Original source · versioned page text
2021-01-27 Special Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
SPECIAL MEETING AGENDA 27 JANUARY 2021
“Timber use is a theme throughout the playground, particularly in the design of ancillary
shelter structures and furniture.”
Extensive community consultation was conducted by a contracted consultant to engage and report
on community comments and concerns.
The reports from this community consultation relevant to the 2019 design include:
support for the development of the Lower Mill Site for community use;
support for the landscaping and trail design that links the overflow parking on the northern
side of the river to the town centre;
appreciation of the BBQ and picnic facilities to be provided;
encouragement to providing meeting spaces; support for the protection of the riparian zone
and related vegetation buffer;
encouragement to remove weed species from the riparian zone;
support for open green space provided;
concern for the limited size of the space to include buildings;
the need to consider the flood prone nature of the site;
the need to ensure that the development does not cause an increase in upstream flood
levels; and
the need of additional parking spaces.
2006 – Works & Community Services Committee Report published. The publically available Noosa
Council Works & Community Services Report 2006 discussed the implementation of the Design
for Living Lower Mill Masterplan concept.
2008 March - Noosa Council merger with Shire of Maroochy and City of Caloundra to form
Sunshine Coast Region.
2010 – New Cooroy Library Built Community consultation was conducted with the regard to the
design features and location of the Cooroy Library, adjacent to the Lower Mill site.
2014 January - Noosa Council re-established
2015 – Council reviewed Town Centre infrastructure priorities prior to the merger and recognise
the identification of an iconic nature based playground to be constructed in the Noosa hinterland.
2015/16 – Funding approved in 2015/2016 Capital Works Budget for Planning & Design for a
Hinterland Playground
2016 – Council Meeting Hinterland Playground Concept Presentation
Staff presented the options for the location of a nature based, all-abilities Hinterland playground.
The evaluation for a playground space within the townships of Cooroy, Cooran, Pomona and Kin
Kin included:
Available space;
minimisation of environmental impacts;
existing facilities;
connectivity to services
parking; and
economic development.
Cooroy was chosen as the preferred location due to the site assessments and historical nature of
the site relating to its proposed development as a community use facility.
Councillors provided positive feedback on the proposal of a nature based playground at Cooroy.
Page 13 of 41
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.