13. Where damage occurs to any council asset as a result of the development works, it
must be repaired immediately where it creates a hazard that presents risk to person
or property. Other damage must be repaired prior to completion of works.
14. All works must be completed within 12 months from the date that this permit takes
effect.
ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not
form part of the assessment manager conditions:
General Advisory Notes
1. In regard to the required “Flood Impact Assessment” Council will provide access to
the current data relating to flood modeling within the Pomona township.
2. Council reserves the right to call up any performance bond held or levy charges
against the property, should emergency works be required to be undertaken by
Council to make the site safe due to inactivity on the development site for extended
periods of time.
3. Should any changes or modifications to the approved plans be required as a result of
construction constraints, a “Request to change an existing approval” under the
Sustainable Planning Act 2009 must be made. Amended plans clearly indicating the
changes must be lodged with this application along with the appropriate fees.
Prestart Meeting Request
4. Contact Council on 5329 6244 to arrange a prestart or an inspection giving a
minimum of 5 business days notice of preferred inspection time.
Erosion and Sediment Control
5. Accepted best practice standards include:
(a) the Sunshine Coast Regional Council Manual for Erosion and Sediment
Control V1.2 or other superseding document subsequently adopted by
Council;
(b) Best Practice Erosion and Sediment Control, International Erosion Control
Association (2008)
6. As a general rule, a site is determined to have achieved effective short-term
stabilisation if at the completion of the works:
I. Methods of stabilisation are:
appropriate for slopes and slope lengths; and
are consistent with best practice environmental management practices such
as in the Manual for Erosion and Sediment Control or the IECA Manual; and
II. Stormwater runoff from the site is not currently, and is not likely to result in visible
evidence of sedimentation or erosion, or lead to water contamination.
2 GRANTING OF TENURE – NOOSA NORTH SHORE LANDING GROUND FOR
AIRCRAFT (LOT 7 MCH4562)
That Council note the report by Coordinator Property and Land Management to the
Planning and Organisation Committee Meeting dated 20 May; and
A. Grant a three year lease to Sunshine Coast Aviators Inc. with respect to the new
hangar to be constructed, and
B. Grant a three year trustee permit to the Sunshine Coast Model Flyers Inc. with
respect to the existing hangar at the site.
Page 19 of 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.