. cONSULTATION Referral Agencies Not applicable Other Referrals The application was forwarded to the following internal Council officers: Planning Assessment Environment conclusion & reasons for decision The proposed development generally complies with the requirements of the planning scheme and does not raise any significant issues that cannot be addressed by reasonable and relevant conditions. The application is therefore recommended for approval. The report is provided in accordance with Section 63(5) of the Planning Act 2016. RECOMMENDATION With regard to Application No OPW17/0612 for a Operational Works - Carparking and Access, Site Civil Works, Frontage Works and Vegetation Management situated at 75 Resort Dr Noosa Heads Qld 4567 and described as Lot 6 SP 178340, it is recommended the application be approved in accordance with the following details for the Decision Notice: application details Application No: OPW17/0612 Street address: 75 Resort Dr Noosa Heads Qld 4567 Real property description: Lot 6 SP 178340 Planning Scheme: The Noosa Plan (3 July 2017) Decision details Council decided to issue the following type of approval: Development Permit for / Preliminary Approval for Operational Works - Carparking and Access, Site Civil Works, Frontage Works and Vegetation Management. CURRENCY PERIOD of approval The currency period for this development approval is 2 years starting the day that this development approval takes effect. assessment manager conditions APPROVED PLANS Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date 17155/C10 A1 Site Works and Drainage Layout Plan prepared by Morgan Consulting Engineers as annotated by Council 20 February 2018 17155/C11 A1 Site Works and Drainage Plan - Sheet 1 prepared by Morgan Consulting Engineers as annotated by Council 20 February 2018 17155/C12 A1 Site Works and Drainage Plan - Sheet 2 prepared by Morgan Consulting Engineers as annotated by Council 22 February 2018 17155/C13 A1 Site Works and Drainage Details - Sheet 1 prepared by Morgan Consulting Engineers as annotated by Council 20 February 2018 17155/C14 A0 Site Works and Drainage Details - Sheet 2 prepared by Morgan Consulting Engineers 18 December 2017 17155/C15 A0 Site Works and Drainage Details - Sheet 3 prepared by Morgan Consulting Engineers 18 December 2017 17155/C16 A0 Site Works and Drainage Details - Sheet 4 prepared by Morgan Consulting Engineers 18 December 2017 17155/C17 A0 Internal Access Driveway Chainages prepared by Morgan Consulting Engineers as annotated by Council 20 February 2018 17155/C18 A0 Internal Access Driveway Longitudinal Sections prepared by Morgan Consulting Engineers 20 February 2018 17155/C19 A0 Internal Access Driveway Cross Sections prepared by Morgan Consulting Engineers 20 February 2018 17155/C21 A0 Stormwater Longitudinal Sections – Sheet 1 prepared by Morgan Consulting Engineers 18 December 2017 17155/C22 A0 Stormwater Longitudinal Sections – Sheet 2 prepared by Morgan Consulting Engineers 18 December 2017 17155/C23 A0 Stormwater Longitudinal Sections – Sheet 3 prepared by Morgan Consulting Engineers 18 December 2017 17155/C30 A0 Signs and Linemarking Plan – Sheet 1 prepared by Morgan Consulting Engineers as annotated by Council 18 December 2017 17155/C31 A0 Signs and Linemarking Plan – Sheet 2 prepared by Morgan Consulting Engineers as annotated by Council 18 December 2017 SITE SPECIFIC CONDITIONS All works, excluding the access driveway, must be wholly contained within the subject site. The pathway indicated in the road reserve adjacent to the north-eastern and south-eastern property boundaries is not part of the works approved by this permit. All works must be carried out in accordance with the approved Vegetation Management Plan for the site (refer OPW17/0557) Construction and ongoing monitoring must be in accordance with the document titled “Altum Constructions Precinct F and E2 Noosa Springs Development Detailed Stormwater Quality Management Plan Revision 6” Dated 29 March 2018. At the pre-start meeting the contractor must provide Council with a construction plan for the site. The Construction plan shall identify construction staging to ensure less than 2,500m2 of soils will be exposed on site at any one time. Where more than 2500 metres2 is to be exposed on the site at any one time, each exposed catchment must be provided with sediment controls which are designed, implemented and maintained to a standard which would achieve at least 80% of the average annual runoff volume of the contributing catchment treated (i.e. 80% hydrological effectiveness) to 50mg/L Total Suspended Solids (TSS) or less, and pH in the range (6.5–8.5). Any sediment controls required to achieve this condition must be designed and their construction certified by a Certified Professional in Erosion and Sediment Control prior to any other works permitted onsite. PRIOR TO COMMENCEMENT OF WORKS Engineering Tree protection fencing must be installed under the supervision of the Project Arborist. (Refer to Retention of Existing Trees Conditions) All necessary approvals from external service providers (eg Unitywater) and external parties on which the development works are proposed have been obtained and a copy supplied to Council. A condition report including photographs of the frontage of the site must be completed and submitted to council at the prestart meeting / prior to any works commencing. Certificates demonstrating currency of public liability insurance and works insurance covering the works must be submitted to Council at the prestart meeting. Council must be contacted at least 5 working days prior to any works commencing to organise a prestart. The contact number to arrange a pre-start meeting is 5329 6244. The pre-start meeting must include the relevant parties for the following aspects of the works: Civil engineering works; Landscape works; Erosion and sediment control works; Other relevant parties A Construction Management Plan must be submitted to Council prior to the pre-start meeting and must specifically address the following: Traffic Management during all aspects of the construct phase including: A Traffic Management Control Plan in accordance with Manual of Uniform Traffic Control Devices (MUTCD) detailing all temporary signage and traffic control measures prior to construction Maintenance of safe pedestrian access across the frontage of the site both during daily construction and after daily construction has ceased Proposed fencing to the site during the construction phase of the development Adequate parking arrangements for construction workers No queuing of trucks is permitted on residential streets, especially prior to 7.00am. Further parked trucks must have engines turned off Maintenance and protection of water quality and existing drainage lines through the construction site through the implementation of appropriate erosion and sediment control measures Works programme identifying key components of the works and their respective durations Establishment of a communication protocol with the general public, adjoining owners, emergency services and local businesses to advise of agreed construction times, impacts on traffic and services and other relevant issues identification of complaint management procedures including: contact details for the on-site manager dispute resolution procedures For haulage operations involving significant volumes of fill material or excavated material being transported onto or off the site: details on the location of external fill sites/sources, the haulage route, type of vehicle to be utilised during filling operations and frequency of usage. NB any damage to the existing road system as a result of haulage operations shall be fully repaired at the applicant’s expense Any changes to the details associated with the supervising RPEQ or Principal Contractor during construction, must be notified to council in writing within five business days of the change occurring. Any conflict between the development and an existing or proposed service must be referred to the relevant service authority for determination prior to commencement of works. DURING CONSTRUCTION Engineering The developer must meet any costs to repair damage to any Council asset during construction, where damage is a result of the development works. Damage to assets must be repaired immediately where it creates a hazard to the community. In circumstances where the damage does not create a hazard to the community, it must be repaired immediately on completion of the works associated with the development. All works must be supervised by a Registered Professional Engineer of Queensland (RPEQ) who is independent of the Developer and Principal Contractor, and they must certify that all works conform to the Operational Works permit. Where municipal works are involved, such confirmation must be submitted for the respective hold points prior to any site inspection by Council Officers. All works must be constructed and work procedure undertaken in accordance with: The approved plans/documents and conditions detailed in this Decision Notice The relevant conditions of the higher order Material Change of Use approval viz. MCU15/0109 to which this approval relates All relevant Noosa Council Planning Scheme Policies, standard drawings, standard specifications and guidelines The latest version of the Healthy Waterways document “Water Sensitive Urban Design Technical Design Guidelines for South East Queensland” for all water quality devices to be constructed on site Pavement Design and Construction Pavement design for privately owned works must be undertaken in accordance with the relevant standards. Structural integrity of the driveway and car park areas will remain the responsibility of the property owner/developer and must be certified by an RPEQ. Works within Road Reserve/Reinstatement Safe pedestrian access on all streets in the vicinity of the development must be maintained at all times. Should footpath/road closures be necessary to carry out construction works, Council’s Engineering Officer must be notified prior to the proposed closure and all requirements complied with. All frontage works must match neatly with existing road and verge/footpath features. Additional works beyond the frontage may be required to provide an acceptable transition to existing road and verge/footpath profiles. Electrical conduits or other services proposed to be installed within existing and proposed road reserves under existing sealed carriageways, concrete pathways, concrete/sealed driveways or significant vegetation must be installed by boring. Trenching is not permitted, unless specifically approved by Council. Pathways All pathways must be constructed in accordance with the following requirements: All footpath/cycleway must comply with Council’s Standard Drawing SEQ R-065. Provision must be made for disabled access at all kerb crossings associated with pathways, in accordance with Council's current standards. All paths must have a slip resistant surface Pathways must: terminate in a manner that ensures smooth transition to existing surfaces for public safety be designed and constructed to comply with the Disability Discrimination Act (DDA), Access to Premises Standard, Austroads and relevant sections of AS1428 Design for access and mobility Site Access and Driveways Driveway crossovers must be constructed generally in accordance with Council’s Standard Drawing RS-051 Any existing unnecessary or redundant property accesses must be removed, and the kerb, footpath and verge area reinstated to match the existing footpath and/or verge treatments. Grassed verge areas to be reinstated must be provided with 100 mm topsoil and grass seed or turf, and must be maintained by the developer until established. The following must be complied with during the construction of the required crossover/driveway: The driveway surfacing must consist of either an approved hot mixed asphaltic concrete or patterned/plain concrete. The driveway must be constructed so as not to concentrate stormwater runoff onto neighbouring properties Where there is an existing pedestrian path, a matching crossfall must be provided for the driveway on the alignment of the path, for the full width of the path The property access must be located a minimum of 1m clear of existing power poles, streetlights or other signage. The developer is responsible for any necessary relocation of existing services to provide this clearance and must contact the relevant service authorities and comply with their requirements in relation to these works. Earthworks and Retaining Walls All earthworks shall be undertaken in accordance with the provisions of AS 3798 Guidelines on Earthworks for Commercial and Residential Development, with geotechnical testing undertaken in accordance with Section 8 of the Standard, and to a minimum of ‘Level 1’ as defined in Appendix B. Test results as required by AS 3798, and a certificate of quality and uniformity of fill shall be provided by a RPEQ and submitted to Council prior to the commencement of the use or Council signing the Plan of Survey. Fall protection must be provided to retaining walls that are over 1m high. Slope and batters are a maximum grade of: 1 in 6 where in proximity to waterbodies 1 in 4 for grassed areas. 1 in 3 for planted areas 1 in 2 for combined structural engineering and planting solutions. Stormwater Drainage Appropriate scour protection must be provided at the outlet of all stormwater pipes including temporary outlets. Works associated with this permit must not adversely impact on the existing drainage conditions on other properties (eg by blocking or interfering with natural overland flows). Construction of all internal stormwater drainage works must comply with the relevant section/s of Australian Standard AS/NZS 3500.3. Prior to the completion of the development, all site surfaces must be effectively stabilised using methods which have achieved effective short-term stabilisation and which will continue to achieve effective stabilisation in the medium- to long-term (refer to E&SC Advisory Notes). For the purpose of this condition, an effectively stabilised surface is defined as one that does not, or is not likely to result in visible evidence of soil loss caused by sheet, rill or gully erosion or lead to sedimentation, or lead to water contamination. Erosion & Sediment Control Stormwater from the development must not enter the Noosa Springs Lake system until flowing from catchments with a C- Factor of less than 0.01. Any construction necessary to complete areas that flow to the lake system must be scheduled to occur in known dry periods and have appropriate contingency measures available on site to achieve this condition in the event of un-forecast rainfall. A construction hold point with a council delegate and supervising RPEQ must be established prior to commencement of earthworks. The hold point must be held as soon as reasonably practical and prior to the first rain event forecast following initial tree clearing or removal of soil stabilising material. At the hold point inspection, all required sediment basins, drains and bunds to divert waters away from disturbed soil or soils about to become exposed through cut to fill activities must be installed. All areas that will not require earthworks in the imminent cut to fill operation must be stabilised to prevent entrainment of sediments into receiving waters. Cut to fill earthworks in each area must not commence until after the Supervising RPEQ has certified that all installed erosion and sediment controls required by this approval are sized in accordance with conditions of the approval and the written acceptance of the certification is provided to the supervising RPEQ by Council officers. Offsite run-off must be diverted around exposed soils on the site without entraining additional sediments. Discharge from measures to divert the offsite water must not cause run-off impacts to other properties. Measures installed to divert the upstream water must be designed and certified by the supervising RPEQ and installed prior to commencement of bulk earthworks. Any temporary drainage works to manage stormwater flows during the construction phase of development must be designed by the supervising RPEQ to provide a 150mm freeboard and convey the following flow capacities without resulting in visible scour within flow paths: 1 in 2 year event where disturbed area open for less than 12 months 1 in 5 year event where disturbed area open for 12-24 months 1 in 10-year ARI event where disturbed area open for 24 months Minimum 1 in 1 year ARI Hydraulic capacity for temporary culvert crossings All relevant measures detailed in the International Erosion and Sediment Control Book 2008 must be installed and maintained to minimise the amount of sediments entrained in sediments leaving the site as well as avoiding scour and destabilisation of underlying silica sands. Peak 1-year ARI event discharge from the construction phase of development must be equivalent to the pre-development peak 1-year ARI event discharge. Measures included in calculations to achieve management of peak flows must be incorporated into the development in a manner that is consistent with the Noosa Plan, all conditions of the approval and does not interfere with adjoining properties. Prior to the completion of the development, all site surfaces must be effectively stabilised. For the purpose of this condition, an effectively stabilised surface is defined as one that does not, or is not likely to result in visible evidence of soil loss caused by sheet, rill or gully erosion or lead to sedimentation, or lead to water contamination. Water Sensitive Design Prior to commencement of use, the supervising RPEQ must certify must certify that the stormwater infrastructure has been designed and constructed consistent with the approved plans for the site, the Water by Design Bioretention Technical Design Guidelines, relevant aspects of the IPWEAQ Standard Drawing WSUD-drawing series and Construction and Establishment Guidelines: Swales, Bioretention Systems and Wetlands (Water by Design, 2009). During construction and establishment of the bioretention devices, the supervising RPEQ must certify forms contained in section 3.15 of the Construction and Establishment Guidelines: Swales, Bioretention Systems and Wetlands (Water by Design, 2009). These forms and certification must be submitted to council prior to the sealing of the survey plan. A construction hold point with a council delegate must be established once the bioretention device underdrainage pipe work is installed. At the time of inspection, a sample of the drainage layer, transition layer, and filtration media materials must be stockpiled onsite accompanied by laboratory results that demonstrate that the media complies with the specifications contained in the latest version of the Guidelines for Soil Filter Media in Bioretention Systems (Facility for Advancing Water Biofiltration) and that the minimum hydraulic conductivity of 180mm/hr or as specified on the approved engineering plans will be achieved. The drainage layer, transition layer, and filtration media materials shall not be installed until the catchment draining to the bioretention device has 80% groundcover as determined by council’s delegate. Where it is necessary for construction purposes for the drainage and filter media to be installed prior to 80% completion of the catchment, measures must be installed to prevent waters with sediments in excess of 50mgTSS/L filtering through the bio retention filter media or infiltration swales. 80% of the catchment flowing to the bioretention basin must be effectively stabilised prior to the construction holdpoint for the Bioretention device. Bioretention Devices - Landscaping Landscape plans must include a mixture of at least five of the following species for planting in the bioretention basin extended detention surface at a minimum density of 8 plants/m2: Carex appressa Carex fascicularis Ficinia nodosa Juncus usitatis Lomandra longifolia Ghania sieberiana Landscape plans for the areas surrounding the bioretention basin filter media footprint must be arranged to minimise shading to the filter media footprint are. Suitable plants include the following: Carex appressa Carex fascicularis Ficinia nodosa Juncus usitatis Lomandra longifolia Ghania sieberiana Banksia robur Dianella brevipendunculata Themada triandra Cymbopogan refractus Melaleuca thymifolia Where landscaping/garden beds are proposed adjacent to the bioretention basin, or where the basin is located adjacent to naturally forested areas, a 900mm deep root barrier must be installed to the interface between the landscape/garden/forest area and the bioretention basin to prevent root intrusion to the biobasin infrastructure. Landscaping to the surface of the bioretention basin filter media area must not commence until 80% of building work within each contributing catchment is complete or after 3 years, whichever occurs first. An uncompleted works bond of 150% of the value of the planting to the surface of the bioretention basin filter media area must be provided to Council prior to the release of the Plan of Survey. Where required, mulch within the batters of bioretention basins must be installed in a manner that it will not escape into receiving stormwater drainage infrastructure or water courses. Bioretention Devices - Education The development shall be provided with approved permanent signage to educate the public on the function of the bioretention basin. The wording for the signage for each bioretention basin is to include: “BIORETENTION BASIN - This bioretention basin reduces the pollution of our waterways by reducing the amount of heavy metals, litter, suspended solids, and nutrients discharged to receiving waters”. Damage to Services and Assets Any damage caused to existing services and assets as a result of the development works must be repaired at no cost to the asset owner at the following times: where the damage would cause a hazard to pedestrian or vehicle safety, immediately; or where otherwise, upon completion of the works associated with the development. Any repair work which proposes to alter the alignment or level of existing services and assets must first be referred to the relevant service authority for approval. FOLLOWING CONSTRUCTION Certification Upon completion of the works a certificate must be issued by an RPEQ certifying that the works have been constructed in accordance with the Operational Works permit. As Constructed Plans and ADAC XML Files (Council) Prior to acceptance of civil works to become Council assets “On Maintenance”, satisfactory “As-Constructed” records must be submitted to Council. The bundle of “As Constructed” information shall include: As-Constructed Engineering Drawings. Data is to be submitted in an electronic drawing file format (.dwg), with all plans clearly endorsed “As-Constructed”, along with the accompanying hardcopies (PDFs of the As-Constructed .dwg drawing files), and; ADAC XML Digital File. ADAC File format (ADAC - Asset Design As Constructed) prepared in accordance with industry standards and recorded in “MGA - UTM56 / GDA94” projection. Please Note: Further information and advice relating to the as-constructed drawing presentation, as-constructed survey capture and associated guidelines for preparation of a compliant ADAC XML digital file are available on the webpage titled “As-Constructed Guidelines” and accessible at the Noosa Council Website: Planning & Development / Development Tools & Guidelines / As-Constructed Guidelines. The “As-Constructed” drawings will require certification by a: Qualified experienced Civil Engineer (RPEQ) confirming design intent and conformance with applicable standards and specifications, along with the relevant descriptions of assets, services and structures and; Licensed Surveyor in regard to the cadastral and locational information, levels and applicable survey datum. The data must be in accordance with Council’s “Planning Scheme Policy 5 – Engineering Design Standards – Roads, Drainage and Earthworks”, and fully detail the levels for all engineering works including but not limited to the drainage network and structures, finished ground and pavement surface levels. Landscaping, including all assets and improvements within parks, open space and road reserves areas are to be shown on an accompanying separate landscape plan (prepared in .dwg file format with accompanying hardcopy PDFs) and include a complaint ADAC XML file. Details of the landscaping and all associated assets and improvements may be included in the ADAC XML digital file prepared for associated civil infrastructure, or alternatively, be provided as a separate ADAC XML digital file containing landscape and asset information only. The building envelope data must be submitted in both hardcopy and digital format (ADAC XML Digital File). ADAC - Asset Design As Constructed, is to be prepared in accordance with industry standards and recorded in “MGA - UTM56 / GDA94” projection. On Maintenance All municipal works must be accepted ‘On Maintenance’ by Council in accordance with Council’s relevant Planning Scheme Policy prior to plan sealing. To achieve ‘On Maintenance’, the supervising RPEQ must submit to Council: certification that all works have been undertaken and completed in accordance with the requirements of this Permit as Constructed details in accordance with Council’s Planning Scheme Policy maintenance and operational manuals for all proprietary or site specific devices Off Maintenance Prior to requesting an Off Maintenance inspection the developer must provide a written request for the Off Maintenance inspection. A re-inspection fee in accordance with Council’s Fees and Charge Register will be charged where: a Council inspection reveals works do not comply with approval requirements submitted certification falsely states works comply with approval requirements. A final inspection and approval of the new works and completed reinstatement works by Council’s Inspector is required. Please contact Council on 5329 6245 to arrange for the inspection. referral agencies Not applicable. Advisory notes The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions: General Advisory Notes As the works are private structures, the owner bears full responsibly for the standard of their construction, maintenance and any liabilities associated with the construction. It is recommended that professional advice be sought for the construction to ensure that the works are constructed in accordance with the relevant standards. Council has undertaken an audit check of the Operational Works drawings in relations to the proposed works. A detailed check of the calculations and drawings has not been undertaken, as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects of the engineering design. Council reserves the right to require further amendments and/or additions at a later date should design errors become apparent. Council reserves the right to call up any performance bond held or levy charges against the property, should emergency works be required to be undertaken by Council to make the site safe due to inactivity on the development site for extended periods of time. Should any changes or modifications to the approved plans be required as a result of construction constraints, a “Request to change an existing approval” under the Planning Act 2016 must be made. Amended plans clearly indicating the changes must be lodged with this application along with the appropriate fees. Prestart, On and Off Maintenance Inspections Request Contact Council on 5329 6245 to arrange a prestart or an inspection giving a minimum of 5 business days notice of preferred inspection time. If Council officers are required to undertake additional inspections of the same works, a reinspection fee will be applicable in accordance with Council’s Fees and Charges register applicable at the time. A minimum maintenance period of 12 months will apply to all municipal works and thereafter until such time as the works are performing in accordance with the approved design unless noted otherwise Environmental Advisory Notes The Environmental Protection Act 1994 states that a person must not carry out any activity that causes, or is likely to cause, environmental harm unless the person takes all reasonable and practicable measures to prevent or minimise the harm. Environmental harm includes environmental nuisance. In this regard persons and entities, involved in the civil, earthworks, construction and landscaping phases of this development are to adhere to their ‘general environmental duty’ to minimise the risk of causing environmental harm. Erosion and Sediment Control Accepted best practice standards include: the Sunshine Coast Regional Council Manual for Erosion and Sediment Control V1.2 or other superseding document subsequently adopted by Council; Best Practice Erosion and Sediment Control, International Erosion Control Association (2008) As a general rule, a site is determined to have achieved effective short-term stabilisation if at the time of the completion of the works: Methods of stabilisation are: appropriate for slopes and slope lengths; and are consistent with best practice environmental management practices such as in the Manual for Erosion and Sediment Control or the IECA Manual; and Stormwater runoff from the site is not currently, and is not likely to result in visible evidence of sedimentation or erosion, or lead to water contamination. If at the time of request for plan sealing, the method of short-term stabilisation has not achieved a level of stability that Council's Officers believe will have a high probability of achieving long term stability (i.e. until house construction has occurred on all lots), Council Officers may take the following matters into consideration in determining whether the site is capable of achieving medium to long-term stability: evidence that the site has been effectively stabilised in the short term; evidence that soil has been adequately ameliorated; evidence that seed of annual and perennial grass species has been applied at an adequate rate; and that grass seed has germinated at a density that is likely to achieve an effective grass cover. Aboriginal Cultural Heritage Act 2003 There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act). The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries out an activity must take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value of Aboriginal cultural heritage. You should contact the Cultural Heritage Unit on 07 3247 6212 to discuss any obligations under the ACH Act. property notes The following property note will be added to Council’s Rates Records for the subject site This site is provided with stormwater quality treatment devices which capture and store pollutants from stormwater runoff generated on the site. These devices are required to be routinely checked and serviced/cleaned out as per the Altum Constructions Precinct F and E2 Noosa Springs Development Detailed Stormwater Quality Management Plan. Records of maintenance activities undertaken are to be kept and made available to council officers upon request. VARIATION approval Not applicable. further development permits required Type of Development Permit Required Subject of the required Development Permit Development Permit for Operational Works Pathways, Landscaping submissions Not applicable. RIGHTS OF APPEAL You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Planning Act 2016 is attached. During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a negotiated decision notice will be issued. Only one negotiated decision notice may be given. OTHER DETAILS If you wish to obtain more information about the decision, electronic copies are available on line at www.noosa.qld.gov.au or at Council Offices. [word/footer1.xml] Page 13 of 13 [word/header1.xml] 3 [word/header2.xml] DEVELOPMENT ASSESSMENT DELEGATED REPORT
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning OPW17 0612Related documentApplication case desk ↗
About this file
- File size
- 44 KB (small file)
- File type
- DOCX
No other editions are linked here.