Decision Notice - Approved by Delegation of Authority OPW24/0151 (As published)

of 12

Text shows just the words. Original shows the document exactly as it was published.

                      FOLLOWING CONSTRUCTION / PRIOR TO COUNCIL SIGNING THE PLAN OF SURVEY
                      Bonds
               44.    Bonds must:
                      a.      Meet the requirements of the relevant Council Planning Scheme Policy for performance
                              and uncompleted works.
                      b.      Be calculated using a schedule of works and relevant bond equation.
                      c.      Include GST.
                      d.      Have approval of the bond calculations and amount from Council, prior to lodgement.
                      e.      Be lodged with Council and accompanied by the Bond Administration Fee/s.
                      f.      Be requested for release by writing to Council, when relevant approval requirements
                              have been met.
               45.    Performance Bonds must be lodged for:
                      a.      Rehabilitation.
                      On Maintenance
               46.    Maintenance periods* must be:
                      a.      36 months for Rehabilitation
                      *(Refer to Advisory Note)
               47.    Prior to requesting an On Maintenance inspection, the following information package
                      (prepared by respective qualified persons* and certifying compliance with approvals) must
                      be submitted to Council:
                      a.      All required bonds.
                      b.      Rehabilitation / Revegetation certification.
                      Off Maintenance
               48.    Prior to requesting an Off Maintenance inspection, the following must be provided:
                      a.      Completion of all rehabilitation works
                      b.      Written request of bond release.
               49.    Off Maintenance Inspection must be requested:
                      a.      By contacting Council.*
                      b.      Only after lodgement of a completed rehabilitation certification
                      *(Refer to Advisory Note)
                      Certification
               50.    Upon completion of the work a certificate must be issued by an RPEQ certifying that the
                      works have been constructed in accordance with the Operational Works permit.
               51.    A final inspection and approval of the new driveway and completed reinstatement works by
                      Council’s Inspector is required. Please contact Council on 5329 6500 to arrange for the
                      inspection.
               5.     REFERENCE DOCUMENTS

                Plan No.        Rev.    Plan/Document Name                                       Date

                2251-           B       Coversheet and Drawing Index, prepared by, 10/24
                101                     Callaghan & Toth




                                                                                                        Page 8 of 12
Document Set ID: 23436055
Version: 4, Version Date: 07/01/2025

Used in these records

About this file

File size
170 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - Approved by Delegation of Authority OPW24_0151 (As published).pdf · 170 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.