Architectural Plans Received 11.8.2020 · MCU20/0087

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
       1. FALLS, SLIPS, TRIPS                                                           2. FALLING OBJECTS                                                                          5. MANUAL TASKS                                                                                7. CONFINED SPACES
                                                                                               LOOSE MATERIALS OR SMALL OBJECTS                                                       Components within this design with a mass in excess of 25kg                                    EXCAVATION
       a) WORKING AT HEIGHTS                                                                                                                                                          should be lifted by two or more workers or by mechanical lifting
                                                                                               Construction, maintenance or demolition work on or around this                                                                                                                        Construction of this building and some maintenance on the
           DURING CONSTRUCTION                                                                 building is likely to involve persons working above ground level or                    device. Where this is not practical, suppliers or fabricators should                           building will require excavation and installation of items within
           Wherever possible, components for this building should be                           above floor levels. Where this occurs one or more of the following                     be required to limit the component mass.                                                       excavations. Where practical, installation should be carried out
           prefabricated off-site or at ground level to minimise the risk of                   measures should be taken to avoid objects falling from the area                        All material packaging, building and maintenance components                                    using methods which do not require workers to enter the
           workers falling more than two metres. However, construction of this                 where the work is being carried out onto persons below.                                should clearly show the total mass of packages and where                                       excavation. Where this is not practical, adequate support for the
           building will require workers to be working at heights where a fall in              1. Prevent or restrict access to areas below where the work is                         practical all items should be stored on site in a way which                                    excavated area should be provided to prevent collapse. Warning
           excess of two metres is possible and injury is likely to result from such               being carried out.                                                                 minimises bending before lifting. Advice should be provided on                                 signs and barriers to prevent accidental or unauthorised access to
           a fall. The builder should provide a suitable barrier wherever a                    2. Provide toeboards to scaffolding or work platforms.                                 safe lifting methods in all areas where lifting may occur.                                     all excavations should be provided.
           person is required to work in a situation where falling more than                   3. Provide protective structure below the work area.                                   Construction, maintenance and demolition of this building will
           two metres is a possibility.                                                        4. Ensure that all persons below the work area have Personal                           require the use of portable tools and equipment. These should be
                                                                                                                                                                                                                                                                                     ENCLOSED SPACES
                                                                                                                                                                                                                                                                                     For buildings with enclosed spaces where maintenance or other
           DURING OPERATION OR MAINTENANCE                                                         Protective Equipment (PPE).                                                        fully maintained in accordance with manufacturer’s
                                                                                                                                                                                                                                                                                     access may be required:
           For houses or other low-rise buildings where scaffolding is                                                                                                                specifications and not used where faulty or (in the case of
                                                                                               BUILDING COMPONENTS                                                                                                                                                                   Enclosed spaces within this building may present a risk to persons
           appropriate:                                                                                                                                                               electrical equipment) not carrying a current electrical safety tag.
                                                                                                                                                                                                                                                                                     entering for construction, maintenance or any other purpose. The
           Cleaning and maintenance of windows, walls, roof or other                           During construction, renovation or demolition of this building, parts of               All safety guards or devices should be regularly checked and
                                                                                                                                                                                                                                                                                     design documentation calls for warning signs and barriers to
           components of this building will require persons to be situated                     the structure including fabricated steelwork, heavy panels and many                    Personal Protective Equipment should be used in accordance
                                                                                                                                                                                                                                                                                     unauthorised access. These should be maintained throughout the
           where a fall from a height in excess of two metres is possible. Where               other components will remain standing prior to or after supporting                     with manufacturer’s specification.                                                             life of the building. Where workers are required to enter enclosed
           this type of activity is required, scaffolding, ladders or trestles should          parts are in place. Contractors should ensure that temporary bracing
                                                                                                                                                                                                                                                                                     spaces, air testing equipment and Personal Protective Equipment
           be used in accordance with relevant codes of practice,                              or other required support is in place at all times when collapse which
                                                                                                                                                                                                                                                                                     should be provided.
           regulations or legislation.                                                         may injure persons in the area is a possibility.                                     6. HAZARDOUS SUBSTANCES
           For buildings where scaffold, ladders, trestles are not appropriate:                                                                                                       ASBESTOS                                                                                       SMALL SPACES
                                                                                               Mechanical lifting of materials and components during construction,                                                                                                                   For buildings with small spaces where maintenance or other access
           Cleaning and maintenance of windows, walls, roof or other                                                                                                                  For alterations to a building constructed prior to 1990:
                                                                                               maintenance or demolition presents a risk of falling objects.                                                                                                                         may be required:
           components of this building will require persons to be situated                                                                                                            If this existing building was constructed prior to:
                                                                                               Contractors should ensure that appropriate lifting devices are used,                                                            asbestos                                              Some small spaces within this building will require access by
           where a fall from a height in excess of two metres is possible. Where                                                                                                      1990 - it therefore may contain
                                                                                               that loads are properly secured and that access to areas below the                                                                     asbestos                                       construction or maintenance workers. The design documentation
           this type of activity is required, scaffolding, fall barriers or Personal                                                                                                  1986 - it therefore is likely to contain
                                                                                               load is prevented or restricted.                                                                                                                                                      calls for warning signs and barriers to unauthorised access. These
           Protective Equipment (PPE) should be used in accordance with                                                                                                               either in cladding material or in fire retardant insulation material. In
                                                                                                                                                                                                                                                                                     should be maintained throughout the life of the building. Where
           relevant codes of practice, regulations or legislation.                                                                                                                    either case, the builder should check and, if necessary, take
                                                                                        3. TRAFFIC MANAGEMENT                                                                         appropriate action before demolishing, cutting, sanding, drilling or
                                                                                                                                                                                                                                                                                     workers are required to enter small spaces they should be
                                                                                                                                                                                                                                                                                     scheduled so that access is for short periods. Manual lifting and
                                                                                               For building on a major road, narrow road or steeply sloping road:                     otherwise disturbing the existing structure.
                                                                                                                                                                                                                                                                                     other manual activity should be restricted in small spaces.
         b) SLIPPERY OR UNEVEN SURFACES                                                        Parking of vehicles or loading/unloading of vehicles on this roadway                   POWDERED MATERIALS
                                                                                               may cause a traffic hazard. During construction, maintenance or
             FLOOR FINISHES By Owner                                                           demolition of this building designated parking for workers and loading
                                                                                                                                                                                      Many materials used in the construction of this building can cause                           8. PUBLIC ACCESS
                                                                                                                                                                                      harm if inhaled in powdered form. Persons working on or in the                                 Public access to construction and demolition sites and to areas
             If designer has not not been involved in the selection of surface                 areas should be provided. Trained traffic management personnel
             finishes, the owner is responsible for the selection of surface finishes                                                                                                 building during construction, operational maintenance or demolition                            under maintenance causes risk to workers and public. Warning
                                                                                               should be responsible for the supervision of these areas.
             in the pedestrian trafficable areas of this building. Surfaces should                                                                                                    should ensure good ventilation and wear Personal Protective                                    signs and secure barriers to unauthorised access should be
                                                                                               For building where on-site loading/unloading is restricted:
             be selected in accordance with AS HB 197:1999 and AS/NZ                                                                                                                  Equipment including protection against inhalation while using                                  provided. Where electrical installations, excavations, plant or loose
                                                                                               Construction of this building will require loading and unloading of
             4586:2004.                                                                                                                                                               powdered material or when sanding, drilling, cutting or otherwise                              materials are present they should be secured when not fully
                                                                                               materials on the roadway. Deliveries should be well planned to avoid
             STEPS, LOOSE OBJECTS AND UNEVEN SURFACES                                                                                                                                 disturbing or creating powdered material.                                                      supervised.
                                                                                               congestion of loading areas and trained traffic management
             Due to design restrictions for this building, steps and/or ramps are              personnel should be used to supervise loading/unloading areas.                         TREATED TIMBER
             included in the building which may be a hazard to workers carrying                For all buildings:                                                                     The design of this building may include provision for the inclusion of                       9. OPERATIONAL USE OF BUILDING
             objects or otherwise occupied. Steps should be clearly marked with                Busy construction and demolition sites present a risk of collision where               treated timber within the structure. Dust or fumes from this material                          RESIDENTIAL BUILDINGS
             both visual and tactile warning during construction, maintenance,                 deliveries and other traffic are moving within the site. A traffic                     can be harmful. Persons working on or in the building during
             demolition and at all times when the building operates as a                                                                                                                                                                                                             This building has been designed as a residential building. If it, at a
                                                                                               management plan supervised by trained traffic management                               construction, operational maintenance or demolition should ensure
             workplace.                                                                                                                                                                                                                                                              later date, it is used or intended to be used as a workplace, the
                                                                                               personnel should be adopted for the work site.                                         good ventilation and wear Personal Protective Equipment including
             Building owners and occupiers should monitor the pedestrian                                                                                                                                                                                                             provisions of the Work Health and Safety Act 2011 or subsequent
                                                                                                                                                                                      protection against inhalation of harmful material when sanding,                                replacement Act should be applied to the new use.
             access ways and in particular access to areas where maintenance
             is routinely carried out to ensure that surfaces have not moved or         4. SERVICES                                                                                   drilling, cutting or using treated timber in any way that may cause
                                                                                               GENERAL                                                                                harmful material to be released. Do not burn treated timber.
             cracked so that they become uneven and present a trip hazard.
             Spills, loose material, stray objects or any other matter that may                Rupture of services during excavation or other activity creates a                      VOLATILE ORGANIC COMPOUNDS
             cause a slip or trip hazard should be cleaned or removed from                     variety of risks including release of hazardous material. Existing                     Many types of glue, solvents, spray packs, paints, varnishes and
             access ways.                                                                      services are located on or around this site. Where known, these are                    some cleaning materials and disinfectants have dangerous
                                                                                                                                                                                                                                                                                   10.OTHER HIGH RISK ACTIVITY
             Contractors should be required to maintain a tidy work site during                identified on the plans but the exact location and extent of                           emissions. Areas where these are used should be kept well                                      All electrical work should be carried out in accordance with         Code
             construction, maintenance or demolition to reduce the risk of trips               services may vary from that indicated. Services should be located                      ventilated while the material is being used and for a period after                             of Practice: Managing Electrical Risks at the Workplace, AS/NZ
             and falls in the workplace. Materials for construction or                         using an appropriate service (such as Dial Before You Dig),                            installation. Personal Protective Equipment may also be required.                              3012 and all licensing requirements.
             maintenance should be stored in designated areas away from                        appropriate excavation practice should be used and, where                              The manufacturer’s recommendations for use must be carefully                                   All work using Plant should be carried out in accordance with
             access ways and work areas.                                                       necessary, specialist contractors should be used.                                                                                                                                     Code of Practice: Managing Risks of Plant at the Workplace.
                                                                                                                                                                                      considered at all times.
                                                                                               Locations with underground power:                                                                                                                                                     All work should be carried out in accordance with            Code of
    THESE NOTES MUST BE READ AND UNDERSTOOD                                                    Underground power lines MAY be located in or around this site. All                     SYNTHETIC MINERAL FIBRE                                                                        Practice: Managing Noise and Preventing Hearing Loss at Work.
                                                                                               underground power lines must be disconnected or carefully                              Fibreglass, rockwool, ceramic and other material used for thermal or                           Due to the history of serious incidents it is recommended that
    BY ALL INVOLVED IN THE PROJECT.                                                            located and adequate warning signs used prior to any                                   sound insulation may contain synthetic mineral fibre which may be                              particular care be exercised when undertaking work involving steel
    THIS INCLUDES (but is not excluded to): OWNER,                                             construction, maintenance or demolition commencing.
                                                                                               Locations with overhead power lines:
                                                                                                                                                                                      harmful if inhaled or if it comes in contact with the skin, eyes or other
                                                                                                                                                                                      sensitive parts or the body. Personal Protective Equipment including
                                                                                                                                                                                                                                                                                     construction and concrete placement. All the above applies.

    BUILDER, SUB-CONTRACTORS,                                                                  Overhead power lines MAY be near or on this site. These pose a risk
                                                                                               of electrocution if struck or approached by lifting devices or other
                                                                                                                                                                                      protection against inhalation of harmful material should be used when
                                                                                                                                                                                      installing, removing or working near bulk insulation material.
    CONSULTANTS, RENOVATORS,                                                                   plant and persons working above ground level. Where there is a
                                                                                               danger of this occurring, power lines should be, where practical,                      TIMBER FLOORS
    OPERATORS, MAINTAINERS, DEMOLISHERS.                                                       disconnected or relocated. Where this is not practical adequate
                                                                                               warning in the form of bright coloured tape or signage should be
                                                                                                                                                                                      This building may contain timber floors which have an applied finish.
                                                                                                                                                                                      Areas where finishes are applied should be kept well ventilated during
                                                                                               used or a protective barrier provided.                                                 sanding and application and for a period after installation. Personal
                                                                                                                                                                                      Protective Equipment may also be required. The manufacturer’s
                                                                                                                                                                                      recommendations for use must be carefully considered at all times.

                                                                                                         No.                              Description                     Date
                                                                                                                                                                                 Working Drawings                                                                 Safe Design Notes




                                                                                                                                                                                                                                                                                                                                                                         29/07/2020 8:13:47 AM
                                                                                                                                                                                 Ric Stevens
                                                                                                                                                                                 199 Maximillian Road                                                             Project number      2440 REV 3                                                              Revision

D E S I G N E RS : T I M & P H I L C H R I S T O P H E R           &     AS SOCIATES
email : [email protected] www.christopherdesigngroup.com.au BDAQ member
                                                                                                                                                                                 North Shore                                                                      Date                       29-7-20                Sheet 25
                                                                                                                                                                                                                                                                  Drawn by                           TC
CHRISTOPHER DESIGN GROUP PTY LTD QBCC LICENSE No. 1307316
5/70 Bulcock Street CALOUNDRA Qld AUSTRALIA
                                                                             ACN 604467450
                                                                     OFFICE PH: 07 5491 4666
                                                                                                                                                                                 Proposed Residence                                                               Checked by                         TC        Scale                                          1 : 100

Used in these records

About this file

File size
4.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Architectural Plans Received 11.8.2020.pdf · 4.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.