QLeave · OPW26/0131

of 1

Text shows just the words. Original shows the document exactly as it was published.

                                                                                                QLeave levy number: S-0061653



Notification and Payment Confirmation
This form is to confirm that the levy or first instalment of the levy has been paid, that an exemption from payment of the levy
exists in relation to the work, or that an exemption from immediate payment of levy exists in relation to the work, in accordance
with section 77(2) the Building and Construction Industry (Portable Long Service Leave) Act 1991 (BCI Act). Form BCI 14 v10.

PROJECT DETAILS

                                                                                  Date paid:             30/07/2026
 Internal job reference number    S25MWMP
                                                                                                         Levy payer: AUSMAR
 (if applicable):
 Project owner:                   Matthew Michael Wilson and Megan Margaret Prowd                        HOMES PTY. LTD.
 Principal contractor:            Antony Bryan
 Certifier:                       Suncoast Building Certifiers

 BUILDING AND CONSTRUCTION WORK DETAILS
 Start date:                      29/09/2026                                      Project finish date:   29/09/2027
 Building and construction        DWELLING - HOUSE
 work description:
 Lot no:                          237                                             Plan no:               RP48113
 Building and construction        4 Duke St
 work address:
 Suburb:                          SUNSHINE BEACH QLD                              Postcode:              4567

 LEVY DETAILS
 Total cost of work (GST excl):                        $720,055.00
 Total exempted cost of work (GST excl):                     $0.00
 Total levy paid:                                        $4,140.00

 CONTACT QLEAVE
 Suite 3, Lot 1/62 Crockford St, Northgate QLD 4013 | PO Box 348, Archerfield BC QLD, 4108

 Freecall 1800 803 481 | Email [email protected] | www.qleave.qld.gov.au


 BUILDING AND CONSTRUCTION WORK COMPLETED

 When the building and construction work reaches practical completion, you are invited to submit your final costs and
 completion date to QLeave. If the final cost of work is $50,000 or more than originally notified you must notify QLeave and
 pay any additional levy within 30 days of work ending. Failure to provide these details will result in the commencement of
 enforcement action. To provide QLeave with these details please complete the finalisation form on the portal.

Used in these records

About this file

File size
329 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

QLeave.pdf · 329 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.