Ecological Assessment
Attached to the e-mail Ecological assessment - 4 of 4 MCU16/0081.
The original of this document is very large (16.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Specific Outcomes Probable Solutions Code Response
Steep slopes No solution provided. Not applicable
O13 Vegetation on steep slopes is retained and The development footprint is not steeply sloping.
managed to avoid erosion and landslide and to
protect natural resources and values.
Engineering and site works S14.1 Works, including roads, driveways, Complies with O14
O14 Development is sited and designed to— fences, sewer lines and other infrastructure— To ensure development avoids impacts on
a) provide adequate separation distance between a) do not transect areas of vegetation; or retained vegetation within the existing covenant
the vegetation to be protected and the b) are co-located within a combined utility corridor; area, trees have been surveyed at critical interface
development to avoid disturbing, destabilising and and areas so that adequate separation distances can
deoxygenating any tree or altering the drainage; c) provide for fauna underpasses, speed reduction be calculated. Vegetation within the covenant area
b) avoid traversing or fragmenting vegetation or devices and associated fencing, lighting and will not be fragmented in that the only crossing
habitats for significant flora and fauna species; and warning signs, where appropriate; point will be elevated to enable vegetation
c) avoid creating barriers to faunal movement. AND retention thereunder. An existing barrier to
S14.2 Development within or adjacent to areas of movement will be removed at the southern extent
vegetation, incorporate fauna friendly fences; of the existing covenant area and replaced with a
AND more permeable solution.
S14.3 Vegetation is protected from interference
resulting from clearing or construction activities
by—
a) clearly marking vegetation to be retained with
flagging tape;
b) installing protective fencing around the dripline
of the vegetation and avoid filling and excavation
in these fenced areas; and
c) ensuring stock piling, storage and vehicle
parking occur outside the identified vegetation
areas;
AND
14.4 Low impact construction techniques are used
around vegetation to minimise interference with
the vegetation.
Filling and excavation No solution provided. Complies with O15
O15 Vegetation is not adversely impacted upon by To ensure development avoids impacts on
earthworks and changes to the hydrological retained vegetation within the existing covenant
regime, including changes to ground water levels, area trees have been surveyed at critical interface
flooding levels, run-off and tidal hydraulics. areas so that adequate separation distances can
be calculated. Similarly, earthworks will not
adversely affect existing hydrological regime.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.