Original source · versioned page text
Reference Document - Access Review
ABN: 26 602 913 673
E: [email protected]
P: (07) 5568 0180
A: 1/9 Greg Chappell Drive,
Burleigh Heads, QLD, 4220
protestengineering.com
FEATURE CHAINAGE DESCRIPTION REMEDIATION/WORKS IMAGE
Access General Rutting of the road and Regrade access road, provide 2.5% crossfall
Drive evidence of poor drainage to improve drainage. Formalise table drains
Heavy rutting noted in places.
where required. Resurfacing and grading
Where evident regrade and
required in places with 100mm crushed cover with 100mm compacted
stone. road base.
(Note: It is understood that the client
undertakes regularly maintenance of the
access roads as and when required)
Spillway +460m Evidence that there is Provide a concrete lined spillway channel to
Crossing erosion when pond prevent erosion and provide better access. Form concrete lined ‘v’
overtops and crosses the Spillway apron should be approx. 5m wide spillway.
access road. Flows 150mm thick N32 concrete with SL82 steel
evident to cause soft mesh reinforcement with 50mm cover.
ground and may cause Concrete base to have slip membrane and
difficulty for smaller cars min 300mm thick layer of compacted Type
to pass. No flow depth 2/3 gravel laid on geotextile.
indicator to warn drivers Spillway to be formed to ‘V’ channel profile
of flows over road. to min 3.3% section falls and min 2.5% cross
fall to downstream side to direct channel
flow. Provide rock armouring upstream and
downstream of min D50150mm rock 1m
either side of spillway.
Provide Flow Depth indicator and Spillway
Warning sign
Gold Coast | Sunshine Coast | Melbourne | Emerald
PTP/02903 8 April 2019
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.