Original source · versioned page text
DA Form 1 0185_001-1
Attached to the e-mail Operational Works Application OPW21/0189 - DA Form 1 Application Driveway crossovers & Stormwater Discharge connection 13-15 Hilton Esplanade Tewantin.
section 22A of the Vegetation Management Act 199
(1 Yes - this development application includes written confirmation from the chief executive of the Vegetation
Management Act 1999 (s22A determination)
CINo
Note: 1. Where a development application for operational work or material change of use requires a s22A determination and this is not included,
the development application is prohibited development.
ing for further information on how to obtain a s22A determination.
Environmental offsets
23.4} Is this deveiopment application taken lo be a prescribed activity that may have a significant residual ‘mp
prescribed environmental matter Under the Environmental C
01 Yes - | acknowledge that an environmental offset must be provided for any prescribed activity assessed as
having a significant residual impact on a prescribed environmental matter
No
Note. The environmental offset section of the Queensland Government's website can be accessed at www, aid. gov.au for further information on
environmental offsets.
Koala conservation
cation invoive a material Tom Miguring a lot or operational work
a under Schedule 10, Pe , = Planning Regulation 2017?
{No
Note: See guidance materials at www.des,gid.gov.au for further information.
Water resources
23.6) Does this Geveiopment application involve taking or interfering with underground water through an
artesian or subartesian bore, taking or interfering with water in a watercourse. lake or spring, or taking
overland flow water under the Water Act 2000?
(1 Yes - the relevant template is completed and attached to this development application and | acknowledge that a
relevant authorisation or licence under the Water Act 2000 may be required prior to commencing development
jo
Note: Contact the Department of Natural Resources, Mines and Energy at www.dnrme.gid.gov.au for further information.
DA templates are available from /iltps:/olanning.dsdmip,qid.gov.au/. If the development application involves:
° Taking or interfering with underground water through an artesian or subartesian bore: complete DA Form 1 Template 4
¢ Taking or interfering with water in a watercourse, lake or spring: complete DA Form1 Template 2
* Taking overland flow water: complete DA Form 1 Template 3.
Waterway barrier works
Does this application involve waterway barrier works?
(11 Yes - the relevant template is completed and attached to this development application
[No
DA templates are available from hitos:/planning.dsdmip.gid.gov.au/. For a development application involving waterway barrier works, complete
DA Form 1 Template 4.
Marine activities
23.8) Does this development application involve aquaculture, works within a declared fish habitat area or
removal, disturbance or destruction of marine plants?
{J Yes - an associated resource allocation authority is attached to this development application, if required under
the Fisheries Act 1994
[No
Note: See guidance materials at www.daf.gid.gov.au for further information.
Quarry materials from a watercourse or lake
zene} Blox Ui) lopment application involve the removal of quarry materials from a watercourse or lake
C1 Yes - | acknowledge that a quarry material allocation notice must be obtained prior to commencing development
Page 9
DA Form 1 — Development Application details
Version 1.1— 22 JUNE 2018