Project Hazard Risk Management Ozcare Noosa RACF 23-04-2024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy · OPW24/0118
2. PLANNING
2.1 IDENTIFICATION OF HAZARDS AND RISKS
The hazards and risks related to projects undertaken by Woollam will be assessed by the Project Manager or delegate in
conjunction with the HSEQT Manager and recorded in the WHS Management Plan using the WHS Management Plan
Development Procedure for guidance, for each project, in accordance with the WHS Legislation. The WHS Management Plan
will also identify legislative criteria relevant to the hazards and risks.
Project HSE Resourcing will be determined by undertaking an initial Project Health assessment and a risk assessment /
audit of each project monthly, considering a number of relevant factors. The risk assessment will be completed by the
Regional HSE Coordinators for each project in their respective region and recorded on the Project Classification
spreadsheet.
2.2 LEGAL REQUIREMENTS
There is an extensive selection of documents and legal requirements that are available for the development of Woollam
plans, procedures, SWMS and other system documents. Wherever possible the document that offers the most
comprehensive information, the most effective outcome or best industry practice has been chosen to reference. Each code
of practice refers to the state in which it is being referenced. A reference to any document referred to in this document is to
be read as a reference to that document as in force at the time the document is referred to unless express provision is
made to the contrary [WH&S Regulation Section 13]. The following tabled documents represent the legal requirements
relevant to the activities normally undertaken by Woollam. During the Project Start Up Meeting, the relevant Regional HSE
Coordinator will review the table and identify all health and safety legislation, Codes of Practice and Australian Standards
relevant to the scope of works. All identified documents will be included in section 1.3 of the relevant WHS Management Plan
and will be available through the Site Manager in hard copy or on the Woollam intranet, if required.
Queensland WH&S Act 2011 NSW WH&S Act 2017
Queensland WH&S Regulation 2011 NSW WH&S Regulation 2017
Environmental Protection Act and Regulation Induction for Construction Work – National CoP
Electrical Safety Act 2002 (Qld) Hazardous Manual Tasks CoP
Electrical Safety Legislation 2002 (Qld) How to Safely Remove Asbestos CoP
Electrical Safety CoP 2010 – Working near How to Manage and Control Asbestos in the
overhead and underground services (Qld) Workplace CoP
Electrical Safety CoP 2013 – Managing Electrical Work Health and Safety Consultation, Co-operation
Risks in the Workplace (Qld) and Co-ordination CoP
Electrical Safety CoP 2010 – Works (Qld) How to Manage Work Health & Safety Risks CoP
Managing Electrical Risks at the Workplace CoP Managing the Risks of Hazardous Chemicals in the
(NSW) Workplace CoP
Work Near Overhead Power Lines CoP (NSW) Managing Noise & Preventing Hearing Loss CoP
Managing the risk of falls at Workplaces CoP First Aid in the Workplace CoP
Managing the Work Environment & Facilities CoP Managing the Risks of Plant in the Workplace CoP
Confined Spaces CoP Welding Processes CoP
Excavation Work CoP Demolition Work CoP
Formwork CoP (Qld) Safe Design of Structures CoP
Scaffolding CoP 2021 (Qld) Tilt up and Pre-cast Construction CoP (Qld)
OHS Management Manual / 14/02/2024 / Page 9 Approved by - HSEQT Manager
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Project Hazard Risk Management Ozcare Noosa RACF 23-04-2024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy.pdfRelated documentApplication case desk ↗
About this file
- File size
- 550 KB (small file)
- File type
No other editions are linked here.