RFI - Attachment 4B - Flora and Fauna Assessment Rev 5
Native Foresters
Performance Outcomes Acceptable Outcomes Response
• Works to be in accordance with a CEMP detailing
clearing works methodology to reduce impacts on
native fauna.
• Council to manage the site during landfill operations to
ensure regular inspections of protective measures are
working in accordance with design.
Bushfire management
PO12 Complies with PO12
Bushfire management measures are adopted No acceptable outcome provided.
based on ecological principles, which: The site is mapped as Medium Potential Bushfire Intensity and
a) maintain and enhance biodiversity;
Potential Impact Buffer areas, with adjacent vegetation also
b) minimise threat of fire to the natural
environment, as well as life and
being Medium to High potential bushfire intensity.
property; and
c) provide for effective use and Council will continue to manage the landfill to reduce bushfire
maintenance of buildings and potential on the landfill site, by:
structures. • Maintaining clear access ways around the edge of the
landfill and through the landfill for Fire Vehicles,
• Maintaining water supply for firefighting purposes,
• Manage green waste area to ensure flammability is
limited,
• Manage weeds in retained vegetation in accordance
with the Weed Management Plan to ensure fuel loads
are maintained in the adjacent protected areas.
The adjacent retained vegetation on Lot 77, which is not
dedicated conservation area, will continue to be managed in
accordance with Council’s bushfire management of this site.
There are bushfire access roads on site.
Scenic amenity
PO13 AO13.1 Complies with PO13
The scenic amenity and vegetated character of Vegetation is retained:
the landscape is protected by retaining a) on and within 30 metres of prominent The proposed clearing does not significantly change the
vegetation: ridgelines and on sloping sites; scenic amenity of the site.
a) along and around watercourses and b) in gullies;
drainage lines; c) along watercourses and drainage lines;
b) on steep slopes and ridgelines; d) within 10 metres of the major road network;
c) along the major road network; and and
Noosa Landfill & RRC – northern section – Fauna and Flora Assessment – REV4 39
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.