Original source · versioned page text
Reference Documents - OPW24-0098
Very large file (11.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.
ADG Consulting Pty Ltd
Table of Contents
1 INTRODUCTION 1
1.1 PROPOSED DEVELOPMENT 1
1.2 RELEVANT GUIDELINES 1
1.3 GENERAL ENVIRONMENTAL DUTY 1
1.4 DMP OBJECTIVES 2
1.5 SCOPE OF WORK 2
2 SITE CHARACTERISTICS 3
2.1 PROPERTY DESCRIPTION 3
2.2 SURROUNDING ENVIRONMENT 3
2.3 TOPOGRAPHY 3
2.4 GEOLOGY & SOILS 3
2.5 HYDROGEOLOGY 3
3 PREVIOUS INVESTIGATIONS 4
3.1 PTG CONSULTING 2024 4
3.1.1 SOILS 4
3.1.2 GROUNDWATER 4
3.2 GROUNDWATER QUALITY 4
4 WATER QUALITY OBJECTIVES 6
4.1 RECEIVING ENVIRONMENT 6
4.2 DEVELOPMENT OF WATER QUALITY OBJECTIVES 6
4.3 PROPOSED WATER QUALITY OBJECTIVES 7
5 DEWATERING METHODOLOGY 10
5.1 BASEMENT EXCAVATION AND SHORING 10
5.2 GROUNDWATER EXTRACTION 10
5.3 EXTRACTION/DISCHARGE RATES AND VOLUME 10
5.3.1 DEWATERING EXTRACTION CALCULATION BASED ON SUBSURFACE SOIL PROFILE 10
5.4 DEWATERING DURATION 11
5.5 GROUNDWATER DRAWDOWN 11
5.6 GROUNDWATER TREATMENT 12
5.7 NOMINATED HOLD POINTS 12
6 WATER QUALITY MANAGEMENT 13
6.1 RESPONSIBILITY 13
6.2 OPERATIONAL POLICY 13
6.3 PERFORMANCE CRITERIA 13
6.4 IMPLEMENTATION STRATEGY 13
6.4.1 GROUNDWATER TREATMENT SYSTEMS 13
6.4.2 DEWATERING STRATEGY 14
6.4.3 INITIAL PUMP‐OUT 14
6.5 MONITORING 14
6.5.1 VISUAL MONITORING 14
6.5.2 WATER QUALITY MONITORING 14
6.5.3 MONITORING RESPONSIBILITIES 15
6.6 MAINTENANCE 16
6.7 REPORTING 16
6.8 CONTINGENCIES 17
7 NOISE & ODOUR MANAGEMENT 18
7.1 RESPONSIBILITY 18
7.2 OPERATIONAL POLICY 18
7.3 PERFORMANCE CRITERIA 18
7.4 IMPLEMENTATION STRATEGY 18
7.4.1 NOISE 18
7.4.2 ODOUR 18
7.5 MONITORING 18
ADG1673.24 Dewatering Management Plan_Rev0_12.07.24 Page iii
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.