Development Application Part 1 of 2 - IDAS Forms 1 & 6 - OPW13/0044
1111111111111111111111111111111111111111111111111111111
c::-
Write code here Z
_)ii,j~i!iifJ (
THIS IS THE NEXT PART
OF A
--
r 6;)S6 10
L
MULTIPLE PART RECORO-’ -
rT
,
t i-~,>
Part
-
OfL
-
Application number: W\s Icdfl-
T:\I&AM\BCS IAM\lNFORMATION
MANAGEMENl’\RECORDS MANAGEMENTlControl
ofRecordslEDRMSlMulti Pan Record Cover Sheet
NEXT PART.xls
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 12 pages
Page 2
(jp(.v13
Application Details - IDAS form 1
(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)
You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application.
For al/ development applications, you must:
. complete this form (Application details -
IDAS form 1)
. complete any other forms relevant to your application
. provide any mandatory supporting information identified on the forms as being required to accompany your
application.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable
Planning Regulation 2009.
Applicant details (note:the applicant is tlie person responsibl~ for making the application and need not be the
owner of the lard. The, pplicant is responsible for ensuring the information provided on alllDAS application forms is
correct. Any development permit or preliminary approval that may be issued as a consequence of this application will
be issued to the applicant) ’I’
Please note: If there is more than one applicant, provide additional applicant details by clicking the ’’Add another
applicant" button below.
Namels (individual or company name in full) IPILE-IT PTY LTD TIA NOOSA JETTY BUILDERS
For companies,contact name IDANNY REED
Postal address Ipo BOX 299 NOOSAVILLE QLD 4566
Contact phone number 10408 137 526
Mobile number (non-mandafry)
Fax number (non-mandatory) 10754743480
e-mail address (non-mandatory) [email protected]
1.What is the nature of development proposed? (tick-all applicable boxes) r
":~<i
,#,~;,
,.’
_"
,._. .~
o material change of use of premises
o building work
[8] operational work
o reconfiguring a lot
Department of Infrastructure and Planning QPlan /’
",1 :~:\..1 Queensland
\., Government
~-
Page 3
ODD
’" !..~ ~-’;:; !
r ~F!IJ!
-,~;b,~o ~:,J~, ’;:
"
2. What type of approval is being .sought1 ": ""oi";’-!l
~,
~.~~.~ ’!;Iil<! 1->;,,,;:,?.w. =<<.~
rl.:’ cr_: I,; l:tz: H
IZl development permit
o preliminary approval
o both provide details below
-
3. Is the application for a mobile and temporary environmentally relevant activity (ERA)? .~~~:~~ ,~~ t,;
~ No
DYes complete table A and then go to question 5
-
4. Location ofthe premises (complete table B andlor table C as applicable. Identify each lot in a separate row) ,
Table B -
street address/lot for the premises or street address/lot on plan for the land adjoining or adjacent to the
premises
Lot on plan
Street Address
description
Local government area
Unit Street Street name and official Post Plan type (e.g. Logan,Cairns)
Lot No.
No. No. suburbllocality name code and plan no.
sunshine coast regional
1 44 The Anchorage, Noosaville 4566 8791 rp91 0421
council
oStreet address I lot on plan
Street address I lot on plan for the land adjoining or adjacent to the premises (appropriate for development in
[8]water
e.g. jetty, pontoon)
Table C -
premises coordinates (appropriate for development in remote areas, over part of a lot or in water e.g.
channel dredging in Moreton Bay)
Coordinates (note: place each set of
coordinates in a separate row) Zone Local government
Datum
reference area (If applicable)
Easting Northing Latitude Longitude
o GDA94
DWGS84
1
o other
5.Total ar~a-of the premises on which ’the development1s p, posed (indicate hectareScon:n’2) :i~ c~;: ’~’.’t’ ,
861m2
6.Current usefs of the piemi~es (e.g.vacant land, ho se!.apartment build ng, cane farm, ~tc.) .~.,,~ ’t",.!’, .J,,:~’\}
"
~" -
t.:.,..
11 I house
7. Provide a brief d’es ription -oftfJe proposal (e.g,s x unit apartment bUild n-g, 30 lot resjden~ al sllbdivis on et~.}
timber jetty
Application Details -
fDAS form 1
Version 1.018 December 2009
Page 4
ODD
8. Is owner’s consent required for this application? (refer10 notes at the end ofthis form for more information)
I8J No
DYes complete either table 0,table E or table F as applicable
-
9. Does the application involve a state resource? (e.g.the application involves state land, or taking quarry t,
materials. Refer to the notes at the enQ of this form for mOle information)
.
~ ~. "J~ "".. I" ,- I>I"’.~
1Z1 No DYes -
complete table G
r ,~_ __
.
10.td’eotify if any of the following apply-to the premises (tick applicable bo)(fes) J
"f’
.~.’_~ ,~!’" -i:~t ’" ~;~~
~
_
~ adjacent to a water body, watercourse or aquifer (e.g creek, river, lake, canal) complete table H -
o on strategic port land under the Transport Infrastructure Act 1994 complete table I
-
o in a tidal water area -
complete table J
Table H Name of water body, watercourse or aquifer
11 Noosa Waters Canal
11. Are there any existing easemenfs Oil the premises? (e.g.for vehicular access;, electricity, ’overland flow,
~~G~ .’
[glNo 0Yes -
ensure the type, location and dimension of each easement is included in the plans submitted
12. Does the proposal include new building work or operational work on the premises? (including any ~~~
,
<\l
services) M~
DNo ~Yes -
ensure the nature, location and dimensions of proposed works are included in plans submitted
13. Is the payment of a portable long service leave levy applicable to this application? (refer to the notes at the
end of this form for more information) !’$
~ No -
Go to question 15 DYes
15.. Has the local govemrrient agreed to appfy a superseded planning s heme to this application under ;J:
section 96 of the Sustainable Planning Act 20091 i
~ No
DYes provide details below
-
16. List below all of the forms and supporting information that ac’company this application (include alllDAS
forms, checklists, mandatory supporting information et that will be submitted as part ofthJs appHcation. Note: this
.
question does not apply {Qr a"pplicatiQos&T1!i1de online,using Smflrt eOA)"
.
.
"
.
,
1
^
fJ. ^:":,~~ 1\’l,1’~,~?~}’~~?! ih
Method of lodgement to
Description of attachment or title of attachment
assessment manager
1 Form 6 over the counter
2 Checklist over the counter
Application Details -
fDAS form 1
Version 1.0 18 December 2009
Page 5
ODD
13 I John Norden Plans
lover the counter
"- .~
":4 j ’: :.-
~
~ ~
~
,.,
17. Applicant’s declaration
~
"I" r:~J s ,"
!;; ~ ~,.,~,,’ 1I~ .
! ~ "
..
~ ’.
By making this application, I declare that all information in this application is true and correct (note:it is
~ unlawful to provide false or misleading information).
Notes for completing this form
Question 8:
. Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is required
for an application. Section 260(1)(e) of the Sustainable Planning Act 2009 provides that if the owner’s consent is
required under section 263,then an application must contain, or be accompanied by, the written consent of the
owner, or include a declaration by the applicant that the owner has given written consent to the making of the
application.
. Owner’s consent is not required for a mobile and temporary ERA.
Question 9:
. Section 264 of the Sustainable Planning Act 2009 provides that if a development involves a state resource, a
regulation may require the application to be supported by certain evidence prescribed under the regulation.
Schedule 14 of the Sustainable Planning Regulation 2009 prescribes the state resources for which evidence is
required to be given, and the evidence required, to support the application.
Question 13:
. The Building and Construction Industry (Portable Long Service Leave) Act 1991 prescribes when the portable
long service leave levy is payable.
. The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy
are prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002.
Question 14:
. The portable long service leave levy need not be paid when the application is made, but the Bu ding and
Construction Industry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a development
permit is issued.
.
Building and Construction Industry Notification and Payment Forms are available from any Queensland post
office or agency, on request from QLeave, or can be completed on the QLeave website at
www.gleave.gld.gov. au. For further information contact QLeave on 1800803481 or www.gleave.gld.gov.au.
Privacy -the information collected in this form will be used by the Department of Infrastructure and Planning (DIP)in
accordance with the processing and assessment of your application. Your personal details will not be disclosed for a
purpose outside of the IDAS process, except where required by legislation (including the Right to Information Act
2009) or as required by Parliament. This information may be stored in a departmental database. The information
collected will be retained as required by the Public Records Act 2002.
OFFICE USE ONLY
Date received
I Reference numbers
NOTIFICATION OF ENGAGEMENT OF A PRNATE CERTIFIER
To:
I Council. I have been engaged as the private certifier for the
building work referred to in this application.
Date of BSA Certification Building
Name
engagement license number classificationls
Application Details -
IDAS form 1
Version 1.018 December 2009
Page 6
DDD
QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable)
Date receipted
QLeave Project Amount form sighted by Name of officer who
Description of the work Number
Date paid
paid ($) assessment sighted the form
manager
11
The Sustainable Planning Act 2009 (SPA)is administered by the Department of Infrastructure and Planning. This
form and all other required application materials should be sent to your assessment manager and any referral
agencies.
-,..."
~~.
Application Details -
IDAS form 1
Version 1.0 18 December 2009
Page 7
I I.
r-""""_’ ’-~
J ,.......
111111 Integrated Development Assessment System form rn i~n ~~r:;-:,
_,_~-- -l"; ~i
:: t_~... ~~.~
Building or operational work assessable
against a planning scheme ICAS form 6 -
(Sustainable Planning Act 2009 version 1,0 effective 18 December 2009)
This form must be completed for development applications for building works or operational work assessable against
a planning scheme.
You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application.
For all development applications, you must:
.
complete Applicant details -
IDAS form 1
. complete any other forms relevant to your application
. provide any mandatory supporting information identified on the forms as being required to accompany your
application.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009.
This form can also be used for development on strategic portland under the Transport Infrastructure Act 1994.
1.What is the nature. f the work that requires assessment against a plan ing scheme1’(tick applic ble ox/es)
[gI building work complete table A
-
D operational work complete table B
-
Table A
What is the nature of the building work made assessable in the planning scheme (e.g.building, repairing, altering,
underpinning, moving or demolishing a building)?
jetty
What type of approval is being sought? (if you have indicated multiple works in the above question, please generate
another Table A to detail each approval request)
[gI development permit o preliminary approval
Are there any current approvals associated with this application? (e.g. material change ofuse)
[gI No DYes -
provide details below
2. What is the dollar value of the proposed building work? (inc GS1, materials and labour) $18,500
Department of Infrastructure and Planning QPlan
J-\-~:\..’
\,
,,’::-.:::.-
Queensland
\"\ Government
Page 8
ODD
,
"~.~.
3. Confirm the following mandatory supporting iJiformatlon ac<companjes this applic~tion -J. .
Confirmation
Method of lodgement
of ,
0 dgement
All applications for operational works
site plans drawn to scale which show the following:
. the location and site area of the land to which the application relates
(relevantland)
. the north point
. the boundaries of the relevant land
. the allotment layout showing existing lots, any proposed lots (including
the dimensions of those lots), existing or proposed road reserves, [gIconfirmed over the counter
building envelopes and existing or proposed open space (note:
numbering is required for all lots)
.
any existing or proposed easements on the relevant land and their
function
.
any access limitation strips
. all existing and proposed roads and access points on the relevant land
a statement about how the proposed development addresses the local
government’s planning schemes and any other planning documents oconfirmed over the counter
relevant to the application
Applications for operational works involving earthworks (filling and excavating)
drawings showing:
.
existing and proposed contours
.areas to be cut and filled
. the location and level of any permanent survey marks or reference
stations used as datum for the works oconfirmed electronic
. the location of any proposed retaining walls on the relevant land and
their height
. the defined flood level (if applicable)
. the defined fill level (if applicable)
Applications for operational works involving roadworks
drawings showing:
. existing and proposed contours
. the centreline or construction line showing chainages, bearings, offsets
jf the construction line is not the centreline of the road and all
intersection points
. information for each curve including tangent point chainages and
offsets, curve radii, arc length, tangent length, superelevation (if
applicable) and curve widening (if applicable)
.kerb lines including kerb radii (where not parallel to centreline) and
tangent point changes (where not parallel to centreline)
.edge of pavement where kerb is not constructed 0confirmed
.
position and extent of channelisation
.location and details of all traffic signs, guideposts, guardrail and other
street furniture
.
pavement markings including details on raised pavement markers
. catch pit, manhole and pipeline locations
.drainage details (if applicable)
.crossroad drainage culverts (if applicable)
.concrete footpaths and cycle paths
. location and details for access points, ramps and invert crossings
.
changes in surfacing material
Building and operational work assessable against a planning scheme IDAS form 6
-
Version 1.018 December 2009
Page 9
ODD
Confirmation
Method of lodgement
of lodgement
Applications for operational works involving stormwater drainage
drawings showing:
. existing and proposed contours
. drainage locations, diameters and class of pipe, open drains and
easements
oconfirmed
. manhole location, chainage and offset or co-ordinates and inlet and
outlet invert levels
. inlet pit locations, chainage and offset or co-ordinates and invert and
kerb levels
Applications for operational works involving water reticulation
drawings showing:
. kerb lines or edge of pavement where kerb is not constructed
. location and levels of other utility services where affected by water
reticulation works
.
pipe diameter, type of pipe and pipe alignment
. water main alignments
o confirmed
. water supply pump station details (if applicable)
. minor reservoir details (if applicable)
. conduits
. location of valves and fire hydrants
. location of house connections (if applicable)
. location of bench marks and reference pegs
Applications for operational works involving sewerage reticulation
drawings showing:
. location of all existing and proposed services
. location of all existing and proposed sewer lines and manhole locations
. location of all house connection branches
.kerb lines or edge of pavement where kerb is not constructed
.chainages Dconfirmed
.design sewer invert levels
.design top of manhole levels
. type of manhole and manhole cover
. pipe diameter, type of pipe and pipe alignment
. location of house connections (if applicable)
.sewer pump station details (if applicable)
Applications for operational works involving street lighting
drawings showing:
. location of all light poles and service conduits
. location of all other cross road conduits
.
type of wattage and lighting
oconfirmed
.
any traffic calming devices
. additional plans for roundabouts and major roads (if applicable)
. details of any variations to normal alignment
. details of lighting levels
Building and operational work assessable against a planning scheme IDAS fonn 6
-
Version 1.018 December 2009
Page 10
ODD
Confirmation
Method of lodgement
of lodgement
AppJications for operationaJ works invoJving pubJic utHity services
drawings showing:
.
any existing light poles and power poles
.
any existing underground services
Oconfirmed
. details of proposed services
. alternation to existing services
Applications for operational works involving landscaping works
drawings showing:
. the location of proposed plant species
.a plant schedule indicating common and botanical names, pot sizes
and numbers of plants
.planting bed preparation details including topsoil depth, subgrade
preparation, mulch type and depth, type of turf, pebble, paving and Oconfirmed
garden edge
.the location and type of any existing trees to be retained
. construction details of planter boxes, retaining walls and fences
. the proposed maintenance period
. irrigation system details
Notes for completing this form:
. This form can also be used for development applications for building works or operational works assessable
against the land use plan for Cairns airport land or Mackay airport land. Whenever a planning scheme is
mentioned, take it to mean the land use plan for the airport land.
Privacy -please refer to your assessment manager for further details on the use of information recorded in
this form.
OFFICE USE ONLY
Date Received I Reference Numbers
The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning. This form and
all other required application materials should be sent to your assessment manager and any referral agencies.
"’
Building and operational work assessable against a planning scheme IDAS form 6
-
Version 1.0 18 December 2009
Page 11
-. ..’ 1 I
. ,
r---’ j’ !-J:.:.-.
111111 .
Integrated Development Assessment System Checklist rfJ_Jn L~9~, L.J ~-
[-1
< .
j
’s
Development assessment checklist IDAS -
checklist 1
(Sustainable Planning Act 2009, version 1.0 18 December 2009)
This checklist applies to the carrying out of development generally.
You are not required to complete this checklist as part of your development application, however you may submit the
checklist with your application if you wish. The purpose of the checklist is to assist you in identifying:
whether you need to make a development application for the proposed development
if a development application is required, the relevant IDAS forms you need to complete as part of your application
whether you need to give a copy of your application to any referral agencies.
If your development involves a material change of use, reconfiguring a lot or operational works, it is recommended
that you complete Material change of use IDAS checklist 2, Reconfiguring a lot IDAS checklist 3or Operational
- -
works /OAS checklist 4, as applicable.
-
If you are unsure how to answer any questions on this checklist, phone or visit your local government, or go to the
Department of Infrastructure and Planning’s website at www.dip.qld.gov.au.
All terms used in this checklist have the meaning given in the Sustainable Planning Act 2009 or the Sustainable
Planning Regulation 2009.
~; ~ ~
.iI:o.’_ ,"- ~ ...~
.~.
"!;li’ J
~
~ -~!’t
;,o:1~" it:’
Part 1 ~General questions ~!~
-c
;;,:", ~
",’_’I!:.li.
r _~ ’I ;- 1. v,_"’c ’"
~
~ " .~ (f’ .
.. !
<;;
:~. ~ ~ l’
l ~
1.1 Have you received a referral agency response in relation to this propos development,prior to making
an application? .’i.i
~No
. To assist you in preparing your application, completing Referral agency responses -IDAS checklist
DYes
6 is recommended
1.200 you wish the proposed development to be assessed against a superseded planning scheme?
I2l No
. You must complete Request to apply a superseded planning scheme -
Sustainable Planning Act
DYes form 2and give this notice to the relevant local government. If the local government agrees to
your request, details must be provided in Application details -IDAS form 1
1.3 Does the proposal involve removing quarry material from a watercours.eor lake for which an jlllocation
notice is .required under the W"t~r Act 2ooO?
[gINo
DYes . It is recommended that you complete part 2 of this checklist
1.4 Is any part of the proposed development inten ed to be carried out on a Queensland heritage place under
’
the Queensland Heritage Act 1992?
[gI No
DYes . It is recommended that you complete part 3 of this checklist
Department of Infrastructure and Planning QPlan <-’
\’ \ ;~:\..i
...~~
Queensland
\"Government
Page 12
DDD
’
1.5 Does the proposal involve dev~lopment on a local heritage place? ~~.}:~-;~1’"’~:i’~~;;, ’:’,’1,~’ ~~IIf~:
l
1XI No
DYes . It is recommended that you complete part 4 of this checklist
1.6 Does the- proposal irwolve an environmentally relevant activit}!, other than an agricultural ERA,.a mining
activity or a chapter SA activity? ~
~No
DYes . It is recommended that you complete part 5 of this checklist
1.7 Is any part of the development on strategic port land or airport land (otherthan development for a
malerial change of use that is inconsistentwith the land use plan for the strategic port land or airport land)
~No
DYes . It is recommended that you complete part 6 of this checklist
1,8 Is any part of the;development on land below a high water marl< within the limits of a port und~r the.
Ttmsport Infrastructure Act 1994?
IZlNo
DYes . It is recommended that you complete part 7 of this checklist
1.9 Is any part of the Pfemises_ designated for community infrastructure? f~,;:, ?
IZl No
DYes . It is recommended that you complete part 8 of this checklist
1.10 Does the proposal involve the establishment or expansion of a waste water disposal system?
~No
DYes . It is recommended that you complete part 9 of this checklist
~ -
1.11 Is the development on htnd that adjoins ~ declared fish habitat area under the Fisheries Act 1994?
t81No
DYes . It is recommended that you complete part 10 of this checklist
Privacy please refer to your assessment manager for further details on the use of information recorded in
-
this checklist.
Disclaimer:
While the Department of Infrastructure and Planning (DIP)believes that this information contained on this
checklist and provided as part of this process will be of assistance to you, it is provided on the basis that you will
not rely on the information without first making your own enquiries regarding the interpretation and application of
the applicable legislation to your circumstances.
To the full extent permitted by law DIP expressly disclaims all liability (including but not limited to liability for
negligence) for errors or omissions of any kind or for any loss (including direct and indirect losses), damage or
other consequence which may arise from your reliance on this process and the information contained on this
checklist.
Development application assessment checklist -
IDAS checklist 1
Version 1,018 December 2009
Page 13
DDD
OFFICE USE ONLY
Date received I Reference numbers
The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning.
Development application assessment checklist -IDAS checklist 1
Version 1.018 December 2009
Used in these records
Development Application Part 1 of 2 - IDAS Forms 1 & 6 - OPW13/0044Related documentApplication case desk ↗
About this file
- File size
- 8.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.