Council archive · source document
10/0334 - Detached House [As Published] · 132010.334
16. List below all of the forms and supporting information that accompany this application (include alt IDAS forms, checklists, mandatory supporting information etc. that will be submitted as part of this application. Note: this question does not apply for applications made on-line using Smart eDA) Description of attachment or title of attachment Method of lodgement to eo IDAS Form Ss assessment manager 0 AROMITECTURAL Pues — Mcv-l_ Site Analysis «Lond delivered v : 7 : . “Rear selbace ehody op. ad jomina propuhds\ Hod copy han — BA01-Site Suneg Plan 9 BA-O4 Rerf Plan 0 “2-05 p07 Llevaltnn dSechoas 1100 scale. BHA Disa “trwanidlal veg shel 17. Applicant's declaration (7 By making this application, | declare that all information in this application is true and correct (note: it is unlawful to provide false or misleading information). Notes for completing this form Question 8: * Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is required for an application. Section 260(1)(e) of the Susta/nable Planning Act 2009 provides that if the owner’s consent is required under section 263, then an application must contain, or be accompanied by, the written consent of the owner, or include a declaration by the applicant that the owner has given written consent to the making of the application, © Owner's consent is not required for a mobile and temporary ERA. Question 9: © Section 264 of the Sustainable Planning Act 2009 provides that if a development involves a state resource, a regulation may require the application to be supported by certain evidence prescribed under the regulation. Schedule 14 of the Sustainable Planning Regulation 2009 prescribes the state resources for which evidence is required to be given, and the evidence required, to support the application. Question 13: ¢ The Building and Construction Industry (Portable Long Service Leave) Act 1991 prescribes when the portable long service leave levy is payable. * The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy are prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002. Question 14: ¢ The portable long service leave levy need not be paid when the application is made, but the Building and Construction Industry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a development permit is issued. © Building and Construction Industry Notification and Payment Forms are available from any Queensland post office or agency, on request from QLeave, or can be completed on the QLeave website at www.qleave.qld.gov.au. For further information contact QLeave on 1800 803 481 or www.qleave.qld.gov.au. 6 Application details—IDAS form 1 Version 1.0 18 December 2009
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
10/0334 - Detached House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.