Council archive · source document
SCG 31030 Stormwater Management Plan · OPW22/0319
Plans and drawings: the text below has words only, no drawings.
Contents 1.0 INTRODUCTION: ........................................................................................................................................3 2.0 EXISTING SITE DESCRIPTION: ................................................................................................................3 3.0 PROPOSED DEVELOPMENT: ...................................................................................................................3 4.0 EXSITING DRAINAGE: ...............................................................................................................................3 4.1 Existing Drainage and Infrastructure: ......................................................................................................3 4.2 LAWFUL POINT OF DISCHARGE: .........................................................................................................4 5.0 STORMWATER QUALITY: .........................................................................................................................4 5.1 Water by Design Assessment:.................................................................................................................4 5.2 CONSTRUCTION PHASE:......................................................................................................................5 5.3 COMPLETED DEVELOPMENT: .............................................................................................................5 6.0 STORMWATER QUANTITY:.......................................................................................................................6 6.1 Rational Method: ......................................................................................................................................6 7.0 FLOODING ..................................................................................................................................................9 8.0 CONCLUSION: ............................................................................................................................................9 SCG Consulting engineers 2 SCG Ref: 31030(SWM) [OCR of page images] Contents 1.0 INTRODUCTION: 0.0... cc ccc cee ceeeesecsesececaecesesoesesesseceeeesseceeseseessesecsesseeesseseesesesoeseseesessesesseceseeseesaees 3 2.0 EXISTING SITE DESCRIPTION: ........ccccccecce cee ce cee ceeceeeeseceeeeceeceeeeseessesecsesseeeseeseeseseesoeseseesessesesseseeeeseeteaes 3 3.0 PROPOSED DEVELOPMENT: .........0ccccccesceccecceeeseeseeeecsecseeecsecoeeessessesecsesseceseesoesesesoeseesesessesesseeeseeseatanes 3 4.0 EXSITING DRAINAGE. .......... eee 4.1 Existing Drainage and Infrastructure. 4.2 5.0 STORMWATER QUALITY: .....ccceccesecceseeesseeecnecseeeceecaeceseessesscecseceeeesseseeeessessesesecseeessesseseseessessesesieeeseesoneats 4 5.1 Water by Design ASSCSSMENKH......cececcecceeceeseteseeeeeeeceeeeaeeaeceeeteeeeeeseeeaeeseeeaeeeeseaeseeseeeeaeseseaesneseeeseeteneeaeeaee 4 5.2 | CONSTRUCTION PHASE... eee te eee teenie teense nesses nena tesee nesses neseseeeseneseeenenenee 5 5.3. COMPLETED DEVELOPMENT: 6.0 STORMWATER QUANTITY:.. 6.1 Rational Method.............00- 7.0 FLOODING oe ceeeccececceceneeseeecseeseeeesecseseesecaeeeceecaeceesecsecacsecsecaeecaesaeeessesaecessecaeeeesecaeceseseesaeeesaecateeseneateaeeesaees 9 8.0 CONCLUSION: 0.0... ceecceeceecececeseeseeeceeeeeeeesecaesecaccaesaceecaeceesessesaceecaecaeeecaecaeecsesaeassecaeeesaecaeeesiesaesaseetaeeateesaeeats 9 SCG Consulting engineers 2 SCG Ref: 31030(SWM)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SCG 31030 Stormwater Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.