Original source · versioned page text
2012-20394 SRA Response with conditions (MCU20_0151 & OPW20_0241)
Attached to the e-mail 2012-20394 SRA application correspondence.msg.
2012-20394 SRA
Attachment 3—Reasons for referral agency response
(Given under section 56(7) of the Planning Act 2016)
The reasons for SARA’s decision are:
The proposed development is located in a developed tidal area.
The proposed development is for the construction of a single vessel private pontoon.
The proposed structure, including any vessel berthed, moored or attached to the structure:
(a) will not encroach into, pass over or under a navigation corridor; and
(b) is not located in a high risk maritime development zone.
Material used in the assessment of the application:
The development application material and submitted plans
Planning Act 2016
Planning Regulation 2017
The State Development Assessment Provisions (version 2.6)
The Development Assessment Rules
SARA DA Mapping system
State Assessment and Referral Agency Page 6 of 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original