Minor Change Existing Approval MCU19 0047.01
Officer: Maxwell Potter Direct Telephone: 07 5329 6500 Our Reference: MCU19/0047.01 3 August 2021 WD Grove, R Purvis 145 Musa Vale Rd COOROY QLD 4563 [email protected] Dear Sir/Madam, Decision Notice – Minor Change Planning Act 2016 I refer to your application received on 30 June 2021, requesting a minor change to an existing development approval. Council decided your requested changes. Details of the decision are as follows: APPLICATION details Application No: MCU19/0047.01 Street address: 145 Musa Vale Rd Cooroy Qld 4563 Real property description: Lot 2 SP 119744, Lot 2 SP 269273 Planning Scheme: Noosa Plan 2020 (25 September 2020) Decision details The following type of approval was issued on 29 July 2019. Development Permit for a Material Change of Use - Visitor Accommodation - Type 3 Rural In relation to the request to make a minor change to the existing approval, Council on 28 July 2021, decided to approve the requested changes. The changes are detailed below. A. Approve the change. B. Amend conditions 2, 3 & 11. C. Delete conditions 12 & 13. currency period of approval The currency period for this development approval is stated in the conditions below. assessment manager conditions PLANNING When Conditions must be Complied With Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to the use commencing, and then compliance maintained at all times while the use continues. Approved Plans Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date DA-101 E Site Plan (Annotated by Council) 30/04/2019 DA-111 B Existing house – Floor Plan 13/03/2019 DA-121 C Existing house – Elevations 15/04/2019 Performance Bond Security in the form of a cash bond or trading bank guarantee to the sum of $2,500 must be submitted to Council, to secure performance of all conditions of this approval, prior to the issue of a Development Permit for Operational Works. The cash bond or trading bank guarantee will be returned on performance of the conditions of approval less any costs incurred by Council in respect of enforcing performance of this permit. Council reserves the right to call upon the bond or guaranteed sum to effect compliance with conditions. Nature and Extent of Approved Use The cabin must be used for short term visitor accommodation only. The cabin must not be used for permanent accommodation. Currency Period The Currency Period for this development approval lapses if the use has not happened by 29 July 2025, unless an application to extend the currency period is approved by Council. Water Supply The development must be provided with a potable water supply connected to each cabin. The storage capacity of the potable water supply must be a minimum of 4000 litres per guest cabin. Waste Water Treatment and Disposal The development must be provided with an on-site waste water treatment and effluent disposal system having a capacity sufficient for the use*. *(Refer to Advisory Note) Bushfire Management The development must be carried out in accordance with section 4 of the Wollemi Eco-Logical report listed within this Decision Notice. A copy of the Wollemi Eco-Logical report listed within this Decision Notice must be provided to the nearest fire authority. Certification must be submitted to Council, prior to the commencement of use, from a qualified person* which certifies that the development has been constructed in accordance with the bushfire management conditions of this Decision Notice. *(Refer to Advisory Note) Engineering Driveway A compacted gravel access driveway must be provided from the road formation to the existing double carport near the entrance to the site. The access must be maintained to a standard suitable for the proposed use. Deleted. Deleted. To ensure traffic safety, vehicles access to and from this property must be from the constructed driveway in a forward gear only. Pavement design for privately owned works must be undertaken in accordance with the relevant standards. Structural integrity of the driveway and car park areas will remain the responsibility of the property owner/developer. referral agencies Not applicable. advisory notes The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions: PLANNING Aboriginal Cultural Heritage Act 2003 There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act). The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries out an activity must take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value of Aboriginal cultural heritage. You should contact the Cultural Heritage Unit on 07 3247 6212 to discuss any obligations under the ACH Act. Development Compliance Inspection Prior to the commencement of the use, please contact Council's DA Planning Section to arrange a Development Compliance Inspection. Charges This Development Permit will trigger an “Infrastructure Charge Notice” to be issued in accordance with Council’s “Charges Resolution” made pursuant to the planning legislation and regulations current at the time of issue. Qualified Person For the purpose of preparing a Bushfire Management Plan, and for certifying compliance with the bushfire requirements of this Decision Notice, a qualified person is considered to be an ecologist with a minimum of 3 years current experience in the field of bushfire assessment and management. Waste Water Treatment and Disposal System The establishment of a waste water treatment and disposal system for the site requires a Compliance Permit to be obtained from Council under the Plumbing and Drainage Act 2002. The system must be designed in accordance with the Queensland Plumbing and Wastewater Code (Department of State Development and Infrastructure & Planning, 2007) and Australian Standard AS/NZS1547: 2000 “On-site Domestic Wastewater Management” or an alternative solution approved through Council’s Building and Plumbing branch. Where a development exceeds the accommodation or use of 21 or more equivalent persons a copy of an Operator’s Licence from The Department of Environment & Heritage Protection will also be required. Sustainability In line with Noosa Council’s Corporate Plan, Council seeks to encourage sustainable building design for residential and commercial development. Council encourages the use of sustainable building materials, energy efficient fittings, solar hot water, photovoltaic systems (including the use of inverter/charges), water saving devices and rainwater harvesting. For further information go to http://www.noosa.qld.gov.au/sustainable-homes Infrastructure Charges This Development Permit will trigger an “Infrastructure Charge Notice” to be issued in accordance with Council’s “Charges Resolution” made pursuant to the planning legislation and regulations current at the time of issue. All developments and/or changes to existing developments may require payment of “Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution” made pursuant to the planning legislation and regulations current at the time of issue. property notes Not applicable. variation approval details Not applicable. further development permits required< Type of Development Permit Required Subject of the required Development Permit Development Permit for Operational Works Access and Carparking submissions There were no properly made submissions about the application. rights of appeal You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Planning Act 2016 is attached. During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a negotiated decision notice will be issued. Only one negotiated decision notice may be given. other details If you wish to obtain more information about the decision, electronic copies are available on line at www.noosa.qld.gov.au or at Council Offices. Yours faithfully, Maxwell Potter Assistant Development Planner Enc: Appeal Rights Approved Plans/Documents cc. Unitywater DECISION NOTICE HISTORY Original Decision Notice – 29 July 2019. Decision Notice - Minor – MCU19/0047.01 – 28 July 2021 with an amendment to conditions 2, 3 and 11, delete conditions 12 and 13 Appeal Rights PLANNING ACT 2016 & PLANNING REGULATION 2017 Chapter 6 Dispute resolution Part 1 Appeal rights 229 Appeals to tribunal or P&E Court (1) Schedule 1 of the Planning Act 2016 states – (a) Matters that may be appealed to – (i) either a tribunal or the P&E Court; or (ii) only a tribunal; or (iii) only the P&E Court; and (b) The person- (i) who may appeal a matter (the appellant); and (ii) who is a respondent in an appeal of the matter; and (iii) who is a co-respondent in an appeal of the matter; and (iv) who may elect to be a co-respondent in an appeal of the matter. (2) An appellant may start an appeal within the appeal period. (3) The appeal period is – (a) for an appeal by a building advisory agency – 10 business days after a decision notice for the decision is given to the agency; or (b) for an appeal against a deemed refusal – at any time after the deemed refusal happens; or (c) for an appeal against a decision of the Minister, under chapter 7, part 4, to register premises or to renew the registration of premises – 20 business days after a notice us published under section 269(3)(a) or (4); or (d) for an appeal against an infrastructure charges notice – 20 business days after the infrastructure charges notice is given to the person; or (e) for an appeal about a deemed approval of a development application for which a decision notice has not been given – 30 business days after the applicant gives the deemed approval notice to the assessment manager; or (f) for any other appeal – 20 business days after a notice of the decision for the matter, including an enforcement notice, is given to the person. Note – See the P&E Court Act for the court’s power to extend the appeal period. (4) Each respondent and co-respondent for an appeal may be heard in the appeal. (5) If an appeal is only about a referral agency’s response, the assessment manager may apply to the tribunal or P&E Court to withdraw from the appeal. (6) To remove any doubt. It is declared that an appeal against an infrastructure charges notice must not be about- (a) the adopted charge itself; or (b) for a decision about an offset or refund- (i) the establishment cost of trunk infrastructure identified in a LGIP; or (ii) the cost of infrastructure decided using the method included in the local government’s charges resolution. 230 Notice of appeal (1) An appellant starts an appeal by lodging, with the registrar of the tribunal or P&E Court, a notice of appeal that- (a) is in the approved form; and (b) succinctly states the grounds of the appeal. (2) The notice of appeal must be accompanied by the required fee. (3) The appellant or, for an appeal to a tribunal, the registrar must, within the service period, give a copy of the notice of appeal to – (a) the respondent for the appeal; and (b) each co-respondent for the appeal; and (c) for an appeal about a development application under schedule 1, table 1, item 1 – each principal submitter for the development application; and (d) for and appeal about a change application under schedule 1, table 1, item 2 – each principal submitter for the change application; and (e) each person who may elect to become a co-respondent for the appeal, other than an eligible submitter who is not a principal submitter in an appeal under paragraph (c) or (d); and (f) for an appeal to the P&E Court – the chief executive; and (g) for an appeal to a tribunal under another Act – any other person who the registrar considers appropriate. (4) The service period is – (a) if a submitter or advice agency started the appeal in the P&E Court – 2 business days after the appeal has started; or (b) otherwise – 10 business days after the appeal is started. (5) A notice of appeal given to a person who may elect to be a co-respondent must state the effect of subsection (6). (6) A person elects to be a co-respondent by filing a notice of election, in the approved form, within 10 business days after the notice of appeal is given to the person. 231 Other appeals (1) Subject to this chapter, schedule 1 and the P&E Court Act, unless the Supreme Court decides a decision or other matter under this Act is affected by jurisdictional error, the decision or matter is non-appealable. (2) The Judicial Review Act 1991, part 5 applies to the decision or matter to the extent it is affected by jurisdictional error. (3) A person who, but for subsection (1) could have made an application under the Judicial Review Act 1991 in relation to the decision or matter, may apply under part 4 of that Act for a statement of reasons in relation to the decision or matter. (4) In this section – decision includes- (a) conduct engaged in for the purpose of making a decision; and (b) other conduct that relates to the making of a decision; and (c) the making of a decision or failure to make a decision; and (d) a purported decision; and (e) a deemed refusal. non-appealable, for a decision or matter, means the decision or matter- (a) is final and conclusive; and (b) may not be challenged, appealed against, reviewed, quashed, set aside or called into question in any other way under the Judicial Review Act 1991 or otherwise, whether by the Supreme Court, another court, a tribunal or another entity; and (c) is not subject to any declaratory, injunctive or other order of the Supreme Court, another court, a tribunal or another entity on any ground. 232 Rules of the P&E Court (1) A person who is appealing to the P&E Court must comply with the rules of the court that apply to the appeal. (2) However, the P&E Court may hear and decide an appeal even if the person has not complied with the rules of the P&E Court [word/footer2.xml] Page 5 of 6 [word/footer3.xml] PO Box 141 P. (07) 5329 6500 [email protected] TEWANTIN QLD 4565 F. (07) 5329 6501 www.noosa.qld.gov.au Page 1 of 6 [word/footer4.xml] Page 2 of 3 [word/header4.xml] 3 [Attachment: image3.png (image text)] ee) NOOSA COUNCIL
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.