Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

MCU16/0012 Attach E- Unity Water advice

of 2

Page text shows just the words. Original shows the document exactly as it was published.

                       The developer will be required to pay Unitywater to provide a new 150mm dia.
                        sewerage connection point to Unitywater’s existing sewerage network.
                       All existing sewerage connection points (total 4) are to be capped-off by Unitywater
                        at the developer’s expense.
                       Any change to Unitywater’s existing infrastructure as required by this proposal
                        must be carried out at no cost to Unitywater.
                       All water supply and sewerage works must be designed and constructed in
                        accordance with the South East Queensland Water Supply and Sewerage Design
                        and Construction Code, Unitywater’s Connections Administration Manual and any
                        other matter Unitywater considers to be relevant to the connection or supply of its
                        water services or wastewater services.
                       Where works associated with the Connection Application results in works to be
                        carried out in a publicly controlled place e.g. roads, it is the Applicants
                        responsibility to gain the necessary approvals from the relevant authority e.g.
                        council, Department of Transport and Main Roads. It is the Applicant’s
                        responsibility to ensure that it has all necessary consents and approvals to carry
                        out any works in a publicly controlled place prior to starting any such works.
                       Easements will be required over all existing sewerage mains in accordance with
                        the South East Queensland Water Supply and Sewerage Design and Construction
                        Code.
                       Payment of Levied Charges will be required in accordance with Unitywater’s
                        Infrastructure Charges for water supply and sewerage.


              If you have any queries about the advice please contact Unitywater at
              [email protected] or by phone on 1300 086 489.


              Yours sincerely




              Andrew Matthews
              Principal Development Engineer
              Development Services




                                                                                                                                            Page 2 of 2
Unitywater is a statutory authority that provides water and sewerage services for the                           Unitywater has certification to
                                                                                                                OH&S ISO 4801:2001 Reg No 4260
Moreton Bay, Sunshine Coast and Noosa Council areas.                                                            Environmental ISO 14001:2004 Reg No 4259
                                                                                                                Quality Systems ISO 9001:2008 Reg No 4258

                                                     Revision No: 2                Effective Date: 19/02/2015           Next Review Date: 19/02/2018
Log in to download the original file

MCU16_0012 Attach E- Unity Water advice.pdf · 221 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.