Skip to the record
Accept no substitutions.

Original source · versioned page text

Information Response

of 24

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Performance outcomes                                  Acceptable Outcomes                                 Compliance
                                                      Editor’s Note— the urban boundary is indicated
                                                      on the zone maps contained within Schedule 2.

                                                      Editor’s Note— applicants will be required to pay
                                                      a performance bond to Council before
                                                      final building approval is granted. The bond is
                                                      held by Council until all external building works
                                                      are completed to a satisfactory level, usually
                                                      within a 12 to 24 month time frame.

Housing choice                                                                                            Complies with A03.
PO3                                                   AO3                                                 The proposed secondary dwelling has a maximum gfa of 65m2 and
A secondary dwelling:                                 A secondary dwelling:                               contains two (2) bedrooms. It is noted gfa excludes unenclosed
                                                                                                          private balconies, whether roofed or not. The land is not covered
 1.   forms part of a dwelling house and is not        1.   has a maximum gross floor area of 65m²;       by a Building Unit Plan and only contains a single dwelling house.
      subdivided from the balance of the dwelling      2.   has no more than 2 bedrooms;
      house;                                           3.   does not occur on any property covered by
 2.   contributes to housing choice for members of          a Building Unit Plan; and
      the one household;                               4.   does not occur on a property that already
 3.   protects the low density residential, rural           contains a dual occupancy or secondary
      residential or rural character of the zone;           dwelling.
 4.   does not occur on a property covered by
      a Building Unit Plan or any property already
      containing more than one dwelling;
 5.   is accompanied by sufficient car parking.
PO4                                                    AO4                                                Not relevant to this application.
Rooming accommodation is located on a site with        Rooming accommodation provides housing
convenient access to employment or education as        choice within urban boundaries is limited to sites
well as goods and services including public transport. within:

                                                       1.   1,500 metres walking distance, via a sealed
                                                            pathway, of land within the Major centre
                                                            zone, District centre zone or 800 metres of
                                                            land within the Neighbourhood centre zone;
                                                            or
                                                       2.   800 metres walking distance, via a sealed
                                                            pathway of a pedestrian access point of
                                                            a hospital or tertiary education
                                                            establishment; or
                                                       3.   400 metres walking distance, via a sealed
                                                            pathway, of a Translink bus stop.
Log in to download the original file

Information Response.pdf · 9.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.