Skip to the record
Noosa’s premier civic archive.

Council archive · source document

MCU17/0005 - IDAS Application - 113 Marara St Cooroy

of 40

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (13.0 MB): the original may take a few minutes to open or download. The page text below is quick to read.

 IDAS form 1-Application                                     details                     C '"
                                                                                           •••••••••••   I


 (Sustainable   Planning Act 2009 version 4.3 effective 5 December 2016)


 This form must be used for ALL development applications.                                                         1 0 JAN 2017
                                                                                                             ...•...           ..
 You MUST complete ALL questions that are stated to be a mandatory requirement unless otherwise identified on this
 form.                                                                            L_____                   1               _
 For all development applications, you must:
 •    complete this form (IDAS form 1-Application   details)
 •    complete any other forms relevant to your application
 •    provide any mandatory supporting information identified on the forms as being required to accompany your
      application.
 Attach extra pages if there is insufficient space on this form.

 All terms used on this form have the meaning given in the Sustainable Planning Act 2009 (SPA) or the Sustainable
 Planning Regulation 2009.

 This form and any other IDAS form relevant to your application must be used for development applications relating to
 strategic port land and Brisbane core port land under the Transport Infrastructure Act 1994 and airport land under the
 Airport Assets (Restructuring and Disposal) Act 2008. Whenever a planning scheme is mentioned, take it to mean land
 use plan for the strategic port land, Brisbane core port land or airport land.

I PLEASE NOTE: Thi~orm             is not required to accompany requests for compliance assessment.                                                J
I Mandatory requirements                                                                                                                             I
 Applicant details (Note: the applicant is the person responsible for making the application and need not be the owner
 of the land. The applicant is responsible for ensuring the information provided on alilDAS application forms is correct.
 Any development permit or preliminary approval that may be issued as a consequence of this application will be issued
 to the applicant.)

 Namels (individual or company name in full)                   LJkBii CE~\f2,I4L. CWRC\-\ L.\01 IJbD
 For companies. contact name                                   I      e~AM«\ !JaN('
 Postal address                                                                                  \
                                                                                         O~O

                                                                   Suburb

                                                                   State                                                   Postcode

                                                                   Country


                                                               _oy.;t.\ 5lJ obLf                                                             _
                                                                           0+0\\ 5\1. obCf                                                       _




                                                                     \ Box:   ~   ..\.          R: ~.i                 \   e
                                                                                                                           ••         Queensland
                                                                                                                                      Government
Full text of the other 39 pages

Page 2

                                                                    Department of Infrastructure, Local Government and Planning


Email address (non-mandatory      requirement)



Applicant's reference number (non-mandatory
requirement)

1.       What is the nature of the development     proposed    and what type of approval     is being sought?

Table A-Aspect      1 of the application (If there are additional aspects to the application please list in Table B-Aspect   2.)

a)   What is the nature of the development?      (Please only tick one box.)

     lEIMaterial change of use        0 Reconfiguring a lot           0 Building work              0 Operational work
b)   What is the approval type? (Please only tick one box.)

     o     Preliminary approval       o    Preliminary approval
                                            under s241 and s242
                                                                      ~    Development permit
            under s241 of SPA
                                            of SPA
c)   Provide a brief description of the proposal, including use definition and number of buildings or structures where
     applicable (e.g. six unit apartment building defined as a multi-unit dwelling, 30 lot residential subdivision etc.)

         8-(A(bL.I>~ ~            VA I N\' Q,Al-1... nf.\...o::' "1Oe.. W 5..• omE,e.0~

d)   What is the ievei of assessment? (Please oniy tick one box.)

     ~     Impact assessment          0 Code assessment

Table B-Aspect    2 of the application (If there are additional aspects to the application please list in Table C-
Additional aspects of the application.)
a)   What is the nature of development?      (Please only tick one box.)

     ~     Material change of use     0 Reconfiguring a lot           0 Building work              0 Operational work
b)   What is the approval type? (Please only tick one box.)

     o     Preliminary approval       o    Preliminary approval
                                            under s241 and s242
                                                                      r;a Development
                                                                            permit
            under s241 of SPA
                                           of SPA
c)   Provide a brief description of the proposal, including use definition and number of buildings or structures where
     applicable (e.g. six unit apartment building defined as a multi-unit dwelling, 30 lot residential subdivision etc.)




d)   What is the level of assessment?

     ~     Impact assessment          0 Code assessment

Table C-Additional   aspects of the application (If there are additional aspects to the application please list in a
separate table on an extra page and attach to this form.)

     o     Refer attached schedule    0 Not required

                                                                                                 IDAS form 1-Application details
                                                                                                   Version 4.3-5 December 2016

Page 3

                                                                                 Department of Infrastructure, Local Government and Planning


2.           Location   of the premises      (Complete Table D and/or Table E as applicable.           Identify each lot in a separate row.)

Table D-Street address and lot on plan for the premises or street address and lot on plan for the land adjoining or
adjacent to the premises (Note: this table is to be used for applications involving taking or interfering with water.)
(Attach a separate schedule if there is insufficient space in this table.)

       129      Street address and lot on plan (All lots must be listed.)

       0        Street address and lot on plan for the land adjoining or adjacent to the premises (Appropriate for
                development in water but adjoining or adjacent to land, e.g. jetty, pontoon. All lots must be listed.)

Street address                                                                    Lot on plan description         Local government         area
                                                                                                                  (e.g. Logan, Caims)
Lot           Unit      Street   Street name and official suburb/        Post-    Lot no.     Plan type
              no.       no.      locality name                           code                 and plan no.

i)                      \,~        r<'t A i1-.Ae..CI 41 !r       ~
                                                                        14-563      2-        ~2'Z.5'113 rr£~A.-J,t-J
                                                                    V
ii)

iii)
Planning scheme details (If the premises involves multiple zones, clearly identify the relevant zone/s for each lot in a
separate row in the below table. Non-mandatory)
Lot           Applicable zone / precinct                Applicable local plan / precinct              Applicable overlay/s

i)

ii)

iii)

Table E-Premises      coordinates (Appropriate for development in remote areas, over part of a lot or in water not
adjoining or adjacent to land e.g. channel dredging in Moreton Bay.) (Attach a separate schedule if there is insufficient
space in this table.)

Coordinates                                                                       Zone           Datum              Local government
(Note: place each set of coordinates in a separate row)                           reference                         area (if applicable)

Easting              Northing              Latitude         Longitude

                                                                                                  0 GDA94
                                                                                                  0 WGS84
                                                                                                  0 other
3. Total area of land on which the development                 is proposed       (indicate square metres)




4. Current use/s of the premises               (e.g. vacant land, house, apartment building, cane farm etc.)



                                                        \




                                                                                                              IDAS form 1-Application details
                                                                                                                Version 4.3-5 December 2016

Page 4

                                                                              Department of InFrastructure, Local Government and Planning


5.       Are there any current approvals            (e.g. a preliminary     approval)       associated   with this application?   (Non-
         mandatory requirement)

o       No          o Yes-provide details below
List of approval reference/s                               Date approved (dd/mm/yy)                      Date approval lapses (dd/mm/yy)



6.       Is owner's    consent   required     for this application?       (Refer to notes at the end of this form Formore information.)


o       No

iii Yes-complete          either Table F, Table G or Table H as applicable


Table F

Name of ownerls of the land

I/We, the above-mentioned        ownerls of the land, consent to the rna

Signature of ownerls of the land
                                                                                        •
Date

Table G

Name of ownerls of the land                   I
o      The owner's written consent is attached or will be provided separately to the assessment manager.

Table H

Name of ownerls of the land                   I
o      By making this application, I, the applican~ declare that the owner has given written consent to the making of the application.


7.       Identify   if any of the following       apply to the premises      (Tick applicable box/es.)


f2a     Adjacent to a water body, watercourse or aquifer (e.g. creek, river, lake, canal)-complete                    Table I

o On strategic port land under the Transport Infrastructure Act 1994-complete Table J
o In a tidal water area-complete Table K
o       On Brisbane core port land under the Transport Infrastructure Act 1994 (No table requires completion.)

o On airport land under the Airport Assets (Restructuring and Disposal) Act 2008 (no table requires completion)
o the
  Listed on either the Contaminated Land Register (CLR) or the Environmental Management Register (EMR) under
       Environmental Protection Act 1994 (no table requires completion)

Table I

Name of water body, watercourse or aquifer




                                                                                                                IDAS form 1-Application details
                                                                                                                  Version 4.3-5 December 2016

Page 5

                                                                    Department of Infrastructure, local Government and Planning

Table J

Lot on plan description for strategic port land                       Port authority for the lot




Table K

Name of local government for the tidal area (if applicable)           Port authority for the tidal area (if applicable)




8.     Are there any existing   easements     on the premises?    (e.g. for vehicular access, electricity, overland flow,
       water etc)

@      No      0   Yes-ensure    the type, location and dimension of each easement is included in the plans submitted


9.     Does the proposal    include    new building   work or operational   work on the premises?        (Including any
       services)

6a No 0            Yes-ensure    the nature, location and dimension of proposed works are included in plans submitted


10.    Is the payment of a portable long service       leave levy applicable     to this application?   (Refer to notes at the
       end of this form for more information.)

rs;r   No-go   to question 11         DYes

10a.   Has the portable    long service   leave levy been paid? (Refer to notes at the end of this form for more
       information.)

o No
o      Yes-eomplete  Table L and submit, with this application, the local government/private        certifier's copy of the
       accepted QLeave form

Table L

Amount paid                                                        Date paid          QLeave project number (6 digit number
                                                                   (dd/mm/yy)         starting with A, S, E, L, P or S)




11.    Has the local government agreed to apply a superseded            planning    scheme to this application      under
       section 96 of the Sustainable Planning Act 2009?


IZ' No
o Yes-please        provide details below


Name of local government                          Date of written notice given      Reference number of written notice given
                                                  by local government               by local government (if applicable)
                                                  (ddlmmlyy)




                                                                                                    IDAS form 1-Application details
                                                                                                      Version 4.3-5 December 2016

Page 6

                                                                         Department of Infrastructure. Local Government and Planning


    12.     List below all of the forms and supporting infonmation that accompany this application (Include alllDAS
            forms, checklists, mandatory supporting information etc. that will be submitted as part of this application)

    Description    of attachment     or title of attachment                                       Method of lodgement to
                                                                                                  assessment manager



          10/15    :toQ, lV\ .C:;                                                                   Hf\~        D E.L.1.,j~'-O
      ALP Il.Pr           f\(o~T\G  (Z.E::'bt. r                                                          I'           "
       t5c.N&H\~~              CoAs, PPn ,J-rBAL.l..              R~\                                      I'              "

113.        Applicant's    declaration

    ~ By making this application, I declare that all information in this application is true and correct (Note: it is unlawful to
    provide false or misleading information)

Notes for completing         this form

•     Section 261 of the Sustainable Planning Act 2009 prescribes when an application is a properly-made application.
      Note, the assessment manager has discretion to accept an application as properly made despite any non-
      compliance with the requirement to provide mandatory supporting information under section 260(1 }(c) of the
      Sustainable Planning Act 2009

Applicant details
• Where the applicant is not a natural person, ensure the applicant entity is a real legal entity.

Question 1
 •  Schedule 3 of the Sustainable Planning Regulation 2009 identifies assessable development and the type of
    assessment. Where schedule 3 identifies assessable development as "various aspects of development" the
    applicant must identify each aspect of the development on Tables A, Band C respectively and as required.

Question 6
• Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is required for
  an application. Section 260(1 }(e) of the Sustainable Planning Act 2009 provides that if the owner's consent is
  required under section 263, then an application must contain, or be accompanied by, the written consent of the
  owner, or include a declaration by the applicant that the owner has given written consent to the making of the
  application. If a development application relates to a state resource, the application is not required to be supported
  by evidence of an allocation or entitiement to a state resource. However, where the state is the owner of the
  subject land, the written consent of the state, as landowner, may be required. Allocation or entitlement to the state
  resource is a separate process and will need to be obtained before development commences.

Question 7
 •  If the premises is listed on either the Contaminated Land Register (CLR) or the Environmental
    Management Register (EMR) under the Environmental Protection Act 1994 it may be necessary to
    seek compliance assessment. Schedule 18 of the Sustainable Planning Regulation 2009 identifies
    where compliance assessment is required.

Question 10
• The Building and Construction Industry (Portable Long Service Leave) Act 1991 prescribes when the portable long
  service leave levy is payable.
• The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy
  are prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2013.




                                                                                                       IDAS form 1-Application details
                                                                                                        Version 4.3-5 December 2016

Page 7

                                                                        Department of Infrastructure, Local Government and Planning


Question 103
• The portable long service leave levy need not be paid when the application is made, but the Building and
   Construction Indusfry (Portable Long Service Leave) Acf 1991 requires the levy to be paid before a development
   pernnit is issued.
• Building and construction industry notification and payment forms can be completed on the QLeave website at
  www.qleave.qld.gov.au.   For further information contact QLeave on 1800803481.


Privacy-The    information collected in this form will be used by the Department of Infrastructure, Local Government
and Planning (DILGP), assessment manager, referral agency andlor building certifier in accordance with the
processing and assessment of your application. Your personal details should not be disclosed for a purpose outside of
the IDAS process or the provisions about public access to planning and development information in the Sustainable
Planning Act 2009, except where required by legislation (including the Right to Information Act 2009) or as required by
Parliament. This information may be stored in relevant databases. The information collected will be retained as
required by the Public Records Act 2002.



OFFICE USE ONLY

 Date received     ____________                           1   Reference numbers

NOTIFICATION     OF ENGAGEMENT                OF A PRIVATE CERTIFIER

 To                                                         Council. I have been engaged as the private certifier for the

        ----------------                                  I
                                                          . building work referred to in this application

                                                                           BSA Certification license          Building
 Date of engagement               Name
                                                                           number                             classificationls




QLEAVE NOTIFICATION               AND PAYMENT (For completion       by assessment     manager   or private certifier   if
applicable.)
                                                                                            Date receipted
                                                                                                                 Name of officer
                                         QLeave project   Amount paid                       form sighted by
 Description of the work                                                       Date paid                         who sighted the
                                         number           ($)                               assessment
                                                                                                                 form
                                                                                            manaaer




The Sustainable Planning Act 2009 is administered by the Department of Infrastructure, Local Government and
Planning. This form and all other required application materials should be sent to your assessment manager and any
referral agency.




                                                                                                     IDAS form 1-Application details
                                                                                                      Version 4.3-5 December 2016

Page 8

                                                                                        Department of Infrastructure, Local Government and Planning




         I DAS form 5-Material                                                    I   haFfge ~of,use -ass~ ble
         against a planning scheme                                                                 1 0 JAN 2017
         (Sustainable   Planning Act 2009 version 3.1 effective 3 August 2015)


         This form must be used for development applications for a ,material chang               1 of ~se assessable against a planning
         scheme.                                                   '--------                                    ----_d
         You MUST complete ALL questions that are stated to be a mandatory requirement unless otherwise identified on this
         form.

         For all development applications, you must:
         •      complete IDAS form 1-Applicalion              details
         •      complete any other forms relevant to your application
         •      provide any mandatory supporting information identified on the forms as being required to accompany your
                application.
         Attach extra pages if there is insufficient space on this form.

         Alltenms used on this form have the meaning given in the Sustainable Planning Act 2009 (SPA) or the Sustainable
         Planning Regulation 2009.

         This form must also be used for material change of use on strategic port land and Brisbane core port land under the
         Transport Infrastructure Act 1994 and airport land under the Airport Assets (Restructuring and Disposal) Act 2008 that
         requires assessment against the land use plan for that land. Whenever a planning scheme is mentioned, take it to
         mean land use plan for the strategic port land, Brisbane core port land or airport land.

       I Mandatory requirements
         1.      Describe the proposed use. (Note: this is to provide additional detail to the infonmation provided in question 1
                 of IDAS form 1-Applicalion details. Attach a separate schedule if there is insufficient space in this table.)

         General explanation of the                     Planning scheme                 No. of dwelling units    Days and          No. of
         proposed use                                   definition (include each        (if applicable) or       hours of          employees
                                                        definition in a new row)        gross floor area (if     operation         (if applicable)
                                                        (non-mandatory)                 applicable)              (if applicable)




         2.       Are there any current approvals             associated     with the proposed   material   change of use?
                  (e.g. a preliminary approval.)

         ~       No         D        Yes-provide      details below


         List of approval reference/s                                   Date approved (dd/mm/yy)             Date approval lapses (dd/mm/yy)




___________________________________________                                                                                                8'
                                                                                                                                            Queensland
                                                                                                                                            ~mment

Page 9

                                                                              Department of Infrastructure, Local Government and Planning



 3.     Does the proposed      use involve     the following?   (Tick all applicable boxes.)

 The reuse of exisling buildings on the premises                   ~       No          D         Yes

 New building work on the premises                                 ~       No          D         Yes

 The reuse of exisling operalional work on the premises            D       No          0         Yes

 New operalional work on lhe premises                              D       No          5a'       Yes

I Mandatory supporting      information

 4.     Confirm that the following        mandatory   supporting       Information   accompanies       this application

 Mandatory    supporting    information                                                      Confirmation       of    Method of
                                                                                             lodgement                lodgement

 All applications
 A site plan drawn 10 an appropriate scale (1:100,1:200         or 1:500 are                 ~     Confirmed
 recommended scales) which shows lhe following:
 •    lhe localion and site area of the land to which the applicalion relales
      (relevant land)
 •    lhe north point
 •    lhe boundaries of lhe relevanlland
 •    any road frontages of lhe relevanlland, including lhe name of lhe road
 •    lhe location and use of any existing or proposed buildings or slructures
      on the relevanlland (nole: where exlensive demolition or new buildings
      are proposed, two separate plans [an existing sile plan and proposed site
      plan) may be appropriate)
 •    any existing or proposed easements on lhe relevanlland and lheir
      funclion
 •    lhe localion and use of buildings on land adjoining lhe relevanlland
 •    all vehicle access poinls and any exisling or proposed car parking areas
      on the relevanlland. Car parking spaces for persons wilh disabililies and
      any service vehicle access and parking should be clearly marked
 •    for any new building on the relevanlland, lhe localion of refuse slorage
 •    the location of any proposed relaining walls on lhe relevanlland and their
       heighl
 •    lhe localion of any proposed landscaping on lhe relevanlland
 •    lhe localion of any stormwaler detenlion on the relevanlland .

 A slatemenl aboul how the proposed development addresses lhe local                          [2f Confirmed
 government's planning scheme and any olher planning inslrumenls or
 documenls relevant 10 lhe applicalion.
 A statemenl aboullhe intensity and scale of the proposed use (e.g. number                   0" Confirmed
 of visilors, number of seats, capacity of slorage area etc.).

 Information lhat slates:                                                                    [l<]Confirmed
 •    lhe existing or proposed fioor area, site cover, maximum number of                     D Nol applicable
      sloreys and maximum heighl above nalural ground level for existing or
      new buildings (e.g. information regarding existing buildings bul nol being
      reused)
 •    lhe exisling or proposed number of on-sile car parking bays, type of
      vehicle cross-over (for non-residenlial uses) and vehicular servicing
      arranaement (for non-residential uses).



                                                                                         IDAS form 5-Material      change of use assessable
                                                                                                                  against a planning scheme
                                                                                                                 Version 3.1-3 August 2015

Page 10

                                                                           Department of Infrastructure, Local Government and Planning




A statement addressing the relevant part(s) of the State Development
Assessment Provisions (SDAP).
                                                                                           o    Confirmed
                                                                                            ~   Not applicable

When the application     involves   the reuse of existing     buildings

Plans showing the size, location, existing floor area, existing site cover,                o    Confirmed
existing maximum number of storeys and existing maximum height above                       Iil Not applicable
natural ground level of the buildings to be reused.

When the application     involves   new building   work (including        extensions)

Floor plans drawn to an appropriate scale (1:50,1:100        or 1:200 are                  ill Confirmed
recommended scales) which show the following:
•   the north point
•   the intended use of each area on the floor plan (for commercial, industrial
    or mixed use developments only)
•   the room layout (for residential development only) with all rooms clearly
    labelled
•   the existing and the proposed built form (for extensions only)
•   the gross floor area of each proposed floor area .

Elevations drawn to an appropriate scale (1:100,1:200 or 1:500 are                         ~    Confirmed
recommended scales) which show plans of all building elevations and
facades, clearly labelled to identify orientation (e.g. north elevation)

Plans showing the size, location, proposed site cover, proposed maximum
number of storeys, and proposed maximum height above natural ground level
                                                                                           o    Confirmed
                                                                                           ~    Not applicable
of the proposed new building work.

 When the application    involves   reuse of other existing     work

 Plans showing the nature, location, number of on-site car parking bays,                    o   Confirmed
 existing area of landscaping, existing type of vehicular cross-ever (non-
 residential uses), and existing type of vehicular servicing arrangement (non-
                                                                                            o   Not applicable

 residential uses) of the work to be reused.
 When the application    involves   new operational   work

 Plans showing the nature, location, number of new on-site car parking bays,                ~Confirmed
 proposed area of new landscaping, proposed type of new vehicle cross-over
 (non-residential uses), proposed maximum new vehicular servicing
                                                                                            o   Not applicable

 arrangement (non-residential uses) of the proposed new operational work.



Privacy-Please     refer to your assessment manager, referral agency andlor building certifier for further details on the
use of information recorded in this form.



OFFICE USE ONLY

 Date received      ___________
                           ~I                               Reference numbers

The Sustainable Planning Act 2009 is administered by the Department of Infrastructure, Local Government and
Planning. This form and all other required application materials should be sent to your assessment manager and any
referral agency.




                                                                                        IDAS form 5-Material     change of use assessable
                                                                                                                against a planning scheme
                                                                                                               Version 3.1-3 August 2015

Page 11

-,




              o i1.•.•1 j-'"       I   :~)l!t ter
                                                                          Graham Young
                                                                        Pastor / Manager
                                                                    Hope Central Church
                         1 0 JAN 2017
                                                    113 Marara Street, Cooroy, QLD, 4563
                                                                   ABN: 17 271 374838
                       Tc      ~       'n



     Sunshine Coast Paintball
            Development                             Application




Prepared:   15th of November 2016

Page 12

                                      Sunshine Coast Paintbal1 Development        Application   2017




Contents
Development Application Summary                                                                                 3
       The Business                                                                                             3
       The Proposal                                                                                             3
       The Market                                                                                               3
       The Future                                                                                               3

The Busi ness                                                                                                   4
       Business details                                                                                        .4
       Registration details                                                                                    .4
       Business premises                                                                                       .4
       Organisation chart                                                                                      .4
       Management & ownership                                                                                   5
       Key personnel                                                                                            5
       Product                 _                                                                                5
       Risk management                                                                                          6
       Insurance Provided at Commencement                                                                       7
       Operations                                                                                               7
       Sustainability plan                                                                                      7

The Proposa I                                                                                                   8
       Sunshine Coast Paintbal1                                                                                 8
       Facilities                                                                                               8
       Considerations                                                                                           8
       Approvals Required                                                                                       9

The Future                                                                                                     10
       Vision statement                                                                                        10

Su pporti n9 docu mentati 0 n...............................................................................   11




                                                                                                                    Page 2

Page 13

"                               Sunshine Coast Paintbali Deveiopment   Application   2017




    Development Application Summary
    The Business
    Business name: Sunshine Coast Paintball

    Business structure:    Hope Central Church

    ABN: 17271 374 838

    Business location:    113 Marara Street, Cooroy, QLD, 4563

    Relevant owner experience: Pastor Graham has over thirty years experience in establishing
    churches across Australia. He developed a sports centre attached to a church in Camden, NSW
    which saw over 3000 people utilising the facilitiy each week. After this he developed a paintball
    site in Camden that has been operational for the last eight years without an incident on it's 50
    acre site. In addition, he is a trade qualified painter and carpenter operating a father-son
    business around the Sunshine Coast region.

    Products/services:    Recreational paintball site which will operate with a maximum of 20 persons
    across 3 open fields. Hire will include protective equipment, markers and paintballs.

    The Proposal
    Sunshine Coast Paintball:

    The proposed development is to operate a small 3 field paintball site at the rear of Hope Central
    Church on approximately 3 acres. A maximum of 20 players will be allowed per 2 hour session
    which would limit the amount of traffic and noise as recommended in a noise assessment. Cooroy
    has few recreational activities offered in the area and the development of the paintball site would
    offer a unique day and night time event which allows customers to avoid the heat in Summer at
    night. To allow for maintenance, repairs or damages - Sunshine Coast Paintball is applying for 30
    paintball guns to be held securely on site.

    The Market
    Target market:

    Anyone that is aged above 15 years will be eligible to participate as per the legislative
    requirements. Groups will be a primary portion of the target market including bucks, hens and
    birthday parties, father and son events, as well as corporate team building events.

    The Future
    Vision statement:

    Sunshine Coast Paintball will strive to excel in recreational services. The mission is to provide
    playing locations and equipment rental services to paintball players in the area who are currently
    involved in the sport or who wish to play casually. We pride ourselves on excellent customer
    service while building significant relationships with our customers. We will strive to be recognised
    as a leader in: quality, service standards, safety, affordability; and be actively involved in the
    local Cooroy community.




                                                                                                   Page 3

Page 14

"                               Sunshine Coast Paintball Development Application 2017




    The Business
    Business details
    Products/services: Paintball experience on a three field site including the hire of protective
    equipment, markers with paintballs included,

    Registration details
    Business name: Sunshine Coast Paintball

    Trading name(s): Sunshine Coast Paintball

    Date registered: 2016

    Location(s) registered: Queensland

    Business structure: Hope Central Church

    ABN: 17271 374838

    GST: Registered

    Domain names: www.sunshinecoastpaintball.com.au

    Licences & permits: Firearms License A to be obtained

    Business premises
    Business location: 113 Marara Street, Cooroy, QLD, 4563

    Organisation        chart
    Figure 1: Organisation Chart




                         [ assistant 1          [ referees 1            [ administrator   1




                                                                                                     Page 4

Page 15

"
                                      Sunshine Coast Paintball Development Application 2017




    Management                & ownership
    Details of management & ownership: Sunshine Coast Paintball will be operated by Pastor
    Graham Young of Hope Central Church with a small team of staff under a leadership model (see
    Figure 1.).

    Experience: Graham has over thirty years experience in establishing churches across Australia.
    He developed a sports centre attached to a church in Camden, NSW which saw over 3000 people
    utilising the facilitiy each week. After this he developed a paintball site in Camden that has been
    operational for the last eight years without an incident on it's 50 acre site. In addition, he is a
    trade qualified painter and carpenter operating a father-son business around the Sunshine Coast
    region.

    Key personnel
    Current     staff

    Job Title                     Name                Skills or strengths

    Pastor / Manager              Graham Young        Experience owning and operating industry specific
                                                      businesses over the last eight years, as well as non
                                                      related business over the last 30 years.



    Assistant Manager             Joshua Kubler       Knowledge of employment law and 5+ years industry
                                                      specific experience working in theme parks, children
                                                      centres and customer service roles.

    Required staff

    Job Title              Quantity        Skills necessary

    Retail Assistant       [1]             Customer service experience

    Referees               [3]             Firearms License, experience refereeing paintball matches, fully
                                           trained and current first aid certificate

    Administrator          [1]             Relevant qualifications in business administration and 2 years
                                           recent experience

    Recruitment         options

    Recruitment will be conducted through online social media, word of mouth referrals and through
    internet listings. Existing staff who demonstrate attributes suitable for another role will have the
    opportunity to be trained for succession,

    Product
    Product/Service                  Description                                              Price

    Product                         2 hour session with all hire equipment (marker,           $99.00 AUD
                                    goggles, overalls, and 1000 paintballs) and half
                                    a pizza




                                                                                                             Page 5

Page 16

                             Sunshine Coast Paintball Development Application 2017




Market position: Sunshine Coast Paintball products are at a competitive position in the market,
offering the most affordable experience with the highest level of service from our staff.

Unique selling position: Unlike other competitors throughout Queensland, our paintball site will
be operational for quick speedball games rotating between three unique fields. In addition to this
the site will operate at night to avoid the heat for both recreational and sporting teams.

Anticipated demand: The Sunshine Coast offers only one paintball site to service the region's
population which exceeds 280,000 according to the Council statistics. While the product would be
considered a luxury item and may be utilised every 6 to 12 months by most customers, there is
the potential for regular users as a recreational sport.

Risk management


Hazard       Effect            Risk                    Strategy

Paintballs   Severe injury     Medium                  1. Only equipment designed and approved for
                                                          use in the sport of paintball are used. This
                                                          includes paintballs, markers and safety
                               Failure to wear            equipment.
                               goggles in a
                               game area could         2. Players, referees and those liable to come
                               result in loss of           into direct contact with paintballs are briefed
                               an eye or teeth             on the hazards.
                                                       3. Written confirmation is kept on file of the
                                                           brief, in the form of disclaimers and in
                                                           training records.
                                                       4. All playing areas are clearly marked and
                                                           signed.
                                                       S. Boundaries of the site are clearly defined and
                                                           signed to prevent access to members of the
                                                           public.
                                                       6. Approved goggles with ear and face
                                                           protection are worn at all times within the
                                                           plaing area.
                                                       7. Markers are not permitted to enter past the
                                                           safe zone.

Falls from   Severe or         Low
height       Minor injury                              1. Players / referees or other personnel are not
                               Breaking of an             allowed to climb trees or other obstacles not
                                                          designed for this purpose as briefed.
                               ankle, arm, leg
                               or wrist

Slips,       Minor Injury      Low
                                                       1. Players must wear suitable enclosed footwear
trips and                                                 such as joggers.
falls
                               Sprained or             2. Where practicable all slipping/tripping
                               broken ankle,               hazards rempved or clearly identified.
                               grazed knee or
                                                       3. All playing fields are regularly walked to
                               elbows                      identify and mark any new hazards.




                                                                                                        Page 6

Page 17

                             Sunshine Coast Paintball Development Application 2017




Insurance        Provided at Commencement
Workers compensation: Workers compensation insurance will be obtained for all employees
prior to commencement.

Public liability insurance: Public liability insurance will be obtained prior to commencement.

Business assets: All Sunshine Coast Paintball assets will be insured upon purchasing equipment
in the event of fire, theft or damage.

Operations
Trading hours: The proposed trading hours for Sunshine Coast Paintball are:

       Monday to Thursday:             8:00am until 5:00pm

       Friday to Saturday:             8:00am until 10:00pm

       Sunday:                         1:00pm until 10:00pm

Communication channels: Customers would have a number of different options to contact the
business including telephone, email, social media (Facebook and Instagram). as well as via mail.

Payment types accepted: Payments would be available via Cash, EFTPOS,or Gift Card.

Quality control: Regular cleaning and maintenance will be performed on the paintball guns and
related equipment each day to ensure customers have a safe and reliable experience on the
paintball fields.

Sustainability       plan
Environmental/resource        impacts

The proposed development of three small fields by Sunshine Coast Paintball will have a negligible
impact on the environment and surrounding resources. All three fields will use existing open grass
areas and no trees will be removed or damaged, thus, minimising the impact on flora and fauna.

Paintballs are made entirely of non-toxic water soluable food ingredients. The outer shell is
gelatin based and the inner base filling is constructed of polyethelyne glycol which is thickened
with crayon wax. Food dye is then used to colour the paintball. As paintballs are made from food
ingredients, they are 100% biodegradable and non-toxic to both humans and the environment.
Refer to the Supporting Documents for a copy of G.!. Sportz Paintball Material Safety Data Sheet.

To minimise the impact on nocturnal animals in the bushland area, all night time lighting will be
facing towards the church building away from all wildlife. Due to the positioning of the fields on
the lower portion of the property there would be a negligible impact of light on the railway, road
and surrounding residential properties.

Community impact & engagement

The development is predicted to have minimal negative impact to the community. As the attached
acoustic report has found, there would be a negligible sound intrusion to the community. However
introducing a paintball site to the region has the potential to offer a safe environmenet for youth
and young adults. Consequently this may result in a reduction in public consumption of alcohol,
violence and crimes in the area.




                                                                                              Page 7

Page 18

                           Sunshine Coast Paintball Development Application 2017




The Proposal
Sunshine Coast Paintball
Business Location

The Sunshine Coast Paintball site would be conveniently located only minutes from the main town
of Cooroy at a large acerage at 113 Marara Street. This is an ideal location due to close proximity
to the Bruce Highway and having few residential houses nearby. A church building has been
currently established on the property.

Facilities
Car Parking

The existing church building has a 50 car parking capacity which is excess to the needs of the
maximum players allowed during each session (20 persons). Patron cars will be restricted to a
maximum of 10 vehicles per session. Hope Central Church has had one average 50 vehicles each
week on the property for services without complaints over the last 10 years. Therefore there are
no foreseeable issues with parking.

Toilets

Existing toilets are already established within the church building which caters for male, female
and disabled patrons.

Considerations
Noise

A noise assessment was carried out by Alpha Acoustics in August 2016. The report found that
noise emissions from the proposed development site complied with both: Noosa Council noise
limits and The Department of Environmental, and Heritage Protection - Environmental Protection
(Noise) Policy 2008 noise limits. A copy of this report has been made available in the Supporting
Documentation section of this application.

Lighting

For workplace health and safety requirements all 3 fields will have sufficient lighting installed for
night events. The lighting has been arranged to face towards the existing church building and
away from the bush areas. Having the lights facing away will reduce any impact of the light to
animals or wildlife that may inhabit the area. Because the property is sloped, the three fields
would be positioned lower than the road and lighting would have a negligible effect on the
railroad, roads or surrounding residential properties. Please find the attached lighting diagrams in
relation to the fields in Figure 2.

Access Protection and Netting

A 2.1m metal fence will be installed to restrict any access to the property which will extend the
length of the property. The only point of entry will be through the main office to ensure all
patrons, members of the general public and staff are safe at all times. The fields will be fully
enclosed with 4m netted fence lines which will be erected within 15m of the metal fencing. For a
detailed plan please refer to Figure 2.




                                                                                                Page 8

Page 19

                             Sunshine Coast Paintball Development   Application   2017




Traffic

To reduce excess traffic in Marara Street there will be only 10 designated car spaces available for
Sunshine Coast Paintball customers at the Hope Central Church property. As there is a maximum
of 20 players per 2 hour session this would adequately satisfy the demand. From limiting the car
park spaces available this should reduce excess traffic down Marara Street.


Approvals Required
Paintball   Guns (Markers)

Sunshine Coast Paintball is seeking approval for 30 markers to allow for maintenance, repairs or
damages to service a maximum of 20 players.

Figure 2: Field Lighting,    Access and Netting         Diagram




                                                                                                Page 9

Page 20

                           Sunshine Coast Paintball Development Application 2017




The Future
Vision statement
Sunshine Coast Paintball is a business that will strive to excel in recreational services. Our
mission is to provide playing locations and equipment rental services to paintball players in the
area who are currently involved in the sport or who wish to become involved casually. We pride
ourselves on our excellen t customer service while building significant relationships withour
customers. Our business continually aims to enhance the value delivered to our clients and to the
community in which we are located. We will strive to be recognised as a leader in: quality, service
standards, safety, affordability; and be an active employer in the local Cooroy community.




                                                                                             Page 10

Page 21

                      Sunshine Coast Paintball Development Application 2017



Supporting documentation
Attached is all supporting documentation in relation to this development application. The
attached documents include:

•    G.!. Sportz - Paintball Material Safety Data Sheet

•    Noise Assessment - Alpha Acoustic




                                                                                    Page 11

Page 22

                        6000 Kieran,Ville 5t Laurent,QCH452B5 PH:514 3391400, FAX:514 3391009

                                       Paint ball Material Safety Data Sheet

                 (FOR GI SPORTZ, DXS, Dark Sports, & Zap BRANDED PAINTBALLS)

                 Material Description                                         CASNumber
                                                   Fill Components
               Polyethylene Glycol 300                                         25322-68-3
              Polyethylene Glycol 3350                                         25322-68-3
                        Water                                                   7732-18-5
                      Glycerine                                                  56-81-5
                       Sorbitol                                                  50-70-4
                 Food Grade Starch
              FD&C Approved Colorants                                           (Varied)
                  Titanium Dioxide                                             13463-67-7
 CanDia Oil (Used in OXS Frostbite, GI Winter, & Dark Ice)                    120962-03-0
                    Emulsifying Wax                                            8002-74-2
                                                  Shell Components
                        Gelatin                                                 9000-70-8
                       Anti Foam                                                 556-67-2
                      Soy Lecithin                                              8002-43-5

                                                Product Information
Product Identifier                                         Soft Gel Capsule
Product Use                                                 Recreational
Product Decomposition                                       Bio-Degradable
                                            Fill Material Physical Data
Physical State: Liquid                     Odor: No Odor                        Odor Thresh-hold: N/ A
                                           Appearance: Depends on
                                           Colorant
Specific Gravity:                          Co-Efficient of Water/Oil            Vapor Pressure:
l,2oog/ml                                  Distribution:   N/A                  (AIR=1) 1
Boiling Point:    200 Celsius              Freezing Point: 4-9 Celsius          PH: 6, -7.5  I
                                                                                             Vapor Density:
                                                                                             (AIR=1) 1
Evaporation Rate: (BuAc=1) N/ A            Percent Volatile (By Volume): N/A
                                                  Health Hazards
Hazards for Health:          Materials contained in this product are classified as non-hazardous according to
                             the definitions set forth in 29 CFR1910.1200

Eye Contact:                 Fill may cause slight transient irritation
Skin Contact:                Prolonged or repeated exposure not likely to cause significant skin irritation.
Ingestion:                   Single Dose oral toxicity is considered to be extremely low. No hazards
                            anticipated from swallowing small amounts incidental to normal handling
                            procedures.
Inhalation:                  Not Hazardous

Page 23

Carcinogenity:          NTP: no, IRAC:no, OSHA: no
Chronic Effects:        None Known
First Aid Procedures:   Flush effected skin and eyes with plenty of water




                                     Fire and Explosions Hazards
Flash Point:                      > 232. C (4SO. F) PMCC
Autoignltion Temperature:        Not Determined
Flammability Umits: LEL:          Not Determined
UEL:                              Not Determined
Extinguishing Media:               Dry chemical, foam, or C02
Hazardous Combustion Products: Under fire conditions polymers decompose. The smoke may contain
                                   polymer fragments of varying compositions in addition to
                                    unidentified toxic and/or irritating compounds. Hazardous
                                   combustion products may include and are not limited to:
                                   carbon dioxide, carbon monoxide or nitrogen oxides.
Unusual Fire and Explosion Hazards: None known
                                           Reactivity Hazards
Chemical Stability:                  Stable
Incompatibility:                     Avoid contact with strong acids and oxidizing materials.
Hazardous decomposition products: May include and are not limited to:
                                     aldehydes, ketones, organic acids, and polymer fragments.
Hazardous polymerization:            Will not occur
Product is stable under normal use and storage conditions.

                                           Spill Procedures
Hazard Ratings:                    NFPA
Health:                            o
Flammability:                      o
Reactivity:                        o
Protective equipment:                Safety glasses
Spills:                             Solids and liquids may be swept or scooped up and placed in plastic
                                   or metal containers for disposal. Dispose of materials according to
                                    applicable federal, state and local regulations. Non-hazardous waste
                                   under RCRAregulations.
                                    Handling and Special Precautions
Handling and storage:            Product should be kept in original containers or other suitable
                                 containers and protected from excessive exposure to air, heat, and
                                 light.
                                                Regulatory
SARA313 Title III:             Not regulated
TSCA:                          All ingredients are listed on the TSCAinventory.
DOT:                           Not Hazardous
OSHA:                          Not Hazardous
WHMIS Classification (Canada): Not a "Controlled Product"




                                                     Phone:
                                                     (514)339-1400 ext 248

Page 24

                      CONSULTING                        ACOUSTICAL                        ENGINEERS
                                                           ABN 22 180702408


                      PO Dox 700 Margate Deach QLD 4019 AUSTRALIA
                      Ph: (07) 3885 2380          Mob: 0420935 874
                      Email: info@a!phaacoustics.com.au Website: www.alphaacoustics.com.au



To:            Graham Young                                              [email protected]

Attention:     Graham Young

Reference:     J 1562 - Noise Assessment - Paintball Field - Cooroy (Rev 2).doc




                          NOISE ASSESSMENT - --
                                                                                                I                       ------
                                                                                                                    e
                                                                                                       •   j   •   t    l,t (Ounter
                                      Paintball FieldsI                                                    10 JAN 2017

                        113 Marara Street, Cooroy, QLD, 4563 _".co nt'n




                                                                                     Date: 2nd August, 2016
                                                                                     Number of Pages: 17 (inc)




 This document is not intended for a third party and no responsibility is undertaken to a third party. If this document is to
 be reproduced. it should be reproduced in full.

Page 25

    .'



   Contents
               I.      EXECUTIVE SUMMARY                                                                                              3
               2.       INTRODUCTION & SITE DESCRIPTION                                                                               4
               3.       NOISE SURVEY INSTRUMENTATION                                                                                  6
               4.       EXISTING NOISE ENVIRONMENT                                                                                    7
                       4.1      Envi ronmcntaJ Monitoring Conditions                                                                  9

               5.       NO ISE CRITER IA                                                                                             10
                        5.1     Noosa Council Critcria                                                                               10
                        52      Environmcntal Protection (Noise) Policy 2008                                                         10
                        53      Conlrolli ng Background Creep                                                                        1I
                        5.4     Projcct Specific Noise Criteria                                                                      1I

               6.       NOrSE IMPACT ASSESSMENT                                                                                      12
                        6.1     Noise Sources                                                            '                    "      12
                        62      Noise Modell iog Results                                                                             14

               7.       NOISE IMPACT STATEM ENT                                                                                      16
               APPENDIX A - GLOSSARY OF ACOUSTIC TERMS                                                                               17


   DISCLAIMER

   This Report hy Alpha Acoustics Ply Ltd is prepared for a particular Client and is based on the agreed objcclivc. scope. conditions and
   limitations as may be stated in the Executive summary. The Report presents only the information that Alpha Acoustics Ply Ltd
   believes, in its professional opinion, is relevant and necessary to describe the issues involved. The Report should not he used for
   anything other than the intended purpose and should not be reproduced, presented or reviewed except in full. The intellectual
   property of this Report remains with Alpha Acoustics Ply Ltd. The Client is authorised, upon payment to Alpha Acoustics Ply Ltd of

   Ihe agreed Report preparation fcc, to provide this Report in full to any third party.

   Recommendations made in this report are intended to fC.'mlveacoustical problems only. We make no claim of expertise in other areas
   and draw your attention to the possibility that our recommendations       may nol meet the structural, fire, thennal, or other aspects of

   building construclion

   We encourage clients to check with us before using materials or equipment that are alternative to those specified in our Acoustical

   Report.

   The integrity of acoustic structures is very dependent on installation techniques. For example, a small crack between the top of a wall
   and a ceiling can reduce the effective sound transmission loss of a wall from R", 50 to Rw40. Therefore the use of contractors that are
   experienced in acoustic construction is encouraged. Furthermore, two insulation produCl'i may have the same thermal R rating but the
   sound absorption of one may be entirely deficient, therefore the usc of materials and equipment that arc supported by acoustic

   laboI"'dtorytest data is encouI"'dged.




@ Alpha Acoustics     "y Ltd                                                                                 Pa~c 2 of 17
Dt.-,c:J 1562 - Noise Assessment - Paintball Ficld - Cooroy (Rev 2).doc

Page 26

   I.         EXECUTIVE SUMMARY


   This report considers the noise impact assessment of the proposed paintball fields at 113 Marara
   Street, Cooroy 4563. The paint ball fields proposed hours of operation are from:


          •   8:00am to 5:00pm Monday to Thursday .

          •   8:00am to I0:00pm Friday to Sunday .

   This report is prepared in accordance with the following policy documents and standards:

          • The Department of Environment and Heritage Protection - Environmental Protection
              (Noise) Policy 2008.
          •   Noosa Shire Council Planning Scheme 2013

          •   Australian Standard AS I055: I - Acoustics: Description and measurement of environmental
              noise


   It is concluded that.
          •   Noise emissions from the proposed paintball fields at 113 Marara Street, Cooroy 4563 have
              been assessed at the nearby residential receivers. The noise emissions from the operation of
              the proposed paintball fields were found to be comply with Noosa Council noise limits and
              The Department of Environment and Heritage Protection - Environmental                Protection
              (Noise) Policy 2008 noise limits.



   It is recommended that.
          •   It is recommended that the paintball field's park operate under a noise management plan that
              controls the number of patrons to 20 at anyone time.
          •   The use of sounding horns be minimized.




@ Alpha  Acoustics Ply Ltd                                                         I'age 3 of 17
Doc: 11562 - Noise Assessment - PaintbaJl Field - Cooroy (Rev 2).doc

Page 27

  2.        INTRODUCTION & SITE DESCRIPTION

  This report considers         the noise impact assessment            of the proposed   paintball    fields at 113 Marara

  Street, Cooroy 4563. The paint ball fields proposed hours of operation are from:


       •    8:00am to 5:00pm Monday to Thursday .

       •    8:00am to I0:00pm Friday to Sunday .

  This report is prepared in accordance             with the following policy documents        and standards:

       •    The Department        of Environment       and Heritage Protection - Environmental             Protection

            (Noise) Policy 2008.

       •     Noosa Shire Council Planning Scheme 2013

       •    Australian Standard AS I055: I - Acoustics:                Description and measurement        of environmental

            noise




t<lAlpha Acoustics Ply Ltd                                                                           I)a~e4 of 17
Doc: 11562 - Noise Assessment - Paintball Field - Cooroy (Rev 2).doc

Page 28

                                                                                                            USPfJZU
                                                                                                                        ••
                                                                                             ,              tSPf11fJf

                                                                                  1~   '"  •         h



                                                                          "
                                                                          n
                                                                                   ~!SP~16J TSPIIHJI

                                                                                      \.   \f;~fl25J1

                                                                                           ~sp'11'11
                                                                                                        . n
                                                                                                                          .•
                                                                                                              JSPJ4J401

                                                                                                   /
                                                                                                                        "
                                                                                                                                    ,
                                                                                                                        JRP102J1J

                                                                                                   I
                                                                                       IRP"'JOiJ
                                                                                                               &RPa",JDO     "
                                                                                                             fQRPUU(lO
                                                                                                                          ••
                                                                                       •
                                                                              JRP1 117JJ
                                                                                                                 ,
                                                                                                       JRP1 'J7JJ




@AlphaAcoustics Ply Ltd                                                           IJage 5 or 17
Doc: J 1562 - Noise Assessmenl-   Paintball r"ic1d - Cooroy (Rev 2).doc


[OCR of page images]
 

Figure 2.3: Locale Zoning

t TARP 134343 a

reine eens

 

© Alpha Acoustics Pty Ltd Page 5 of 17
Doc: J1562 - Noise Assessment - Paintball Field - Cooroy (Rev 2).doc

Page 29

  3,      NOISE SURVEY             INSTRUMENTATION

  Noise level measurements were made with instrumentation as follows in Table 3.1:

  Table 3.1           Noise Instrumentation


    Description                                               Model No.                           Serial No,

    Modular Precision Sound Analyser                          B&K 2260                            2459227

    Condenser Microphone OS' diameter                         B&K4189                             2458107

    Acoustical Calibrator                                     B&K4231                             267 1553

    Microphone Windscreen                                     Acoustically transparent foom

    Rion Noise Logger                                         NL-22                               01273552

    Condenser Microphone OS' diameter                         UC-52                               117008

    Microphone Windscreen                                     Acoustically transparent foom

  All instrument systems had been laboratory calibrated using instrumentation traccable to Australian National
  Standards and certified within the la,t two years thus conforming to Australian Standards. The measurement
   system was also calibrated prior to and after the noise survey. Calibration drift was found to be less than 0.3
   dB during attended measurements               and less than 0.5 dB during long tenn noise measurements.     No
   adjustments for instrument drift during the mcasurement period were warranted.




@ Alpha Acoustics   Ply Ltd                                                                   I'age 6 of 17
Doc: J 1562 - Noise Assessment - Painlball Field - Cooroy {Rev 2).doc

Page 30

  4.      EXISTING NOISE ENVIRONMENT

  In order to assess the severity of a possible environmental                    noise problem it is necessary to measure

  the ambient       background       noise level at the times and locations            of worst possible annoyance.   The

  lower the background            noise level, the more perceptible          the intrusive    noise becomes and the more

  potentially annoying.

  A background        noise survey was conducted              between Saturday 23«1 April 2016 and Friday 29th April

  2016. The background             measurement        location (BG MLJ)          was located behind the existing   church

  building (see Figure 4.1). The measured levels are considered                     free field.




   Ambient      sound pressure        levels were measured            genemlly    in accordance   with Austmlian   Standard
   ASI055.1: 1997 - 'Acoustics-Description                and measurement of environmental         noise - Part 1: Geneml
   procedures'. Ambient noise levels were recorded at continuous 15 minute intervals. (see Figures 4.2, and

   Tables 4.2)




@ Alpha Acoustics   Ply Ltd                                                                        Page 7 of t7
Doc: J 1562 - Noise Assessment.   Paintball Field - Coo roy (Rev 2).doc

Page 31

   Figure 4.2: Existing noise levels at Location BG MLI, levels free field.
                                           Meawred   Noise Level, dB(A)
                                                                              ~
                                                                              o
                                       ~      ~      ~       8        ~   ~   o
              Saturclay:6:0000    PM
              Saturclay:9:0000    PM
              Sunday:12:OO:OO AM
                Sunday:3:00:00    AM
                Sunday.6:00:00    AM
                6unday9:oo:oo     AM
              6unday12:OO:OO PM
                6unday3:OO:OO PM
                6unday:6:OO:00 PM
                Sunday9:00:oo     PM
              MondayI2:oo:OOAM
               Monday:3:00:00AM
               Monday6:oo:ooAM
                Monday9:oo:ooAM.
              Monday: 12:00:00 PM
                Monday3:oo:oo     PM
                Monday6:oo:oo     PM
                Monday900:oo      PM

      I       Tl.esday12:00:00    AM
               TLeSday3:OO:OOAM
     ~
               TLesday:6:00:00AM
               Tlesday:9:00:00AM
              Tlesday:12:00:00 PM
               Tlesday:3:OO:00    PM

      I        Tlesday:6:00:00 PM
     r-        Tl.esday:9:00;OO
                              PM
     ~     Wednesday:12:00:00     AM
            Wednesday:3:00:00     AM
            Wednesday6:OO:OO AM
            Wednesday:9:00:00     AM
           Wedresday    12:00:00 PM


     s:I
            Wednesday3:oo:oo      PM
            Wednesday:6:00:00     PM
     ~      Wednesday,9:00:00     PM
             n1.lrsdayI2:oo:oo    AM
              Ttusday3:OO:OO      AM
              ThJrsday:6:00:oo    AM
              ThJrsday:9:OO:oo AM
             Tturroay,12:00:00 PM
              Tt'vrsday:3:00:00   PM
              ThJrsday:6:oo:oo    PM
              ThJrsday:9:OO:oo PM
                 Fnday:l2:OO:oo   AM
                  Friday:3:00:OO AM
                  Fnday:6:00:oo   AM




@ Alpha Acoustics Ply Ltd                                                         l'OK" 8 of 17
Doc: JI562 - Noise Assessment - Painlball Field - Coomy (Rev 2).doc

Page 32

'.




       Table 4.2: Average ambient and background noise levels recorded at Location BO MLI. levels in dB(A),
       free field
                                                                                               Measured Background
                Period                LAI              LAIO              LAeq      LAmax            Noise Level
                                                                                                    LA90,dB(A)
                 Day
        -                              62                48                  47      7\                   41
             (7am t06pm)
               Evening
             (6pm to IOpm)
                          -            63                43                  43      (f)                   37

                 Night                                                                                     35
                                       63                42                  43      72
             (I0pm to 7am)




       4.1               Environmental        Monitoring      Conditions

       The environmental         conditions     noted during the measurement      period are summarised   as follows:
       Conditions:             Mostly Fine
       Wind:                   0 - 3 mls from primarily a SE direction
        Humidity:              approximately       51 - 77 %
       Temperature:            Range between 9 - 24°C
        Calibration:           varied by less than +1- 0.5 dB.




     @ Alpha Acoustics   Ply Ltd                                                                 Page 9 of 17
     Doc: J 1562 - Noise Assessment - Paintball Field - Cooroy (Rev 2).doc

Page 33

  5.        NOISE CRITERIA
  5.1               Noosa Shire Council         Criteria
  Noosa Shire Council            noise criteria for a paintball            facility can be found in the planning                 scheme
  policy Business Uses Code which states in Table 14-8 Section 020                               "development is designed and
  sited to avoid noise emissions that unreasonably diminish the amenity of the area or surrounding
  uses". The Environmental             Protection     (Noise) policy 2008 as described              below is used to ensure this

  specific outcome is achieved.



  5.2               Environmental        Protection      (Noise) Policy 2008
  The purpose of the Environmental Protection (Noise) Policy is to achieve the object of the Environmental
  Protection Act in relation (0 the acoustic environment.                    The environmental         values to be enhanced           or

  protected        under the policy are the qualities                of the acoustic     environment         that are conducive         to
  protecting the health and biodiversity                of ecosystems;       and the qualities of the acoustic environment

  that are conducive             to human      health      and   well-being,        including    ensuring       a suitable      acoustic

  environment         for individual's      to sleep,      study and learn, to be involved                in recreation        including
  relaxation       and conversation;       and the qualities          of the acoustic     environment        that are conducive         to

  protecting       the amenity      of the community.            The acoustic        quality    objectives      do not differentiate
  between sleeping areas, living areas and work areas. Acoustic quality objcctives and environmental

  values for dwellings arc shown in Table 5.3.1.

  Table 5.3.1: Acoustic aualitv objcctives and environmental values for dwellings (EPP (Noise) 2(08)
                                                     Acoustic Quality Objective
                                                             (Measured at the Receptor), dU(A)                         Environmental
       Sensitive
                            Time of Day
       Receptor                                                                                                                Value
                                                      LAeq,adj,lhr        LAIO,adj,thr           LAOI,adj.lhr
      Dwellings         Daytime and evening                                                                                  Health and
                                                            50                 55                    65
   (for outdoors)         (7am to IOpm)                                                                                      wellbeing
      Dwellings         Daytime and evening                                                                                  Health and
                                                            35                 40                    45
    (for indoors)         (7am to 100m)                                                                                      wellbein"
                                                                                                                             Health and
      Dwellings               Night-time                                                                                    wellbeing in
                                                            30                 35                    40
    (for indoors)           (lOpm to 7am)                                                                                  relmion to the
                                                                                                                           abilitv to sleeo




@ Alpha Acoustics  Ply Ltd                                                                                I'age 10 of 17
Doc: J 1562. Noise Assessmcnl-    Paintball Field - Cooroy (Rev 2).doc

Page 34

  5.3              Controlling      Background         Creep
  To the extent that it is reasonable to do so. noise from an activity must not be-


         •     for noise that is continuous      noise measured by LA9Q.T-more than nil dB(A) greater than the

              existing acoustic environment            measured by LA90.T;or


         •     for noise that varies over time measured by LAeq.adj.T-more than 5dB(A) greater than the

               existing acoustic environment           measured by LA9Q,T

  Table 5.3.2: Recommended noise limits for controlling background creep (EPP (Noise) 2(08)


                                                                                Recommended           Noise Limit
                                    Measured Noise Level
             Time of Day                                                                               Noise Which Varies
                                          LA90 dB(A)                     Continuous Noise
                                                                                                            With Time
                                                                             LA" dB(A)
                                                                                                            LA~ dB(A)
            Daytime                                                             41                               46
                                                 41
         l7am to 100m)
            Evening                                                             37                               42
                                                 37
         (7am to 100m)
           Night-time                                                                                            nla
                                                 n/a                            n/a
         (100m to 7am)



   5.4              Project   Specific Noise Criteria

   Reference       is made       to the Environmental           Protection    (Noise)    Policy      2008   which      require   that
   background       creep is avoided.       Project specific noise criteria is summarised             in Table 5.3.3 below.



   Table 5.3.3: Proiect Sneci IiICNoise Levels



             Time of Day                                  Recommended        Nosie Limits


                Daytime                     46 dB(A) LAeq,adj.T                   65 dB(A) LAI.adj.T

             (7am to IOpm)              (Variable noise Outdoors)                       (Outdoors)

                Evening                     42 dB(A) LAeq,adj.T                   65 dB(A) LAI,adj.T

             (6pm 10 IOpm)              (Variable noise Outdoors)                       (Outdoors)

               Night-time
                                                        nla                                 n/a
             (lOpm to 7am)




'" Alpha Acoustics Ply Ltd                                                                             "age 11 of 17
Doc: J1562 - Noise Assessment - PaintbJ.,1l Field - Cooroy (Rev 2).doc

Page 35

   6.        NOISE IMPACT ASSESSMENT
   6.1            Noise Soun:es
   Noise measurements of an existing paintball facility were taken at mango hill under normal
   paintbalI game conditions with 40 people per game. The proposed paintball facility will have a
   maximum of 20 players at anyone time. Sound power level and noise spectrum of the paintball
   activities motorbikes for use in noise modelling. Noise measurements were taken on Saturday 23n1
   April 2016 using a Bruel & Kjaer 2260 noise analyser and two noise loggers located at 60 meters
   from the game area. The results of the noise measurements are given in Table 6.1.1 below and
   Figure 6.1 shows photographs taken during the noise measurements.

   Table 6.1.1 Paintball Game Sound Power levels

                                                                        Sound Power Levels (dB)
              Description
                                                                 at Octave Band Centre Frequencies (Hz)
                                              Descriptor        dBA 63       125   250 500       Ik    2k        4k    8k
                10 people                       LAeq             90    89    88     83     82    82    84        83    77
         1 machine paintball gun                 LAeq            88     84   86     81    85     83        81    79    75
         I machine paintball gun                  LAI            96     92   98     91    93     93        90    89    84
         I hom and starter shout                  LAl            116    93   83     84    98     108       113   107   93

   Note: at a distance of 60m the paintball noise emissions were not tonal but an impulsive penalty of
   5 dB(A) is applied as part of a conservative assessment.




@Alpha Acoustics Pty Ltd                                                                    l'age1Z ofl7
Doc: J 1562 - Noise Assessment - Paintball Field - Cooroy (Rev 2).doc

Page 36

   The noise measurement setup of an existing paintball was captured in the following figures:

   Figure 6.1: Acoustic measurements setup A




   Figure 6.2: Acoustic measurements setup B




@ Alpha Acoustics   Ply Ltd                                                    !'age 13 orI 7
Doc; J 1562 - Noise Assessment - Paintball Field - Cooroy (Rev 2).doc

Page 37

   6.2             Noise Modelling Results
   A digital terrain noise model of the site and surrounds has been developed using PEN3D. The LAeq
   and LA I noise contours for 20 people playing paintball are shown in Figure 6.3 and Figure 6.4
   respectively below. The worst case field being used in the noise model is the northern most field:

   Figure 6.3 LAeq noise contours




   Figure 6.4 LA I noise contours




@AlphaAcoustics     Ply Ltd                                                     I'~e 14of 17
Doc: J 1562 - Noise Assessment - Paintball Field - Cooroy (Rev 2).doc

Page 38

  Table 6.1 below details the predicted LAeq noise levels at the neasrest and most affected residential
  locations with a + 5 dB(A) penalty for potential impulsive noise applied to all predicted levels.

           . Pred'Icted LAeo, dB(A) nOIse leve s at nearby residences (+5dB(A) imnulsive renalty)
  T a ble 61

   Receiver                                       Noise levels          Noise Criteria   LAeq, dB(A)           Pass '!
                                                      dB(A)
                                                                           Day              Evening

   141 Marara Street, Cooroy                             37                 46                42                Yes


  4 Pearsons Road, Cooroy                                30                 46                42                Yes




  Table 6.2 below details the predicted LA I noise levels at the neasrest and most affected residential
   locations with a + 5 dB(A) penalty for impulsive noise applied to all predicted levels.

   Table 6.1 Predicted LAeo, dB(A) noise levels at nearbv residences (+5dB(A) imDulsive oenalty)

   Receiver                                       Noise levels          Noise Criteria   LAI, dB(A)            Pass '!
                                                      dB(A)                                 Evening
                                                                           Day

   141 Marara Street, Coo roy                            63                 65                65                Yes


   4 Pearsons Road, Cooroy                               55                 65                65                Yes




@ Alpha Acoustics   Ply Ltd                                                                   ('age 15 of 17
Doc: J 1562 - Noise Asscssmcnl-   Paintball Field - Coomy (Rev 2).doc

Page 39

   7.         NOISE IMPACT STATEMENT


   Noise emissions from the proposed paint ball fields at 113 Marara Street, Cooroy 4563 have been
   assessed at the nearby residential receivers. The noise emissions from the operation of the proposed
   paintball fields were found to be comply with Noosa Shire Council noise limits and The
   Department of Environment and Heritage Protection - Environmental Protection (Noise) Policy
   2008 noise limits.

   It is recommended         that.
          •   It is recommended that the paintball field's park operate under a noise management plan that
              controls the number of patrons to 20 at anyone time.
          •   The use of sounding horns be minimized .




   ALPHA ACOUSTICS PTY LTD
   (Member Firm of the AAAC)




   Matthew Fishburn, BE(Mech) Hons, MAAS, MIEAust, CPEng, RPEQ (14356)
   Principal Consulting Acoustical Engineer
   for and on behalf of Alpha Acoustics.
   Noise and Vibration Engineers

   I'h:        07 38852380
   Mob:        0420935874
   Email:      [email protected]




@ Alpha Acoustics  Ply Ltd                                                        "a~e16 of 17
Doc: JI562 - Noise Assessment ~ Paintball Field - Cooroy {Rev 2).doc

Page 40

   APPENDIX A - GLOSSARY OF ACOUSTIC TERMS
   The following is a brief description of the technical tcrms used to describe traffic noise to assist in understanding the
   technical issues presented in this document.


   Evetlt maximum sound pressure level (LA%lldj,T),          un
   The 1.0I level is calculated as the noise level equalled and exceeded ror I % or the measurement time, for example 9
   seconds in any 15 minute interval. 1...01is an appropriate level [0 characterise single events. such as from impulsive or
   distinctive pass-by noisc. In this Report, the measured LOI levels for day/evening/night          arc not averaged but are
   ammgcd from low to high in the relevant day/evening/night interval and the va.lue that is found at the 90th percentile
   (LID of 1.01 sample) in the interval is recorded as its "1.01" level. The level can be adjusted for tonality or
   impulsiveness.


   Average maximum sound pressure level (IA %Ildj, T), L10
   The "LIO" level is an indicator of "steady-state"         noise or intrusive noise conditions from traffic, music and other
   relatively non-impulsive noise sources. The LIO level is calculated as the noise level equalled and exceeded for 10% the
   measurement      time, for example 90 seconds in any 15 minute interval. The measured LIO time-intervals                for
   day/c~eninglnight    3rc arithmetically    averaged to present the "avcmge      maximum" Icvels of the cnvironment      for
   day/evening/night. The level can be adjusted for tonality or impulsiveness.


   BackgroulJd sOImd pressure level (IA90,1), L90
   Commonly called the "L90" or "background" level and is an indicator of the quietest times of day, evening or night. The
   L90 level is calculated as the noise level equalled and exceeded for 90% the measurement time. The measured L90
   time-intervals   arc arithmelically    averaged to present the "average       background"   levels of the environment   for
   day/evening/night. The Ic\'el is recorded in thc absence of any noise under investigation. The level is not adjusted for
   tonality or impulsiveness.


   Equivalent Continuous or time average sound pressure level (l.Aeq,1), l..eq
   Commonly called the "Leq" level it is the logarithmic avcrage noise level from all sources far and ncar. The maximum
   I-hour levels within the day/evening/night lime intervals arc referenced for huilding design. The level can be adjusted
   for tonality.


   Fafade-adjusted level
   A sound level that is measured at a distance of 1.0 metre from a wall or facade. The level is nominally 2.5 dB higher
   than the rree-field level.


   Free.field level
   A sound level that is measured at a distance of more than 3.5 mclres from a wall or facadc.


   Weighted SoulJd ReductUJII/lJdex, Rw
   A singlc number value used to compare the sound reduction index of building clements. Similar to the Sound
   Transmission Class (STC) rating that is still in common use. Rw and src arc not idenlical though may be considered,
   for most applicalions, as being interchangeable. A high Rw indicates high sound reduction.




~ Alpha Acoustics l'y Ltd                                                                         I'age 17 of 17
Doc: J 1562 - Noise Assessment - Paintball Field - Cooroy (Rev 2).doc

Used in these records

About this file

File size
13.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

MCU17_0005 - IDAS Application - 113 Marara St Cooroy.pdf · 13.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.