                                                                                                             REFERENCE DOCUMENT
                                                                     A: 1/9 Greg Chappell Drive,                  MCU20/0084
                                                                                                                NOOSA COUNCIL
                                                                     Burleigh Heads, QLD, 4220                 15 OCTOBER 2020
                                                                                                                      -
                                                                     protestengineering.com

328 Upper Pinbarren Creek Road, Pinbarren                     Project               PTP/03729
RPD: Lot 3 on RP851976                                        Number:               PTP/03729 – 0001 – Rev1
Area: 256,500m2                                               Project Name:         Access Review
Regulatory Authority: Noosa Shire Council
INTRODUCTION
This letter report outlines the design advice with relation to the existing access routes through site, relating to
access to the proposed ‘Mango Cabin’. This assessment is in response to comments received from Noosa Shire
Council requesting a review of site access to ensure that visitors access to the proposed Cabin is ‘safe’.

The scope of this report is to provide an assessment and recommendations for the client (where required) to
improve the existing access track to provide safer access to future Cabins proposed for the site.




                        Figure 1 – Contextual Site Location (site location bordered blue)

SITE SETTING
The site is located on a on a hillside. The area is well vegetated, with the site containing a number of existing
ponds and water features (some of which overflow over the existing access road in flood events). As per Figure
1 above, it is evident that the much of the site forms part of naturally valley. Figure 2 below, shows a site profile
traced along the access road to the location of the proposed new cabin.




                                Gold Coast | Sunshine Coast | Melbourne | Emerald
PTP/02903                                                                                               8 April 2019
Log in to download the original file

Reference Document - Access Review.pdf · 2.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 5 pages

Page 2

                                                                                                       Page 2 of 5




                                                      B
                                                      V




                                    A
                                    V

                                                                                                                B
                                                                                                                V
   A

      Figure 2 - Elevation Profile through site (based on 1m LIDAR data). A marks site access from Upper
    Pinbarren Road; B marks proposed cabin; Star marks bridge over creek; ‘Red Line’ marks steep access
                                                     location

Figure 2 above shows the access from Upper Pinbarren Road, typically graduates up as you progress into the
site, with one particular section where grades are approximately 40% (1 : 25) (highlighted in Figure 2 above). In
addition there is one creek crossings, via a level crossing north of the caretakers house where a spillway overtops
from the pond. Note, access to the site will be via the existing easement (highlighted green on Figure 1).

Access Road Assessment
The existing condition of the access road has been assessed in general accordance with Noosa Shire Councils
Development Guidelines, Institute of Public Works Engineering Australasia (IPWEA) and QUDM. The purpose of
this assessment is to provide recommendations to improve access for the purposes of site visitors (who may not
be familiar with the sites hazards or non 4WD vehicles). This assessment provides a number of
recommendations to improve site access and general traffic safety for purposes of supporting the proposed
Cabin on the site. The key items to be address are as follows:

    1. Poor Signage of general site hazards and conditions (i.e. speed, spillway, flood flow depths at
       creek crossings etc.)
    2. Narrow roads with no designate passing bays
    3. General rutting and poor drainage
    4. Grade

Table 1 below summarises these features and some recommended remediation strategies. The evidence and
recommendation in Table 1 have been informed by 2no site visits by a Civil Engineer RPEQ on the 16.08.2019
and 17.09.2019, review of Queensland Globe and consideration of Noosa Shire Councils Development
Guidelines.


PTP/03104 – Lot 195, 1164 Cooroy Belli Ck Road, Ridgewood                                            28 June 2019

Page 3

                                                              ABN: 26 602 913 673
                                                              E: [email protected]
                                                              P: (07) 5568 0180
                                                              A: 1/9 Greg Chappell Drive,
                                                              Burleigh Heads, QLD, 4220
                                                              protestengineering.com


FEATURE     CHAINAGE         DESCRIPTION                        REMEDIATION/WORKS                                                  IMAGE
Access      General    Rutting of the road and        Regrade access road, provide 2.5% crossfall
Drive                  evidence of poor drainage      to improve drainage. Formalise table drains
                                                                                                                                           Heavy rutting noted in places.
                                                      where required. Resurfacing and grading
                                                                                                                                           Where evident regrade and
                                                      required in places with 100mm crushed                                                cover with 100mm compacted
                                                      stone.                                                                               road base.
                                                      (Note: It is understood that the client
                                                      undertakes regularly maintenance of the
                                                      access roads as and when required)




Spillway    +460m      Evidence that there is         Provide a concrete lined spillway channel to
Crossing               erosion      when     pond     prevent erosion and provide better access.         Form concrete lined ‘v’
                       overtops and crosses the       Spillway apron should be approx. 5m wide           spillway.
                       access road.         Flows     150mm thick N32 concrete with SL82 steel
                       evident to cause soft          mesh reinforcement with 50mm cover.
                       ground and may cause           Concrete base to have slip membrane and
                       difficulty for smaller cars    min 300mm thick layer of compacted Type
                       to pass. No flow depth         2/3 gravel laid on geotextile.
                       indicator to warn drivers      Spillway to be formed to ‘V’ channel profile
                       of flows over road.            to min 3.3% section falls and min 2.5% cross
                                                      fall to downstream side to direct channel
                                                      flow. Provide rock armouring upstream and
                                                      downstream of min D50150mm rock 1m
                                                      either side of spillway.
                                                      Provide Flow Depth indicator and Spillway
                                                      Warning sign



                                                     Gold Coast | Sunshine Coast | Melbourne | Emerald
PTP/02903                                                                                                                                          8 April 2019

Page 4

                                                                                                            Page 4 of 5




Access       +490m        Access road does not       Provide signage for site users that access
Drive                     permit passing.            upto Mango Cabin is single lane access
(Junction)




Access       +570m        Access to Mango Cabin is   Regrade steep section to 1:4 (25%). Regrade
Drive                     steep (circa 40%). Poor    access road with 2.5% crossfall falling
                          drainage and evidence of   towards the west (left hand side). Formalise
                          both erosion and rutting   table drain on right hand side to intercept
                                                     overland flows from upper fields.                       Access to proposed cabin




PTP/03104 – Lot 195, 1164 Cooroy Belli Ck Road, Ridgewood                                    28 June 2019

Page 5

                                                                    ABN: 26 602 913 673
                                                                    E: [email protected]
                                                                    P: (07) 5568 0180
                                                                    A: 1/9 Greg Chappell Drive,
                                                                    Burleigh Heads, QLD, 4220
                                                                    protestengineering.com


CONCLUSION
All works detailed above should comply with following general guidelines for both construction and
maintenance:

    •    IPWEA Drawings RS056
    •    General Information on the Construction and Maintenance of Vehicle Crossovers on Council Controlled
         Land
    •    Queensland Urban Drainage Manual (QUDM) for the design and construction or rural table drains and
         culverts

It is considered that the should the property owner implement the above strategies, continue to maintain clear
site lines, and general road conditions (in accordance Australian and local council guidelines), the vehicular site
safety can be improved for visitors and users of the site.

We trust this information is satisfactory for your current needs. Should you have any questions, please feel free
to contact the undersigned

Protest Engineering




Ryan Hofman
Senior Civil Engineer
BEng (Hons) CPEng CWEM RPEQ 21643




                               Gold Coast | Sunshine Coast | Melbourne | Emerald
PTP/02903                                                                                             8 April 2019

Page 6

                                                             Page 6 of 5




PTP/03104 – Lot 195, 1164 Cooroy Belli Ck Road, Ridgewood   28 June 2019


[OCR of page images]
Page 6 of 5

PROTEST

ENGINEERING
Synergy // Efficiency // Productivity

 

 

PTP/03104 — Lot 195, 1164 Cooroy Belli Ck Road, Ridgewood 28 June 2019

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.