06/1015 - Application to Extend Currency Period [As Published] · 142006.1015.02
a
INTEGRATED PLANNING ACT 1997 Form 2, Version 4.1, 3 March 2008
4. Can the premises best be identified by coordinates (e.g. for development proposed in waters, or on a site within a large rural iol}?
X] No
L] Yes - Complete Table D
5. Whatis the total area that makes up the premises (Le. the area covered by the application)?
" Area of land above high water markloutside watefoourse “-Avea in a water body or watercourse
Om fd hectares | 4 m C hectares
(Tick applicable unit) , (Tick applicable unit)
6.71
{Owner's consent and resource owner’s-agreement _ . |
6. Is the person making the request the owner of the land to which the approval attaches?
XX] Yes Oo No - Complete Table E - provide details for each owner on a separate row, or on an attachment fo this form if applicable. Note: Advice
provided at the end of this form details when owner's consent is not required.
7. _ If an application for the existing approval were being made now (i.e. at the time of making this request), would evidence be required to
support the application because it involved taking or interfering with a State-owned resource prescribed by schedule 10 of the integrated
Planning Regulation 1998 (IP Reg) or any other regulation
& No oO Yes - Complete Table F and submit, with the application, written agreement to the request.
iNature of the request - |
8, Whatis the nature of the request for change? (Tick the applicable box/es)
{XJ An extension of the period before an approval lapses {under IPA, section 3.5.22)
(1 To change the development approval other than a change of condition (under IPA, section 3.5.24)
CL] To change or cancel a condition of approval (under IPA, section 3.5.33) - Go fo Q11
oO To change conditions of a rezoning approval given under the Local Goverment (Planning and Environment) Act 1990 (under IPA,
section 6.1.35A) - Go fo Q12
9. Were one or more concurrence agencies involved in the approval?
oO No X Yes - Complete Table G. Submit, with the application, a copy of the notice required to be sent to each agency under IPA sections
3,5,22(1)(a) and 3,5.24(1)(b).
hconcurrenceagency Nate Tiotice Sef
. Bach concu agency » .. _| ‘Date notice sent
” (usé.a separate row for each agency) *
Table G : 7
=
Cepartment of Natural Resources and Water
10. Does the request for change relate to an aspect of the approval that involved a building referral agency?
KX] No (J Yes - Complete Table H. Submit, with the application, a copy of the notice required to be sent to each agency under IPA section
3.5.24(1)(0).
Details and reasons or justification for the request : : . |
11. What are the details of the requested change and the reasons or justification for the change? Use a different row for each change if more
than one.
Details: of requested change (including extension of the period ifrelevan))|. . a» Reasons ot justification for the requested change :
1 | Extension of Currency Period Approved Works progressing but not yet completed.
‘Mandatory attachments and information , : - - |
12. What are the mandatory attachments and supporting information accompanying this application?
Description of attachment or information :
" (e.g. notice fo concurrence /building referral agencies, vs __ Title and date ft applet) Method of delivery to
owner's consent, resource owner's agreement, drawings, reports} (e.g.James Street Traffic Report) assessment manager
{ | Notice to Advice Agency mail
nm
Covering Letter mail
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/1015 - Application to Extend Currency Period [As Published]Related documentApplication case desk ↗
About this file
- File size
- 348 KB (small file)
- File type
No other editions are linked here.