SERVICES & ORGANISATION COMMITTEE MEETING AGENDA 9 JUNE 2020
REPORTS FOR CONSIDERATION OF THE COMMITTEE
1 1920T090 TREE MANAGEMENT & MAINTENANCE PREFERRED SUPPLIER
ARRANGEMENT (PSA) - TENDER ACCEPTANCE
DOCUMENT INFORM AT ION
Author Matt Hansen, Parks & Gardens Coordinator
Infrastructure Services Department
Index ECM / Project and Contact / 1920T090 Tree Management Maintenance /
Reports to Council
ECM / Project and Contract / 1920T090 Tree Management Maintenance /
Awarded Contract
ECM / Subject / Contracting / Parks and Reserves
Attachments 1. Evaluation Matrix – Category 1 to Category 4
EXECUTIVE SUMMARY
Tree management and maintenance is a major component of work managed predominantly by
the Parks & Gardens Branch. Contractors are used to perform the bulk of the workload
generated by both proactive and reactive tree works within the Noosa Shire. A number of
contractors are required for the various categories of tree work, which are:
Tree Planting and Establishment
Tree Services (i) Major and (ii) Minor
Specialised Tree Works (e.g. root barrier installation, plant health programs)
Tree Assessment and Consultancy
To accommodate the multitude of these works, a contractor panel (Preferred Supplier
Arrangement) is drawn upon and allocated work on an as needs basis. The approximate value of
tree work undertaken by contractors is around $1.2 million per annum. The panel is also
available to be used by other branches within Council.
RECOMMENDATION
That Council note the report by the Parks and Gardens Coordinator to the Services &
Organisation Committee Meeting dated 9 June 2020 and:
A. Approve the establishment of 1920T090 – Preferred Supplier Arrangement (PSA) for the
provision of Tree Management and Maintenance Services for an initial period of two (2)
years for the suppliers listed in Table 1 PSA Recommended Suppliers within the report;
and
B. Authorise the CEO to approve three (3) optional periods of up to one (1) year each.
Options to extend are solely at the discretion of Council and dependent upon contractor
performance and the ongoing need for the services by Council under the panel.
Page 3 of 26
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.