Skip to the record
The gold standard in government transparency.

Original source · versioned page text

2026 Budget Service Level Catalogues

of 174

Page text read automatically using OCR, there may be inaccuracies

Service Outputs – Detailed Activity Listing
                                                         Activity
Maintenance
[Inspections and routine maintenance works to provide a safe functional surface. May include grinding off
uneven areas of pathway, surface repairs, and maintenance of pathway signage]
Note: A revised schedule of inspections and scheduled works program is being trialled and will be assessed /
adjusted as necessary. Work Orders are generated ad hoc due to system limitations.

The Recurrent Maintenance Manual provides for an inspection and routine maintenance schedule of every 4
months.

Pathways include elevated boardwalk structures that form part of a pathway, but do not bridge a waterway or
other feature.

                                                                         Hierarchy
Cyclic inspections (defects)                  Precinct                      Strategic                Local
                                              4 weekly                     3 Monthly               6 Monthly

Scheduled work                      As identified from inspections (defects & proactive interventions) to maintain
                                    asset serviceability based risk prioritisation and desired response times.
                                    Work is then scheduled based on Hierarchy and defect. Pathway renewal
                                    program aligned to Walking and Cycle Strategy
Scheduled work                      Hastings St additional works (levy)

                                    Pressure washing and resealing coloured concrete         Twice a year / levy
                                    zones (includes pedestrian crossings in the road and     covers 1 extra
                                    some footpath areas)                                     service

                                    Seal granite pavers with non-slip coating                Every 5 years
Reactive work [customer             Issue                       First response               Reactive
requests] 1                         General pathway             As per prioritisation        maintenance
                                    maintenance issues (e.g. above                           requests are
                                    uneven surface)                                          assessed and
                                                                                             prioritised for work
                                                                                             with available
                                                                                             budget
                                    Hazard (trip/fall;              As per prioritisation    Reactive
                                    obstruction)                    above                    maintenance
                                                                                             requests are
                                                                                             assessed and
                                                                                             prioritised for work
                                                                                             with available
                                                                                             budget
Operations
[Removal of debris, dead animals and graffiti as well as sweeping/cleaning of path surfaces, painting of timber
decking/boardwalk structures, and trimming of overhanging trees]
Cyclic inspections                   These items are picked up as part of the maintenance inspection program
                                     other than for contracted works as follows:
                                     Public space cleaning contracts all town precincts       Monthly – locations
                                     (includes pathway sweeping & litter pick-up)             selected ad hoc
Scheduled Work                       Manual path sweeping/cleaning/litter pick-up (Contract)2
                                     • Peregian Beach; Sunshine Beach; Sunrise                Daily
                                         Beach; Noosa Junction; Noosa Heads; Noosaville
                                         & Tewantin
                                     • Boreen Point & Cooroy                                  3 x week
                                     • Cooran & Kin Kin                                       2 x week

                                    Pressure Cleaning – Town Precincts
                                    Hasting Street                                           Twice yearly (2nd
                                                                                             service levy funded)

                                                                                             Note: LOS under
                                                                                             review due to
                                                                                                           97 of 173

Log in to download the original (2026 Budget Service Level Catalogues(PDF, 8MB).pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.