Skip to the record
Search everything, all in one place.

Original source · versioned page text

2012-20394 SRA Response with conditions (MCU20_0151 & OPW20_0241)

Attached to the e-mail 2012-20394 SRA application correspondence.msg.

of 8

Page text shows just the words. Original shows the document exactly as it was published.

                                                                                         2012-20394 SRA




Attachment 3—Reasons for referral agency response
(Given under section 56(7) of the Planning Act 2016)

The reasons for SARA’s decision are:
 The proposed development is located in a developed tidal area.
 The proposed development is for the construction of a single vessel private pontoon.
 The proposed structure, including any vessel berthed, moored or attached to the structure:
       (a) will not encroach into, pass over or under a navigation corridor; and
       (b) is not located in a high risk maritime development zone.

Material used in the assessment of the application:

      The development application material and submitted plans
      Planning Act 2016
      Planning Regulation 2017
      The State Development Assessment Provisions (version 2.6)
      The Development Assessment Rules
      SARA DA Mapping system




    State Assessment and Referral Agency                                                       Page 6 of 8
Log in to download the original file

2012-20394 SRA Response with conditions (MCU20_0151 & OPW20_0241).pdf · 310 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.