Council archive · source document
engineering plans · MCU24/0074
Plans and drawings: the text below has words only, no drawings.
Very large file (41.3 MB): may take a few minutes to open.
Original PDF page 3, section 2. The text section number identifies this passage in the reader.
S
dD
PIT TO BE DEMOLISHED
5.1m
AND CONVERT TO
4m
EXISTING KERB AND
6.5m
GRATED INLET
CHANNEL TYPE B1 AS PER
WM NSC STD DWG RS-080
dWM
PROPOSED ATLAN
HYDROCHANNEL
ACCESS EASMENT
ONE WAY
dWM
2 0 2 4 6 8 10
SCALE (metres)
1 : 200 (FULL SIZE)
North Point Approved Project Address Title
203 GYMPIE TERRACE GENERAL ARRANGEMENT PLAN - GROUND FLOOR
N
QLD 4566
For and on behalf of RECOR Pty Ltd.
C 20.12.24 REVISED MCU SUBMISSION MP BW Scale ENGINEERING + PROJECT MANAGEMENT Client Details PROJECT NAME: Project Number Sheet Size
SUNSHINE COAST | BRISBANE | SYDNEY
B 31.05.24 MCU APPROVAL DC AB www.recorconsulting.com | ABN 89 647 469 707 GYMPIE TERRACE PTY. LTD PROPOSED MIXED USE 20220269 A1
A 06.06.23 FOR APPROVAL QT BP
AS SHOWN COPYRIGHT © This drawing is subject to copyright in accordance with the agreement between RECOR Pty Ltd and RECOR's client. This DEVELOPMENT Drawing Number Revision
010 C
drawing shall only be used for this specific project. This drawing shall not be used for construction until marked as 'Issued For Construction' in
Rev Date Revision Description Drawn Check DO NOT SCALE, IF IN DOUBT ASK the revision description.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
engineering plans.pdfRelated documentApplication case desk ↗
About this file
- File size
- 41.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.