2012-20394 SRA Response with conditions (MCU20_0151 & OPW20_0241)

Attached to the e-mail 2012-20394 SRA application correspondence.msg.

of 8

Page text shows just the words. Original shows the document exactly as it was published.

RA6-N




SARA reference:        2012-20394 SRA
Council reference:     MCU20/0151 & OPW20/0241
Applicant reference:   04467



5 January 2021

Chief Executive Officer
Noosa Shire Council
PO Box 141
TEWANTIN QLD 4565
[email protected]

Attention:       Mark Lewis


Dear Mr Lewis


SARA response—48 Mossman Court, Noosa Heads
(Referral agency response given under section 56 of the Planning Act 2016)

The development application described below was confirmed as properly referred by the State
Assessment and Referral Agency (SARA) on 23 December 2020.


Response
Outcome:                            Referral agency response – with conditions.
Date of response:                   5 January 2021
Conditions:                         The conditions in Attachment 1 must be attached to any
                                    development approval.
Advice:                             Advice to the applicant is in Attachment 2.
Reasons:                            The reasons for the referral agency response are in Attachment 3.


Development details

Description:                        Development permit         Material change of use for a landing
                                                               (residential)
                                                               Operational work for prescribed tidal works
                                                               (pontoon)

SARA role:                         Referral agency.
SARA trigger:                      Schedule 10, Part 17, Division 3, Table 1, Item 1 (Planning Regulation

                                                                             South East Queensland (North) regional
                                                                             office
                                                                             Mike Ahern Building, Level 3, 12 First
                                                                             Avenue, Maroochydore
 Page 1 of 8                                                                 PO Box 1129, Maroochydore QLD 4558
Log in to download the original file

2012-20394 SRA Response with conditions (MCU20_0151 & OPW20_0241).pdf · 310 KB (small file)

Full text of the other 7 pages

Page 2

                                                                                                  2012-20394 SRA




                                        2017) – Tidal works or works in a coastal management district

                                        Schedule 10, Part 17, Division 3, Table 2, Item 1 (Planning Regulation
                                        2017) - Tidal works or works in a coastal management district
SARA reference:                         2012-20394 SRA
Assessment Manager:                     Noosa Shire Council
Street address:                         48 Mossman Court, Noosa Heads
Real property description:              Lot 140 on N21859
Applicant name:                         Jacqueline Price
Applicant contact details:               C/- The Jetty Specialist,
                                         18 Ron Parkinson Cres
                                         Corbould Park QLD 4551
                                         [email protected]


Representations
An applicant may make representations to a concurrence agency, at any time before the application is
decided, about changing a matter in the referral agency response (s.30 Development Assessment Rules)
Copies of the relevant provisions are in Attachment 4.

A copy of this response has been sent to the applicant for their information.

For further information please contact Kathleen Whybird, Planning Officer, on 5352 9707 or via email
[email protected] who will be pleased to assist.

Yours sincerely




Jamaica Hewston
Principal Planning Officer

cc      Jacqueline Price, [email protected]

enc     Attachment 1 - Referral agency conditions
        Attachment 2 - Advice to the applicant
        Attachment 3 - Reasons for referral agency response
        Attachment 4 - Representations provisions
        Attachment 5 - Approved plans and specifications




 State Assessment and Referral Agency                                                                Page 2 of 8

Page 3

                                                                                                       2012-20394 SRA




Attachment 1—Referral agency conditions
(Under section 56(1)(b)(i) of the Planning Act 2016 the following conditions must be attached to any development
approval relating to this application) (Copies of the plans and specifications referenced below are found at
Attachment 5)


 No.     Conditions                                                                     Condition timing
 Operational work that is assessable development under section 28 in tidal waters
 Schedule 10, Part 17, Division 3, Table 2, Item 1— Operational work that is tidal works or works in a
 coastal management district —The chief executive administering the Planning Act 2016 nominates the
 Director-General of the Department of Transport and Main Roads to be the enforcement authority for
 the development to which this development approval relates for the administration and enforcement of
 any matter relating to the following conditions:
 1.      The development must be carried out generally in accordance with               At all times
         the following plans:

                 Site Plan, Layout Plan and Water Allocation prepared by The
                  Jetty Specialist, dated 11 November 2020, drawing number
                  JSP-SJ-33990 revision D.
 2.      The structure must be lit/marked in accordance with the following              At all times
         specifications, such that it does not cause a risk to the safe
         navigation of other ships:
             (a) Section 3 of AS4284-1997 Control of the obtrusive effects of
                 outdoor lighting.
 3.      The construction, operation or maintenance of the structure, and any           At all times
         ship berthed, moored or attached to the structure, must not:
             (a) encroach into, pass over or under a navigation corridor or
             (b) be located in a high risk maritime zone.
 4.      Any debris or similar obstruction generated whilst undertaking the             While works are
         work must be removed from the waterway and suitably disposed of                occurring
         at the applicant’s expense.
 5.      All piles and/or structures to be demolished, both above and below             Prior to the completion
         the waterline must be completely extracted/removed.                            of the works
 Operational work that is tidal work or works in a coastal management district
 Schedule 10, Part 17, Division 3, Table 1, Item1 — Operational work that is assessable development
 under section 28 in tidal waters —The chief executive administering the Planning Act 2016 nominates
 the Director-General of the Department of Environment and Science to be the enforcement authority
 for the development to which this development approval relates for the administration and enforcement
 of any matter relating to the following conditions:
 6.      The pontoon must be constructed generally in accordance with the               For the duration of
         following plan:                                                                works and to be
                                                                                        maintained
         Site Plan, Layout Plan and Water Allocation prepared by The Jetty
         Specialist, dated 11 November 2020, drawing number JSP-SJ-33990
         revision D.
 7.      The works to which this approval relates are to be for a private               At all times
         purpose only.
 8.      Any operator and contractor involved in the works to which this                During construction
         approval relates must:


 State Assessment and Referral Agency                                                                     Page 3 of 8

Page 4

                                                                                                 2012-20394 SRA




             (a) be provided a copy of these referral agency conditions;
             (b) install all measures, plant and equipment necessary to
                 ensure compliance with the conditions of this approval;
             (c) maintain such measures, plant and equipment in a proper
                 and efficient condition; and
             (d) operate such measures, plant and equipment in a proper
                 and efficient manner.
9.      For the pontoon, works only use materials which are free from             During construction
        contaminants as defined under section 11 of the Environmental
        Protection Act 1994.
10.     Should the works become damaged as a result of erosion, flooding          At all times
        or storm tide inundation, the registered landowners if the subject land
        shall be responsible for the removal of all debris at their own
        expense.




State Assessment and Referral Agency                                                                Page 4 of 8

Page 5

                                                                                         2012-20394 SRA




Attachment 2—Advice to the applicant

General advice
1.      Terms and phrases used in this document are defined in the Planning Act 2016 its regulation or
        the State Development Assessment Provisions (SDAP) v2.6. If a word remains undefined it has
        its ordinary meaning.




State Assessment and Referral Agency                                                        Page 5 of 8

Page 6

                                                                                         2012-20394 SRA




Attachment 3—Reasons for referral agency response
(Given under section 56(7) of the Planning Act 2016)

The reasons for SARA’s decision are:
 The proposed development is located in a developed tidal area.
 The proposed development is for the construction of a single vessel private pontoon.
 The proposed structure, including any vessel berthed, moored or attached to the structure:
       (a) will not encroach into, pass over or under a navigation corridor; and
       (b) is not located in a high risk maritime development zone.

Material used in the assessment of the application:

      The development application material and submitted plans
      Planning Act 2016
      Planning Regulation 2017
      The State Development Assessment Provisions (version 2.6)
      The Development Assessment Rules
      SARA DA Mapping system




    State Assessment and Referral Agency                                                       Page 6 of 8

Page 7

                                                2012-20394 SRA




Attachment 4—Change representation provisions
(page left intentionally blank)




 State Assessment and Referral Agency              Page 7 of 8

Page 8

                                                 2012-20394 SRA




Attachment 5—Approved plans and specifications
(page left intentionally blank)




 State Assessment and Referral Agency               Page 8 of 8

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.