Skip to the record
Noosa's #1 Council Tracker.

Council archive · source document

Decision Notice - Approved by Delegation of Authority OPW24/0151 (As published)

of 12

Text shows just the words. Original shows the document exactly as it was published.

               PRIOR TO COMMENCEMENT OF WORKS
                      Engineering
               6.     Prior to requesting a prestart meeting:
                      a.      Submit to Council an amended Bushfire Management Plan in accordance with
                              Condition 9 of the higher order RAL24/0003.
                      b.      Submit to Council a rehabilitation species palette for the covenant area made up of
                              species selected from Regional Ecosystem 12.11.10 described as ‘notophyll vine
                              forest’
               7.     All necessary approvals from external service providers and external parties on which the
                      development works are proposed have been obtained and a copy supplied to Council.
               8.     A condition report including photographs of the frontage of the site must be completed and
                      submitted to council at the prestart meeting / prior to any works commencing.
               9.     Certificates demonstrating currency of public liability insurance and works insurance covering
                      the works must be submitted to Council prior to the prestart meeting.
               10.    Council must be contacted at least 5 working days prior to any works commencing to
                      organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The
                      pre-start meeting must include the relevant parties for the following aspects of the works:
                      a.      Civil engineering works;
                      b.      Landscape works;
                      c.      Rehabilitation / Revegetation works;
                      d.      Erosion and sediment control works; and
                      e.      Other relevant parties.
               11.    A preliminary Construction Management Plan must be submitted with the Operational Works
                      application and must address the following:
                      a.      Traffic management during all phases of construction;
                      b.      Adequate parking arrangements for works and deliveries;
                      c.      appropriate traffic signage in accordance with the Manual of Uniform Traffic Control
                              Devices (MUTCD); and
                      d.      provision for safe vehicle and pedestrian access across the frontage of the site both
                              during daily construction and after daily construction has ceased.
               12.    Any changes to the details associated with the supervising RPEQ or Principal Contractor
                      during construction, must be notified to council in writing within five business days of the
                      change occurring.
               13.    Any conflict between the development and an existing or proposed service must be referred
                      to the relevant service authority for determination prior to commencement of works.




                                                                                                      Page 3 of 12
Document Set ID: 23436055
Version: 4, Version Date: 07/01/2025

Used in these records

About this file

File size
170 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - Approved by Delegation of Authority OPW24_0151 (As published).pdf · 170 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.