GENERAL COMMITTEE MEETING AGENDA 15 DECEMBER 2014
In relation to the request to make a change to the existing approval, Council decided to:
A. Change Condition 114 to read:
Contributions Towards Council Infrastructure
114. Monetary contributions shall be paid to Council towards the cost of providing and/or
upgrading various infrastructure at the rates applicable at the time of payment. An
estimate only of the contribution amounts under the current Council policies and
requirements is outlined in the table below:
Stage 1 Stage 2 Stage 3
Contribution Required For: Amount Amount Amount
(Lots 6,7 & 8) (Lots 10 to 26) (Lots 9 & 27)
PSP17 – Water Supply Headworks
$ 25,135 $ 191,289 $ 22,264
Contributions
PSP16 – Sewerage Headworks
$ 11,253 $ 85,641 $ 9,968
Contributions
PSP12 – Public Open Space Contributions
$ 8,630 $ 65,665 $ 7,643
(Park)
PSP20 – Pathway Trunk Network
$ 13,179 $ 100,281 $ 11,672
Contributions
Roadworks Contributions (including public
$ 28,000 $ 213,506 $ 24,798
transport)
TOTAL Contribution Amount = $ 86,197 $ 656,382 $ 76,345
These amounts are subject to variations in the Consumer Price Index, All Groups Brisbane
from September 2014 until the date of payment.
All contributions must be paid prior to Council endorsement of the plan of survey for
the applicable stage.
B. Change Advisory Note 1 to read:
1. The applicant is advised that development contributions and infrastructure charges
applicable to this development approval have been based on the following estimates
for Uses Class/ Uses and applicable quantities in accordance with the approved
plan:-
Existing
Approved Development
Development
Use Quantity
Use Class
Class Quantity Stage 1 Stage 2 Stage 3
/ Use
/ Use (Lots 6,7 & 8) (Lots 10 to 26) (Lots 9 & 27)
One Industrial
17 x Industrial
Vacant Vacant Business 3 x Industrial Lots 2 x Industrial Lots
Lots
Allotment Type 2
Water & Sewerage Headworks
38,578 m2 lot
contributions based on the lot 5,069 m2 lot area 4,490 m2 lot area
area
areas per the approved plan =
Open Space, Pathway &
Roadworks contributions based
2,028 m2 gfa 15,431 m2 gfa 1,796 m2 gfa
on 40% site cover of the lots per
the approved plan =
Note: Lots 50, 100, 101 & 102 are not current developable lots and have not been subjected to
infrastructure contributions/charges. Nil infrastructure contributions/charges discounts (credits)
are available should future development occur on these lots.
Page 16 of 36
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.