Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

Appendix C - Stormwater Management Plan

of 74

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (31.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
31 October 2018



Land Use – Commercial                    Log10 TSS (mg/L)                    Log10 TP (mg/L)             Log10 TN (mg/L)


                                                         Storm                           Storm                       Storm
                                    Base Flow                           Base Flow                     Base Flow
                                                         Flow                            Flow                         Flow

Roof               Mean                     0             1.30               0           -0.89           0            0.37

                   Std. Dev.                0             0.38               0           0.34            0            0.34

Roads              Mean                 0.78              2.43              -0.6         -0.30          0.32          0.37

                   Std. Dev.            0.39              0.38              0.5          0.34           0.30          0.34

Ground             Mean                 0.78              2.16              -0.6         -0.39          0.32          0.37
Level/Open
Space              Std. Dev.            0.39              0.38              0.5          0.34           0.30          0.34
                                 Table 3 – Pollutant Export Parameters (Commercial)

5.3.3.5 Water Quality Objectives
The Water Quality Objectives of the receiving waters for the proposed development have been
obtained from State Planning Policy July 2017. The State Planning Policy load reduction targets are
summarised in Table 4 below.


                                                 WATER QUALITY OBJECTIVES


 Total Suspended                                              Total                    Litter/Gross
                               Total Nitrogen
  Solids (TSS) %                                         Phosphorous (TP)              Pollutants %            Oils/Grease
                             (TN) % Reduction
    Reduction                                              % Reduction                  Reduction

                                                                                                          No visible films or
          80                           45                          60                      90
                                                                                                               odours

                                                Table 4 – Water Quality Objectives

5.3.3.6 Treatment Plan
In order to achieve the Water Quality Objectives for the proposed development, it is proposed to use
mechanical treatment method to treat the runoff prior to discharge from the site.

Stormwater runoff from the proposed development will be captured in a new underground pit and pipe
network which will discharge to the proposed combined treatment / detention tank located at the South
Western corner of the carpark.

Treated water and overflow from the proposed combined treatment / detention tank will discharge off
site via a proposed stormwater connection to the existing stormwater pits constructed as part of the
masterplan ROL.

The treatment plan for the proposed development is depicted on MPN Plan 7700-DA.01 attached in
Appendix 3, with MUSIC excerpt below.




Excellence with Economy in Engineering                                                                                          12
l:\7000-7999\7700-7799\7700\reports\31-10-18 stormwater management plan_issue b.docx
Log in to download the original file

Appendix C - Stormwater Management Plan.pdf · 31.5 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.