Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

2018-03-01 Special Meeting Minutes

of 3

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                       MINUTES


              Special Meeting


              Thursday, 1 March 2018

                               9.00am
         Council Chambers, 9 Pelican Street, Tewantin



Committee:   Crs Tony Wellington (Chair), Frank Wilkie, Jess Glasgow, Ingrid
             Jackson, Joe Jurisevic, Frank Pardon and Brian Stockwell



                    “Noosa Shire – different by nature”
Log in to download the original file

2018-03-01 Special Meeting Minutes(PDF, 230KB).pdf · 235 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 2 sections

Section 2

SPECIAL MEETING MINUTES                                                                          1 MARCH 2018


PURPOSE OF MEETING
The purpose of this Special Meeting was to consider:
1.   Tender Evaluation - 1718T075 – Design, Development and Construction of Park Road
     Boardwalk ; and
2.   Peregian Beach Digital Hub – Tenancy Process.



1    ATTENDANCE & APOLOGIES

     COUNCILLORS
     Councillor T Wellington, Mayor
     Councillor J Glasgow
     Councillor I Jackson
     Councillor J Jurisevic
     Councillor F Pardon
     Councillor B Stockwell
     Councillor F Wilkie

     EXECUTIVE
     B de Chastel, Chief Executive Officer
     C Billingham, Director Infrastructure Services
     K Rawlings, Director Environment and Sustainable Development
     A Rogers, Director Community Services


     The meeting commenced at 9.05am.


2.   REPORTS TO SPECIAL MEETING


     1                        PEREGIAN BEACH DIGITAL HUB TENANCY PROCESS
     DOCUMENT INFORM AT ION




                              Council Resolution
                              Moved:           Cr Pardon
                              Seconded:        Cr Jurisevic
                              That Council note the report by the Economic Development Manager to the Special
                              Council Meeting dated 1 March 2018 and
                              A.   Approve the Digital Hub tenancy process and associated assessment criteria and
                                   weightings as detailed in the report with the following addition to the Tender
                                   Assessment Criteria in all categories under “Alignment with the vision”:
                                   The second sentence is to read:
                                   “Evidence of intended contribution to building the Digital Hub community
                                   including demonstrated contribution based on past and present actions”;
                                   and
                              B.   Agree to proceed to the public tenancy process for tenancy of the Peregian
                                   Beach Digital Hub.
                                                                                                     Carried.



                                                                                                     Page 2 of 3

Section 3

SPECIAL MEETING MINUTES                                                                         1 MARCH 2018




    2                        1718T075 DESIGN DEVELOPMENT AND CONSTRUCTION OF PARK ROAD
                             BOARDWALK
    DOCUMENT INFORM AT ION




                             Council Resolution
                             Moved:           Cr Stockwell
                             Seconded:        Cr Jurisevic
                             That Council note the report by the Project Manager to the Special Council Meeting
                             dated 1 March 2018 and award tender 1718T075 for Design Development and
                             Construction of the Park Road Boardwalk to J Hutchinson Pty Ltd t/as Hutchinson
                             Builders for the lump sum price of $6,593,344.
                                                                                                       Carried.




3   MEETING CLOSURE

    The meeting closed at 10.39am




                                                                                                   Page 3 of 3

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.