2026 Budget Service Level Catalogues
Service Outputs – Detailed Activity Listing
Activity Service Level/Standard
Maintenance
Includes inspections and routine maintenance activities associated with beach access points, beach showers,
rock groynes, beach signage, and sand pumping station delivery pipeline inlet pump & jetty
Cyclic Inspections Beach Accesses (includes all aspects of track Quarterly
surface, structure, fencing, signs, taps/showers
etc.)
General beach inspection4 W7 (North Shore/Teewah) – 6
monthly
W8 (Noosa Heads) – Monthly
W9 (SSB to PB) – 6 monthly
Groynes & rock walls 5 W8 – 6 monthly
Sand pumping station & associated infrastructure Council contract audit / site
including inlet jetty and sand delivery line to inspections – Annual
discharge point6
Scheduled Work As identified from inspections (defects & proactive interventions) to maintain asset
serviceability.7
Sand pumping station & associated infrastructure (contractor responsibility to undertake
routine and rehabilitation maintenance work)8
Operations
Litter pick up beach & access paths, mechanical beach cleaning, sand pumping station operations
Scheduled Work9 Beach & beach access paths litter pick up within
defined area. (public spaces cleaning contract)10:
• Peregian Beach (between Beach Access #56
and #59). Daily
• Noosa Main Beach, Spit Beach and part of
area called Dog Beach.
Beach litter pick up areas outside of contract W 7 (North Shore) – annual
areas (day labour) W 8 (Noosa Heads) – 2 monthly
W9 – (SSB to Peregian) – 4
monthly
Mechanical beach cleaning (by contractor):
• Schedule A: Main Beach & Main Beach West Weekly
(for defined area refer to note 11)
• Schedule B: Sunshine Beach to Peregian Fortnightly
Beach (for defined area refer to note )12
Note: Cleaning in schedule B area is Note: Frequency may vary - subject
concentrated around patrolled swimming areas to weather conditions and tides.
and beach access points. Beach cleaning
between these areas involves only one pass of
the tractor in one direction
Main Beach sand nourishment13 Approx. 40,000 m3 p.a. as required
(contract)
Mechanical spreading of sand
(Council)
Recreational contact water testing14 Low risk sites x 5 6 samples p.a.
ocean beaches between Oct-
March
1 Refer to Asset Responsibility Matrix for specific areas of responsibility
2 Source asset management system March 2024
3 Source asset management system March 2024
4 Source Recurrent Maintenance Manual
5 Source Recurrent Maintenance Manual
6 Under contract – inspection responsibilities rest with contractor
7 Works are prioritised and subject to available budget.
8 Contracted dated 12 August 2008 with Slurry Systems Marine Pty Ltd. (15 year term commencing from date of
commissioning of system)
9 of 173
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (2026 Budget Service Level Catalogues(PDF, 8MB).pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.