Figure 1 – Council Stormwater Drainage adjacent site
4.2 LAWFUL POINT OF DISCHARGE:
The lawful point of discharge is described in Section 3.4 of QUDM 2013. The two point test may be helpful in
assessing whether a lawful point of discharge exists at a particular location. The test consist of being satisfied
that:
1. The location of the discharge is under the lawful control of the Local Government or other statutory
authority from whom permission to discharge has been received. This will include park, drainage or road
reserve, stormwater drainage easement.
2. In discharging to that location, the discharge will not cause an actionable nuisance i.e. a nuisance for
which the current or some future neighbouring proprietor may bring an action or claim for damages arising
out of the nuisance), or environmental or property damage.
The proposed development will be connected to the existing Council Stormwater pit opposite the site in Toolar
Street.
5.0 STORMWATER QUALITY:
5.1 Water by Design Assessment:
The following factors have been identified as potential contributors which can adversely effect stormwater quality
draining from the site:-
• Silt and sediment erosion
• Gross Pollutants
• Nutrient runoff
The proposed development involves a land area less than the trigger value of 2500m2 for stormwater quality
measures as required in the Queensland State Planning Policy
SCG Consulting engineers 4 SCG Ref: 31030(SWM)
[OCR of page images]
Figure 1 — Council Stormwater Drainage adjacent site
4.2 LAWFUL POINT OF DISCHARGE:
The lawful point of discharge is described in Section 3.4 of QUDM 2013. The two point test may be helpful in
assessing whether a lawful point of discharge exists at a particular location. The test consist of being satisfied
that:
1. The location of the discharge is under the lawful control of the Local Government or other statutory
authority from whom permission to discharge has been received. This will include park, drainage or road
reserve, stormwater drainage easement.
2. In discharging to that location, the discharge will not cause an actionable nuisance i.e. a nuisance for
which the current or some future neighbouring proprietor may bring an action or claim for damages arising
out of the nuisance), or environmental or property damage.
The proposed development will be connected to the existing Council Stormwater pit opposite the site in Toolar
Street.
5.0 STORMWATER QUALITY:
5.1 Water by Design Assessment:
The following factors have been identified as potential contributors which can adversely effect stormwater quality
draining from the site:-
° Silt and sediment erosion
e Gross Pollutants
° Nutrient runoff
The proposed development involves a land area less than the trigger value of 2500m? for stormwater quality
measures as required in the Queensland State Planning Policy
SCG Consulting engineers 4 SCG Ref: 31030(SWM)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SCG 31030 Stormwater Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.