Council archive · source document
MCU17/0005 - IDAS Application - 113 Marara St Cooroy
Very large file (13.0 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Sunshine Coast Paintball Development Application 2017 The Proposal Sunshine Coast Paintball Business Location The Sunshine Coast Paintball site would be conveniently located only minutes from the main town of Cooroy at a large acerage at 113 Marara Street. This is an ideal location due to close proximity to the Bruce Highway and having few residential houses nearby. A church building has been currently established on the property. Facilities Car Parking The existing church building has a 50 car parking capacity which is excess to the needs of the maximum players allowed during each session (20 persons). Patron cars will be restricted to a maximum of 10 vehicles per session. Hope Central Church has had one average 50 vehicles each week on the property for services without complaints over the last 10 years. Therefore there are no foreseeable issues with parking. Toilets Existing toilets are already established within the church building which caters for male, female and disabled patrons. Considerations Noise A noise assessment was carried out by Alpha Acoustics in August 2016. The report found that noise emissions from the proposed development site complied with both: Noosa Council noise limits and The Department of Environmental, and Heritage Protection - Environmental Protection (Noise) Policy 2008 noise limits. A copy of this report has been made available in the Supporting Documentation section of this application. Lighting For workplace health and safety requirements all 3 fields will have sufficient lighting installed for night events. The lighting has been arranged to face towards the existing church building and away from the bush areas. Having the lights facing away will reduce any impact of the light to animals or wildlife that may inhabit the area. Because the property is sloped, the three fields would be positioned lower than the road and lighting would have a negligible effect on the railroad, roads or surrounding residential properties. Please find the attached lighting diagrams in relation to the fields in Figure 2. Access Protection and Netting A 2.1m metal fence will be installed to restrict any access to the property which will extend the length of the property. The only point of entry will be through the main office to ensure all patrons, members of the general public and staff are safe at all times. The fields will be fully enclosed with 4m netted fence lines which will be erected within 15m of the metal fencing. For a detailed plan please refer to Figure 2. Page 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
MCU17/0005 - IDAS Application - 113 Marara St CooroyRelated documentApplication case desk ↗
About this file
- File size
- 13.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.