GENERAL COMMITTEE MEETING AGENDA                                                     15 DECEMBER 2014


In relation to the request to make a change to the existing approval, Council decided to:

A.   Change Condition 114 to read:
     Contributions Towards Council Infrastructure
     114. Monetary contributions shall be paid to Council towards the cost of providing and/or
           upgrading various infrastructure at the rates applicable at the time of payment. An
           estimate only of the contribution amounts under the current Council policies and
           requirements is outlined in the table below:
                                                                Stage 1            Stage 2            Stage 3
            Contribution Required For:                         Amount              Amount             Amount
                                                             (Lots 6,7 & 8)     (Lots 10 to 26)     (Lots 9 & 27)
            PSP17 – Water Supply Headworks
                                                                    $ 25,135         $ 191,289          $ 22,264
            Contributions
            PSP16 – Sewerage Headworks
                                                                    $ 11,253         $ 85,641            $ 9,968
            Contributions
            PSP12 – Public Open Space Contributions
                                                                    $ 8,630          $ 65,665            $ 7,643
            (Park)
            PSP20 – Pathway Trunk Network
                                                                    $ 13,179         $ 100,281          $ 11,672
            Contributions
            Roadworks Contributions (including public
                                                                    $ 28,000         $ 213,506          $ 24,798
            transport)
            TOTAL Contribution Amount =                             $ 86,197         $ 656,382          $ 76,345

            These amounts are subject to variations in the Consumer Price Index, All Groups Brisbane
            from September 2014 until the date of payment.

           All contributions must be paid prior to Council endorsement of the plan of survey for
           the applicable stage.
B.   Change Advisory Note 1 to read:
     1.    The applicant is advised that development contributions and infrastructure charges
           applicable to this development approval have been based on the following estimates
           for Uses Class/ Uses and applicable quantities in accordance with the approved
           plan:-
                 Existing
                                                            Approved Development
               Development

              Use                                                             Quantity
                                   Use Class
             Class    Quantity                        Stage 1              Stage 2                  Stage 3
                                     / Use
             / Use                                 (Lots 6,7 & 8)       (Lots 10 to 26)           (Lots 9 & 27)
                     One           Industrial
                                                                        17 x Industrial
            Vacant   Vacant        Business      3 x Industrial Lots                         2 x Industrial Lots
                                                                             Lots
                     Allotment     Type 2
            Water & Sewerage Headworks
                                                                         38,578 m2 lot
            contributions based on the lot       5,069 m2 lot area                           4,490 m2 lot area
                                                                             area
            areas per the approved plan =
            Open Space, Pathway &
            Roadworks contributions based
                                                   2,028 m2 gfa         15,431 m2 gfa             1,796 m2 gfa
            on 40% site cover of the lots per
            the approved plan =
            Note: Lots 50, 100, 101 & 102 are not current developable lots and have not been subjected to
            infrastructure contributions/charges. Nil infrastructure contributions/charges discounts (credits)
            are available should future development occur on these lots.



                                                                                             Page 16 of 36
Log in to download the original file

2014-12-15 General Committee Agenda(PDF, 3MB).pdf · 3.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗