Skip to the record
For the highest quality transcripts.

Council archive · source document

Request to Change Current Application · OPW11/0023

of 66

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (10.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.

                                                                                                                 ^
                                                                                                   2equUot -to ck.
                                                             vJ04cc C Ret;secI
                                                                                                                                       rzppU
                              Integrated Development Assessment Syst,,-!                                  oPw I I lOog 3
    Building or operational work assessable against
    a planning scheme-IDAS form 6                                                                                               0
(Sustainable PlanningAct 2009 version i.o effective 18 December 2009)



This form must be completed for development applications for building works or operational work assessable against a
planning scheme.


You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms wit h0 -attrrecessar
information and documentation will result in your application not being                       per y ma a application.

                                                                                             Development Counter
For all development applications, you must:
    •        complete Application details-IDAS form i
                                                                                                          7,3 MA? 2 411
    •        complete any other forms relevant to your application
•            provide any mandatory supporting information identified on the for            s as bein r7qu rek^^:jcfigpr iarr                      our
             application.
Attach extra pages if there is insufficient space on this form.


All terms used on this form have the meaning given in the Sustainable PlanningAct2009 or the Sustainable Planning
Regulation 2009.


This form can also be used for development on strategic port land under the Transport Infrastructure Act 1994.


This form can also be completed online using Smart eDA at www.smarteda.g(d.gov.au

i. What is the nature of the work that requires assessment against a planning scheme? (tick applicable box/es)

                                                                                                                 SCRC CORRESPONDENCE
I        I   UUIIU IIIYJ WV1r,-1V111 jJlC lC lGU1C M   L^j    VjJCItlUVlldl WVIR-1U111 J/IC IC LAUIC L)        IIIIIIII IIII VIII VIII VIII IIIIIIIIIIIIIIIIIIIIIII




Table A                                                                                                                     B0346149
         What is the nature of the building work made assessable in the planning scheme (e.g. building, repairing, altering,
         underpinning, moving or demolishing a building)?




         What type of approval is being sought? (if you have indicated multiple works in the above question, please use an
         attachment to this form to detail each approval request)

                 development permit                        preliminary approval
             q                                         q
         Are there any current approvals associated with this application? (e.g. material change of use)

         List of approval reference/s                                              Date approved              Date approval lapses




        Department of Infrastructure and Planning                             QpIan                                                 Queensland
                                                                                                                           `` GnvPrnmPnt
Full text of the other 65 pages

Page 2

Table B
     What is the nature of the operational work made assessable in the planning scheme? (tick applicable box/es)

                d     oad works                     Ef stormwater        El water infrastructure


                d drainage works                    2r earthworks        El sewerage infrastructure


                      landscaping                         signage                 clearing vegetation under the planning scheme
                                                    q


                      other-provide details
                q


      What type of approval is being sought? (if you have indicated multiple works in the above question, please use an
      attachment to this form to detail each approval request)

              development permit            F1 preliminary approval              F] both-specify below
      q




      Is the operational work necessary to acilitate the creation of new lots? (e.g. subdivision)

              No        F-]       Yes-specify the number of lots being created
       IVI


      Are there any current approvals associated with this application? (e.g. material change of use)

              No        I   ,,I   Yes-provide details below


      List of approval reference/s                                                Date approved     Date approval lapses

        Dec'-s:oL       NAce             20o?/256                                    Sa 2c



2. What is the dollar value of the proposed building work? (inc GST, materials and labour)


3. Confirm that the following mandatory supporting information accompanies this application



                                                                                        Confirmation of      Method of
                                                                                        lodgement            lodgement

All applications for operational works

site plans drawn to scale which show the following:                                          confirmed
•   the location and site area of the land to which the application relates
    (relevant land)
•   the north point
• the boundaries of the relevant land
• the allotment layout showing existing lots, any proposed lots (including the
    dimensions of those lots), existing or proposed road reserves, building
    envelopes and existing or proposed open space (note: numbering is required
    for all lots)



                                                                              sable again ,'--/DAS form 6
                                                                                        Version i. 018 December ZOOS

Page 3

•   any existing or proposed easements on the relevant land and their function
•   any access limitation strips
•   all existing and proposed roads and access points on the relevant land

a statement about how the proposed development addresses the local
                                                                                        q confirmed
government's planning schemes and any other planning documents relevant to
the application

Applications for operational works involving earthworks (filling and excavating)

drawings showing:                                                                          confirmed
•   existing and proposed contours
•   areas to be cut and filled
•   the location and level of any permanent survey marks or reference stations
    used as datum for the works
•   the location of any proposed retaining walls on the relevant land and their
    height
•   the defined flood level (if applicable)
•   the defined fill level (if applicable)
Applications for operational works involving roadworks
drawings showing:                                                                          confirmed
•   existing and proposed contours
• the centreline or construction line showing chainages, bearings, offsets if the
    construction line is not the centreline of the road and all intersection points
• information for each curve including tangent point chainages and offsets,
    curve radii, arc length, tangent length, superelevation (if applicable) and
    curve widening (if applicable)
•   kerb lines including kerb radii (where not parallel to centreline) and tangent
    point changes (where not parallel to centreline)
•   edge of pavement where kerb is not constructed
•   position and extent of channelisation
•   location and details of all traffic signs, guideposts, guardrail and other street
    furniture
•   pavement markings including details on raised pavement markers
•   catchpit, manhole and pipeline locations
•   drainage details (if applicable)
•   cross road drainage culverts (if applicable)
•   concrete footpaths and cycle paths
•   location and details for access points, ramps and invert crossings
•   changes in surfacing material




                                                                                                       heme-/DASform 6
                                                                                           Version i. o i8 December 20OR

Page 4

     -1F-1r-1
Applications for operational works involving stormwater drainage
drawings showing:                                                                     confirmed
•   existing and proposed contours
•   drainage locations, diameters and class of pipe, open drains and easements
•   manhole location, chainage and offset or co-ordinates and inlet and outlet
    invert levels
•   inlet pit locations, chainage and offset or co-ordinates and invert and kerb
    levels
Applications for operational works involving water reticulation
drawings showing:                                                                     confirmed
•   kerb lines or edge of pavement where kerb is not constructed
•   location and levels of other utility services where affected by water
    reticulation works
•   pipe diameter, type of pipe and pipe alignment
•   water main alignments
•   water supply pump station details (if applicable)
•   minor reservoir details (if applicable)
•   conduits
•   location of valves and fire hydrants
•   location of house connections (if applicable)
•   location of bench marks and reference pegs
Applications for operational works involving sewerage reticulation
drawings showing:
                                                                                   n confirmed
•   location of all existing and proposed services
•   location of all existing and proposed sewer lines and manhole locations
•   location of all house connection branches
•   kerb lines or edge of pavement where kerb is not constructed
•   chainages
•   design sewer invert levels
•   design top of manhole levels
•   type of manhole and manhole cover
•   pipe diameter, type of pipe and pipe alignment
•   location of house connections (if applicable)
•   sewer pump station details (if applicable)
Applications for operational works involving street lighting

drawings showing:
                                                                                   q confirmed
•   location of all light poles and service conduits
•   location of all other cross road conduits
•   type of wattage and lighting
•   any traffic calming devices
•   additional plans for roundabouts and major roads (if applicable)
•   details of any variations to normal alignment
•   details of lighting levels




                                                                                                    .,I '•--IDASform6
                                                                                      Version i. a 18 December 2oo9

Page 5

    Applications for operational works involving public utility services
    drawings showing:
                                                                                             confirmed
    •   any existing light poles and power poles
    •   any existing underground services
    •   details of proposed services
    •   alternation to existing services
    Applications for operational works involving landscaping works

    drawings showing:
                                                                                         9confirmed
    • the location of proposed plant species
    •   a plant schedule indicating common and botanical names, pot sizes and
        numbers of plants
    •   planting bed preparation details including topsoil depth, subgrade
        preparation, mulch type and depth, type of turf, pebble, paving and garden
        edge
    • the location and type of any existing trees to be retained
    •   construction details of planter boxes, retaining walls and fences
    •   the proposed maintenance period
    •   irrigation system details


Notes for completing this form:
•       This form can also be used for development applications for building works or operational works assessable against
        the land use plan for Cairns airport land or Mackay airport land. Whenever a planning scheme is mentioned, take it to
        mean the land use plan for the airport land.


Privacy-please refer to your assessment manager for further details on the use of information recorded in this
form.



OFFICE USE ONLY


    Date received                                            Reference numbers




The SustainablePlanningAct2009is administered by the Department of Infrastructure and Planning. This form and all other
required application materials should be sent to your assessment manager and any referral agencies.



                                                                                             )lanrr         - IDASform6
                                                                                             Version i.o 18 December2009

Page 6

---   r   m   -   w   i




                      00
                      O
                      m
                      m
                      z




                           r
                           r
                           m


[OCR of page images]
 

 

eae ke BUNNINGS NOOSAVILLE
ete ae F BIORETENTION AND GROSS POLLUTANT
TRAP MAINTENANCE PLAN

5 : nih Me
perm a me tral 8 rat

i
gate

ENGINEERS, SURVEYORS & PLANNERS

 

 

 

Page 7

    BIORETENTION BASIN & GROSS POLLUTANT TRAP
    PURPOSES FUNCTION
    The bioretention basins installed at Bunnings Noosaville provides treatment of stormwater runoff as
    well as improve the landscape amenity. The gross pollutant trap provides for primary treatment of
    stormwater runoff prior to it discharging into the bioretention basin in order to capture sediment and
    other gross pollutants.




    The purpose of this bioretention basin maintenance plan is to detail the operational phase
    maintenance requirements of the bioretention basins installed at the proposed Bunnings Warehouse
    at the corner of Gateway Drive and Noosa-Eumundi Dve. Routine maintenance of the bioretention
    basins shall be undertaken by Bunnings to ensure to efficient operation of the stormwater quality
    treatment train.



I   BIORETENTENTION BASIN
    PLANT ESTABLISHMENT

    Establishment of vegetation within the bioretention basin is of critical importance as vegetation helps
    maintain porosity of the filter media in the basin and removal of excess nutrients (considered a
    pollutant at the high levels typical of urban stormwater runoff). The plant establishment period within
    the first two years is the most intensive maintenance period with watering, weeding, and possible
    replanting to be carried out. The following schedule for watering of plants should be followed:



I   •

    •
            Week 1-2

            Week 3-6
                                      3 visits/week

                                      2 visits/week

    •       Week 7-12                 1 visit/week

    •       After Week 12     As required during dry spells




    REGULAR MAINTENANCE

    The Water Sensative Urban Design Technical Design guidelines for South East Queensland describe

I   the following typical maintenance requirements:




        •    Routine inspection of the bioretention basin profile to identify any areas of obvious increased
            sediment deposition, scouring from storm flows, rill erosion of the batters from lateral inflows,

Page 8

    •   Routine inspection of inflow systems, overflow pits and under-drains to identify and clean any
        areas of scour, litter build up or blockages.
    •   Removal of sediment where it is smothering the bioretention basin vegetation.
    •   Repairing any damage to the profile resulting from scour, rill erosion or vehicle damage by
        replacement of appropriate fill (to match onsite soils) and revegetating.
    •   Tilling of the bioretention basin surface, or removal of the surface layer, if there is evidence of
        clogging.
    •   Regular watering/irrigation of vegetation until plants are established and actively growing.
    •   Removal and management of invasive weeds (herbicides should not be used).
    •   Removal of plants that have died and replacement with plants of equivalent size and species.
    •   Pruning to remove dead or diseased vegetation material to stimulate growth.
    •   Vegetation pest monitoring and control.




A maintenance checklist is to be completed for each scheduled maintenance and kept in a
maintenance log. See Appendix A for a copy of the maintenance checklist.




GROSS POLLUTANT TRAPS


The gross pollutant traps require monthly visual inspection of the collection chamber for the first year
to gain an understanding of seasonal variations in pollutant loads. The chamber should be emptied
via eductor truck whenever it is over three quarters full in accordance with the manufacturers
recommendations.      After the first year the inspection frequency may be reduced to quarterly and
emptying scheduled in accordance with observations made in the first year of operation, but at least
every 6 months.

Page 9

    APPENDIX A - MAINTENANCE CHECKLIST




I


[OCR of page images]
APPENDIX A — MAINTENANCE CHECKLIST

 

 

Page 10

REGULAR INSPECTION & MAINTENANCE

Location:               Bioretention Basin


Site Visit Date:                                                     Site Visit By:


Weather:


                         Routine Inspection                                q          Complete section 1 (below)
Purpose of Site Visit

                         Routine Maintenance                               q          Complete sections 1 and 2 (below)


NOTE: Where maintenance is required ('yes' in section 2), details should be recorded in the `Additional Comments' section at the end of this document.

    1.   Filter media

                                                                                        Section 1            Section 2
*In addition to regular inspections, it is recommended that inspection for            Maintenance           Maintenance
damage and blockage is made after significant rainfall events that might               required?            Performed?
occur once or twice a year.                                                                                                Comments/Rectification Required
                                                                                      Yes       No        Yes         No
Filter media (CIRCLE - pooling water / accumulation of silt & clay I scour /
                                                                                      q             q      q          q
holes I sediment build up)

Litter (CIRCLE- large debris / accumulated vegetation / anthropogenic)                q             q      q          q

    2.   Vegetation

Vegetation health (CIRCLE - Signs of disease I pests / poor growth)                   q             q       q         q

Vegetation densities (CIRCLE - low densities - infill planting required)              q             q       q         q

Build up of organic matter, leaf litter (CIRCLE- requires removal)                    q             q       q         q

Page 11

Weeds (CIRCLE - isolated plants / infestation)
                                                                                                       q             q   q         q
(SPECIES- ..........................................................................................

      3.   Pits, pipes and inflow areas

                                                                                                         Section 2         Section 3
                                                                                                       Maintenance       Maintenance
                                                                                                        required?        Performed?

                                                                                                       Yes       No      Yes       No   Comments/Rectification Required

Perforated pipes (CIRCLE - full blockage / partial blockage / damage)                                  q             q   q         q

Inflow areas (CIRCLE - scour / excessive sediment deposition / litter
                                                                                                       q             q   q         q
blockage)

Over- flow grates (CIRCLE - damage / scour / blockage)                                                 q             q   q         q

Pits (CIRCLE - poor general integrity I sediment build up / littler /
blockage)                                                                                              q             q   q         q
Other stormwater pipes and junction pits (CIRCLE - poor general integrity
                                                                                                       q             q   q         q
/ sediment build up / litter / blockage
      4.   Additional Comments

Page 12

               BUNNINGS WAREHOUSE, NOOSAVILLE

n              SURFACE WATER MANAGEMENT PLAN



    REF NO.:        4400-02-CE

    AUTHOR:         GLENN MANSELL, TGM GROUP PTY. LTD.

    DATE:           MARCH 2011




     ENGINEERS, SURVEYORS & PLANNERS

Page 13

            DOCUMENT STATUS AND HISTORY




    ISSUE   REV.   ISSUED TO        QTY      DATE        REVIEWED

    DRAFT    1     Sunshine Coast       1   16/11/10   P Tadgell
                      Regional
                      Council

    FINAL    2     Sunshine Coast       1   20/01/11
                      Regional
                      Council




I



                                    2

Page 14

                                CONTENTS


    TITLE                                             PAG E


I   1.0

    2.0
            EXECUTIVE SUMMARY

            WATER QUALITY
                                                              4

                                                              4
I           2.1     RAINFALL DATA                             4


            2.2     RUNOFF VOLUMES AND FLOWS                  5

            2.2.1   DETENTION BASIN                           5

            2.2.2   MODEL CORRELATION                         6

    3.0     RUNOFF QUALITY                                    7

            3.1     MODELLING METHODOLOGY AND INPUT           7

            3.2     TREATMENT TRAIN AND METHODS               8

            3.3     SUB-CATCHMENT AREAS                       8

            3.3.1   VEGETATED SWALES                          8

a           3.3.2   BIORETENTION CELL                         9

                                                              10
            3.3.4   RAINWATER TANKS

            3.4     MUSIC MODELLING RESULTS                   10

    4.0     IMPACTS ON RECEIVING WATERWAYS                    10

    APPENDIX A - CONCEPTUAL SURFACE WATER MANAGEMENT LAYOUT

                      DESIGN

    APPENDIX B - CARDNO SURFACE WATER MANAGEMENT PLAN

    APPENDIX C- DRAINS MODEL DATA AND RESULTS




                                        3



I

Page 15

         1.0       EXECUTIVE SUMMARY


         TGM Group have been engaged by H Troon to prepare the surface water management plan for the
         proposed Bunnings Warehouse development on the corner of Eumundi-Noosa Rd and Gateway Dve,
         Noosaville. We are also required to prepare the runoff quality modelling and design of treatment
         measures to meet the requirements of the MUSIC Modelling Guidelines.

I        This report will demonstrate that the minimum runoff quality objectives can be met and exceeded


I        by the proposed stormwater treatment and harvesting measures in summary as follows;

               •   105kL capacity rainwater tank used for irrigation and toilet flushing,
               •   Bioretention cell with an extended depth of 0.1m and mean area of 615m2,
               •   Gross pollutant traps on most inlets to the bioretention basin,



I        The following modelling results were achieved using MUSIC:

                                                       Residual        Residual    Reduction                 % Reduction
                                                        Load             Load      Target %                  (SOmm/hr)*
                                        Source          (200          (SOmm/hr)                % Reduction
     arameter                            Load          mm/hr)                                  (200mm/hr)*
    Flow (ML/yr)                            27.5           26.3             26.3         NA            4.2           4.2
    Total Suspended Solids (kg/yr)          6660            469              582          80            93          91.3
    Total Phosphorus (kg/yr)                23.1           4.69             4.51          60          79.6          80.4
    Total Nitrogen (kg/yr)                  86.2   _       44.9             45.8          45          47.9          45.8
    Gross Pollutants (kg/yr)              627         0.0         0.0        90              100                     100
         * Relative results for hydraulic conductivity of 50mm/hour and 200mm/hr for the filter media in
         bioretention cell.




         2.0       WATER QUANTITY


         2.1       Rainfall Data

         The development has not changed location and as such no change to rainfall data is necessary.
         However, for detention basin calculations rainfall hyetographs were used to simulate real rainfall
         events in DRAINS.




                                                                  4

Page 16

    2.2        Runoff Volumes & Flows

    The site has changed size and layout. The total development site area is approximately 2.32 Ha. The
    development site and amount of impervious area have significantly reduced in size, thus runoff
    volumes have significantly reduced compared to those calculated by Cardno in the original report.
    The new areas are as follows;




            Surface Type          Original Areas           Proposed Areas (TGM
                                 (Cardno Report)                  Report)

                                         (Ha)                         (Ha)



    Roof                                0.7884                       0.667

    Impervious Ground                   1.325                        1.20
    Surface

    Pervious Areas                      0.352                        0.456

I
    TGM note that the CARDNO report calculated runoff from the site layout prior to this development
    using RAFTS and it then compared to the result calculated using the rational method. Results of the
    comparison between the RAFTS and rational methodologies indicated that runoff flow rates were

I   close and therefore it is expected that a pro-rata adjustment of those flows for the new site areas
    will also give acceptable results (i.e. existing discharge calculations adjusted by a factor of
    2.327Ha/2.7543Ha).




    DRAINS uses rainfall hyetographs from Australian Rainfall & Runoff to simulate actual rainfall events.
    The hyetographs mimic the variation in rainfall during a rain storm, therefore for any given average
    rainfall intensity DRAINS simulates the peaks and troughs during the storm, so that peak runoff flow
    rates may be more than when calculated using the average intensity.

    2.2.1      Detention Basin

    It is anticipated that all paved areas can be collected and discharged via the detention basin and the
    legal point of discharge in Gateway Drive. The construction stage sedimentation basin will be
    cleaned at the end of the construction phase and converted into a detention basin and bioretention
    cell.

    The outlet pipe from the basin shall be 600mm diameter. The invert of the outlet pipe will be set
    300mm above the invert of the basin to allow for an extended detention period for the
    sedimentation basin. It is assumed that the extended detention depth is full at the commencement
    of the design storms for the purpose of sizing the detention basin.

                                                      5

Page 17

    Results of hydrologic and hydraulic analysis is included in the table 1 below.




     Storm          Existing       Developed Case                         Detention Basin
     Event         Discharge        Discharge (no
                                                                         (Capacity 1160m3)
                                      detention)
                     (m3/s)
                                        (m3/s)

                                                           Peak Basin       Peak Basin       Peak Outflow
                                                           Stage (m)**     Volume (m3)

    Tc (Mins)          30                  15

       100           0.663                1.23                1.80            1102               0.51

       20            0.502                0.99                1.35             820               0.42

       10            0.429                1.18                1.15             700               0.37

        5            0.377                1.03                1.05             620               0.34




        ** Includes extended detention depth of 0.2m.

                                   Table 1 - Detention Basin Requirements


    2.2.2    Model Correlation


    Hydrologic and hydraulic computations were performed using DRAINS. DRAINS calculates runoff by
    modelling depression (initial) loss for pervious and impervious areas, along with modelling a
    reducing loss through infiltration in pervious areas as these areas become wetter (known as the
    Horton infiltration model). The following parameter values were used in the hydrologic model;

    Paved Area Depression Storage: 1mm

    Grassed Area Depression Storage: 3mm


I   Soil Type: 2 (Moderate infiltration rates)

    Antecedent moisture content: 3 (Moderately wet)




                                                       6

Page 18

t   Results of the DRAINS hydrologic model were compared to the results using the rational method
    and the comparison is presented in Table 2 below;




            Model            Existing 1 in 100     Existing 1 in       Proposed 1 in   Proposed 1 in
                            Year Runoff Max.      100 Year Max.        100 Year Max.   100 Year Max.
                                     Flow              Volume                 Flow        Volume

t                                   (m3/S)               (m3)                 (m3/s)          (m3)


1                                (tc = 30 min)     (tc = 30 min)        (tc =15 min)    (tc = 15 min)




    Rational Method         0.663                 1193                 1.23            1107

    DRAINS (Horton          0.673                 1245                 1.23            1268
    Infiltration)

    Difference              +1                    4%                   0%              15%




                           Table 2 - Correlation of DRAINS with Rational Method

    DRAINS simulates the peaks and troughs in rainfall intensity during actual rainfall events , so
    comparison of peak flows between DRAINS and the rational method can be misleading. Therefore, a
    comparison of the volume of runoff is also necessary in order to calibrate the model to the rational
    method.

    The comparison above indicates that for the 1 in 100 Year rainfall events the DRAINS model
    correlates reasonably well with the traditional rational method.




a   3.0      RUNOFF QUALITY


    3.1      Modelling Methodology and Input

    Source node pollution parameters were taken from the MUSIC Modelling Guidelines by "Water by
    Design" (2010) (MMG 2010). MUSIC input parameters and data are summarised in table 3 below;




                                                       7

Page 19

    Rainfall Station and Data Set              Cooroy Composite site pluviograph



s   Time Step

    Modelling Period
                                               6 Min

                                               1" January 1973 to 315' December 1983.

    Mean Annual Rainfall (mm)                  1595



s   Evapotranspiration (mm)

    Rainfall runoff parameters
                                               1630

                                               As per MMG 2010 for commercial use (Table 3.7)

    Pollutant export parameters                As per MMG 2010 for commercial source node (Table 3.8)




                              Table 3 - MUSIC Modelling Hydrologic Input Data




    3.2     Treatment Train & Methods

    All paved areas on the site will be conveyed to the legal point of discharge in Gateway Drive via a
    sediment basin and bioretention cell. In addition, most car park pavements will slope directly
    towards vegetated swales so that runoff is dispersed. Areas that can not be sloped towards a
    vegetated swale or other soft landscaping feature are drained via a trench grate or pit that
    discharges into the underground drainage system.             The underground drainage system then
    discharges into the sedimentation basin.

    Almost 20% of the site has been set aside for landscaping.



a
    3.3     Sub-Catchment Areas

    Sub-catchment areas, along with conceptual design of the treatment train, is shown on plans
    included in Appendix A.

    3.3.1   Vegetated Swales: During detailed design it was found that vegetated swales would be
    impractical due to the steepness of the site. They have been deleted from the treatment train.

I   3.3.2   Buffer Strips:

    During detailed design it was found that vegetated swales would be impractical due to the steepness
    of the site. They have been deleted from the treatment train.




                                                       8




I

Page 20

    3.3.3   Bioretention Cell:

    All areas within the site shall discharge into the bioretention cell located in the base of the detention
    basin. The relevant MUSIC parameters were as follows;



t       •   Mean Surface area (m2): 308 m2
        •   Extended detention depth: 0.2m
        •   Filter area: 210 m2
        •   Unlined filter media perimeter (m): N/A (not available in version 3),
        •   Saturated hydraulic conductivity: 50mm & 200mm per hour
        •   Filter depth: 400mm
        •   TN content of media (%): NIL. Ameliorated with dynamic lifter just prior to planting,
        •   Proportion of organic material in filter (%): NIL (as for TN),
        •   Orthophosphate content of filter media (mg/kg): NA,
        •   Base will not be lined,
        •   Bioretention cell will be planted out with plants effective at nutrient removal (refer
            landscape details). Planting density shall be a minimum of
1               0 a mixture of at least 3 of the following species across 80% of the basin is required:


                         n   Carex appressa
                         n   Ficinia nodosa
                         n   Juncus amabilis
                         n   Juncus flavidus
                0 the remaining 20% balance area of the basin should be planted out with species
                    from the following list;


                         n   Isolepsis nodosa
                         n   Lomandra longifolia
                         n   Lomandra hystrix
                         •   Ghania sieberiana


        •   Overflow weir width: NA (secondary 525mm diameter RCP provided at driveway entrance in
            case the primary 450mm outlet blocks),
        •   Exfiltration Rate: NA
        •   Depth of submerged zone: NA (not included in Version 3 bioretention node),

    Refer landscape plans for details of planting plan.




                                                          9

Page 21

nj
          3.3.4     Gross Pollutant Traps

          Due to the constraints of the site direct maintenance vehicle access to the basin invert for will not be
          possible. Therefore gross pollutant traps have been installed on all but one of the pipes that
          discharge into the bioretention basin to capture all total suspended solids and gross pollutants and
          prevent them from accumulating in the bioretention basin, eliminating the need for sediment
          forebays.

          The relevant MUSIC modelling parameters are as follows;

                •   Pollutant reduction efficiencies independently verified:                   Yes
                •   Does data include performance results under dry weather flows:             Yes (available from
                    Humes),
                •   Is assumed high flow bypass consistent with manufacturers specifications?:    Yes (1 in 3
                    month combined flow rate of 0.63m3/s),
                •   Storage Volume (combined):                                     6m3,
                •   Expected maintenance frequency:                                3 to 6 months,
                •   Storage adequate to contain expected pollutant volume:         Ye

I         3.3.5     Rainwater Tanks

          It is proposed to install 4 35kL underground rainwater tanks at the site to collect runoff from the
          main retail area roof to be utilised for irrigation of plants in the nursery area and for flushing the
          staff and public toilets. The relevant MUSIC parameters for the rainwater tanks are as follows;
               • Volume below overflow pipe: 105kL
               • Depth above overflow: 0.1m
               • Surface area of tanks: 80m2
               • Overflow pipe diameter:
               • Stored Water for irrigation and other purposes: Up to 105kL,
               • Indoor Connections: Staff and public toilets (4No.)
               • Annual demand: 1105 kL



          3.4       MUSIC Modelling Results

          Results of the MUSIC model analysis are shown in Tables 5 & 6 below;




I                                                    Residual
                                                      Load
                                                                       Residual
                                                                         Load
                                                                                  Reduction
                                                                                  Target %
                                                                                                               % Reduction
                                                                                                               (50mm/hr)*
                                         Source       (200            (50mm/hr)               % Reduction
      arameter                            Load       mm/hr)                                   (200mm/hr)*
     Flow (ML/yr)                            27.5         26.3             26.3         NA             4.2             4.2
     Total Suspended Solids (kg/yr)         6660          469               582          80               93          91.3
     Total Phosphorus (kg/yr)                23.1         4.69             4.51          60             79.6          80.4
     Total Nitrogen (kg/yr)                  86.2         44.9             45.8          45             47.9          45.8
     Gross Pollutants (kg/yr)                 627          0.0              0.0          90              100           100


                                                                 10

Page 22

1
    * Relative results for hydraulic conductivity of 50mm/hour and 200mm/hr for the filter media in
    bioretention cell.

                               Table 5 - MUSIC Modelling Results - Pollutant Reduction




                                            Flow (ML/yr)                                    26.3
                                            Total Suspended Solids (kg/yr)                   469
                                            Total Phosphorus (kg/yr)                        4.69
                                            Total Nitrogen (kg/yr)                          44.9
                                            Gross Pollutants (kg/yr)                          0.0


                               Table6 - MUSIC Modelling - Mean Annual Residual Loads




    4.0       Impacts on Receiving Waterways


    Stormwater harvesting demand from the site will represent around 1.2 ML per year, compared to
    the original annual average runoff volume of approximately 7.5ML per year and a residual post-
    developed annual average runoff volume of 16.4ML per year (refer Table 5)1. Therefore stormwater
    harvesting will not reduce the total volume of water discharging from the site compared to the pre-
    developed condition and will not have an impact on downstream receiving waterways.



I   The proposed stormwater detention will maintain the peak runoff flow rates close to the original
    (pre-developed) flow rates (see Table 1), so the sedimentation/detention basin will have no adverse
    impact on downstream receiving waterways.




    5.0       Monitoring of Treatment Train


    Monitoring of the performance of the treatment train shall be conducted as follows, for a period of
    three years from the completion of the development;




    5.1       TSS and Gross Pollutant


              The majority of TSS and gross pollutants is expected to originate from areas of car parks and
              other paved road surfaces. Therefore most TSS and GP collection is expected to occur in the
              gross pollutant traps installed on the bioretention cell inlets.                            Observation of the
              bioretention basin should be undertaken duirng routine maintenance, but not less than


    i The original runoff volume is calculated by multiplying the site area of 2.33 Ha by the annual rainfall runoff of 1.6m and a
    typical runoff co-efficient of 0.2 (conservative).


I                                                                  11

Page 23

             every 6 months, and this will give a quick and obvious indication of the performance of the
             GPT's. If there is evidence of significant gross pollutants and sediment accumulating at the
             bioretention cell inlets then this would be an indication that the GPT's may not be
             performing adequately.            Records should be kept of visual assessment and corresponding
             photographs taken.




    5.2      General Performance of Bioretention Basin

             Visual assessments of the basin should be carried out during routine maintenance, but not
             less than every 6 months. Figure 1 below gives guidance on indications of problems, their


I
             likely causes and rectification measures.

                Parameter         Indicator of       Possible Cause                      Possible Management Action(s)


I
                Plant health      Too much           System undersized                   Replace filter media with that of a
                                  water                                                  higher infiltration capacity
                                                     Poor infiltration capacity (water   As above


I                                 Too little
                                  water
                                                     lo¢ai ng)
                                                     System oversized (eg. plants
                                                     further from inlet are drier)
                                                                                         Consider Installing a choke on outlet
                                                                                         OR
                                                                                         Replant with dry tolerant plants
                                                     Inlet levels wrong (system is       Reset inlet levels
                                                     bypassing too early)
                                  Poor flow          Excessive inflow velocities (at     •   Install/augment energy
                                  control            inlet)                                  dissipation device
                                                                                         •   Relocate inlet
                                                     Inadequate provision for bypass     •   Install/augment energy
                                                     of high flows (damage                   dissipation device
                                                     throughout system)                      Reconfigure inlet to prevent high
                                                                                             flows entering system
                                                                                         •   Relocate inlet
                Erosion           Poor flow          Excessive inflow velocities         •   Install/augment energy
                                  control                                                    dissipation device



I
                                                                                         •   Relocate inlet
                                                     Inadequate provision for bypass     Reconfigure Inlet to prevent high
                                                     of high flows (damage               flows entering system
                                                     throughout system)
                Build-up of       Clogging           Excessive loads of sediment         •   Install pre-treatment device (see
                sediment on                                                                  Chapter 3 for ideas)
                filter surface                                                           •   Scarify the filter surface
                                                                                             between plants and/or densely
                                                     System undersized
                                                                                             vegetate to break up the
                                                     Inadequate pre-treatment                clogging layer



                                                            Figure 12


    5.2.1    Additional advice on filter media performance




    2 FAWB Stormwater Biofiltration Systems Adoption Guidelines Table 6.


I                                                               12

Page 24

Poor plant growth is often an indicator of poor filter media drainage. If plants nearer the basin inlets
are growing poorly this can indicate an excess of water and therefore the filter media may be
draining too slowly. If however all plants in the basin are growing poorly this may be an indication of
insufficient water and therefore the filter media may be draining too quickly.

Once established, plants in the bioretention cell will receive adequate nutrient from stormwater
runoff.

The results of all monitoring is to be submitted to Sunshine Coast Regional Council in digital format.




                                                   13

Page 25

APPENDIX A- SURFACE WATER MANAGEMENT

       CONCEPTUAL LAYOUT PLAN




                 14


[OCR of page images]
 

APPENDIX A — SURFACE WATER MANAGEMENT

CONCEPTUAL LAYOUT PLAN

14

 

 

Page 26

    O




                         ROOF AREA 061)8



                         NURSERY AREA AR


                             ANOSCAPE AREA




                                                                                                                                                             1y i l 1
                                                                                                                                                             _ 98 m1

1




t
s

s
                                                                                                                          NrE
                  SSUED'OR        WI       5 30N   /RRRJYiO S U   SSU-0IOR   WE   DRINN   SRVROYED^^''N^   5 MM1NSIIL
                                                                                                                                                                                                                                CIVIL DRAWING
        kDtORMOR"Alpl            2113)"F    Rv                                                    OF-        MAMICAPELO
                                                                                                                                      TOM GROUP Pty Ltd                   1I. TROON PTY. LTI   PROPOSED BUNNINGS
                                                                                                 lo"
                                                                                                                                                 animal

                                                                                                                                                tnV4C 11
                                                                                                                                                      3350
                                                                                                                                                               All
                                                                                                                                                               1
                                                                                                                                                                                               WAREHOUSE                CARPARK CALCULATIONS
                                                                                                                                                                                               EUMUNDI-NOOSA ROAD
                                                                                                                                TGM     ,, f03)5110OSRO
                                                                                                                                        Web tgm0ro^i^rmm
                                                                                                                                                                 cSp1W'
                                                                                                                                                              .-Sena,
                                                                                                                                                                                               NOOSAVILLE, QUEENSLAND
                                                                                                                                                                                                                           4400-02-CE           CC101 01

Page 27

L
    APPENDIX B - CARDNO SURFACE WATER MANAGEMENT PLAN

1




a




                            15


[OCR of page images]
 

APPENDIX B — CARDNO SURFACE WATER MANAGEMENT PLAN

15

 

 

Page 28

                       Cava"a
                       Shaping the Future




                              BUNNINGS WAREHOUSE, NOOSAVILLE



                                            Surface Water Management Plan




1




    15 December 2006
    Job No. 3501-54                                      Bunnings Warehouse

Page 29

I   BUNNINGS WAREHOUSE. NOOSAVILLE
    SURFACE WATER MANAGEMENT PLAN                                                    11(0:^ Carwno

                                                                                                Cardno (QId) Pty Ltd
                                                                                                      ABN 57 051 074 992
                                                                                            5 Gardner Close Milton Q 4064
                                                                                                     PO Box 388 Toowong
                                                                                               Queensland 4066 Australia
                                                                                                Telephone: 07 3369 9822
                                                                                                  Facsimile: 07 3369 9722
                                                                                            International: +61 7 3369 9822
                                                                                                   [email protected]

                                                                                                      www,cardno.com au




     Document Control

                                                          Author                                 Reviewer
         V ers i on              D a te
                                                      Name                Initials            Name                 Initials
             1              15 December 2006         Sid Duty                              Martin Giles



           "© 2006 Cardno (QId) Pty Ltd All Rights Reserved. Copyright in the whole and every part of this
           document belongs to Cardno (QId) Pty Ltd and may not be used, sold, transferred, copied or
           reproduced in whole or in part in any manner or form or in or on any media to any person without the
           prior written consent of Cardno (Qld) Pty Ltd."




    Bunnings Warehouse                                    Version 1                                       15 December 2006
    J 3501.541WP%SWMP doc                           Commercial in Confidence                                        Page i

Page 30

    BUNNINGS WAREHOUSE, NOOSAVILLE
    SURFACE WATER MANAGEMENT PLAN
                                                                                                      ^^ Car dno

                                BUNNINGS WAREHOUSE, NOOSAVILLE
                                SURFACE WATER MANAGEMENT PLAN

                                                   TABLE OF CONTENTS

    1.     INTRODUCTION .................................................................................................................1

            1.1    Landscape Intent ........................................................................................................ 1

    2.     WATER QUANTITY ............................................................................................................ 2

           2.1     Rainfall data ............................................................................................................... 2
           2.2     RAFTS Model Setup .................................................................................................. 2
           2.3     Model Calibration ....................................................................................................... 3
           2.4     Detention Basin Sizing ............................................................................................... 3
           2.5     RAFTS Model Results ................................................................................................ 4
                   2.5.1 Areas with impractical gradients .................................................................... 5
           2.6     Outlet .......................................................................................................................... 5

    3.     SWALE SIZING .................................................................................................................. 6

    4.     STORMWATER QUALITY ................................................................................................. 7

           4.1     Stormwater Management Practices ........................................................................... 7
           4.2     Available Management Practices and Suitability ....................................................... 7
           4.3     Outline Suitability Assessment ................................................................................... 9
           4.4     Proposed Stormwater Management ........................................................................ 10
1          4.5
           4.6
                   Site Specific Objectives ............................................................................................ 10
                   MUSIC Methodology ................................................................................................ 12
                   4.6.1 Adopted Land Uses ...................................................................................... 12
                   4.6.2 Nursery area ................................................................................................ 12
           4.7     Device Sizing ........................................................................................................... 12
           4.8     Modelling Results ..................................................................................................... 13

    5.      IRRIGATION TANK SIZING .............................................................................................14


    6.      MAINTENANCE REQUIREMENTS ..................................................................................16


I          6.1
           6.2
                   Construction Phase & Sediment Control .................................................................. 16
                   Ongoing Maintenance .............................................................................................. 16

    7.     CONCLUSION ..................................................................................................................18




    Bunnings Warehouse                                              Version 1                                                   15 December 2006
    J \3501-54\WRSWMP doc                                     Commercial in Confidence                                                    Page ii

Page 31

I
    BUNNINGS WAREHOUSE, NOOSAVILLE
    SURFACE WATER MANAGEMENT PLAN                                                                  4(.^ Cardno

    LIST OF TABLES

    Table 1              Rainfall Parameters for Rockhampton ..................................................................... 2
    Table 2              RAFTS Model: Area and Slope ............................................................................... 2
    Table 3              Rational Method Calculations .................................................................................. 3
    Table 4              Rational Method vs RAFTS Results ........................................................................ 3
    Table 5              Detention Basins Stage Storage Curves ................................................................. 3
    Table 6              Detention Basin Sizing Results ................................................................................ 4
    Table 7              Detention Basin Sizing Results - including unattenuated car park area ................. 5
    Table 8              BCC Swale Design Guidelines ................................................................................ 6
    Table 9              Stormwater Management Practices ......................................................................... 8
    Table 10             Water Quality Objectives ....................................................................................... 10
    Table 11             Bioretention Device Parameters ............................................................................ 13
    Table 12             Total Annual Loads ................................................................................................ 13
    Table 13             Rainwater Tank Performance ................................................................................ 14
    Table 14             Detention Basin Parameters: Summary ................................................................. 18

    LIST OF FIGURES

    Figure 1             Schematic Treatment Train
    Figure 2             Locality Plan
    Figure 3             Existing Site
    Figure 4             Proposed Site and Conceptual Drainage Layout


    APPENDICES

    APPENDIX A                 RAFTS Results
    APPENDIX B                 MUSIC Parameters
    APPENDIX C                 Statement of Landscape Intent




    Bunnings Warehouse                                                 Version 1                                           15 December 2006
    J 13501- 541WP\SWMP doc                                   Commercial in Confidence                                                 Page iii

Page 32

    BUNNINGS WAREHOUSE, NOOSAVILLE
    SURFACE WATER MANAGEMENT PLAN
                                                                            IIC^ Cardna

    1.          INTRODUCTION

                A Bunnings Warehouse is proposed for a site on the corner of Eumundi-Noosa Road and
                Gateway Drive in Noosaville. The site falls under the jurisdiction of Noosa Shire Council.

                Development has the potential to increase the rate of runoff from the site, possibly leading
                to flooding issues downstream. Human activity on the site will also bring with it the
                potential to adversely affect the quality of runoff, through the transport of debris, litter,
                petrols, oils and lubricants and so on from impervious areas. However, the existing site is
                not undisturbed; it has been cleared and appears to be used as a stockpile area for
                aggregates.

                In accordance with the requirements to maintain post-development runoff quantity and
                quality, this document details the preliminary sizing and modelling of the detention
                requirements and stormwater quality treatment train for the development, using Water
                Sensitive Urban Design techniques. The final type, capacity and dimensions of the devices
                will be subject to detailed design at a later stage.

                1.1          Landscape Intent
                A Statement of Landscape Intent (11 December 2006) has been prepared by Arterra
                Landscape Architects, and is included as Appendix C. It describes the general landscaping
                across the site, and includes a summary of the Water Related Design Principles described
                and modelled within this report.




I
I
I



    Bunnings Warehouse                                  Version 1                             15 December 2006
    J \3501-541WP1SWMP.doc                       Commercial in Confidence                               Page 1

Page 33

    RUNNINGS WAREHOUSE. NOOSAVILLE
    SURFACE WATER MANAGEMENT PLAN
                                                                                      (J) Carilo/no

    2.          WATER QUANTITY

                2.1             Rainfall data
                Historical rainfall intensities were calculated with AUS-IFD software, employing methods
                detailed in the Institute of Engineers Australia's 1987 Australian Rainfall & Runoff (ARR).
                The parameters used in the software are listed in Table 1 below.

                Table 1          Rainfall Parameters for Rockhampton

                  Log Normal Intensities (mm/hr)

                              2 year 1 hour   50.0                               50 year 1 hour   93.64
                             2 year 12 hour   10.69                           50 year 12 hour     23.84

                             2 year 72 hour   3.38                            50 year 72 hour     9.26
                 Geographical Factors
                   Skewness G        0                           F2    4.23                          F50   17.85

                The AUS-IFD software produces a table of rainfall intensities for a range of storm durations,
                and this information was entered as a series of design storms to the RAFTS database.
                Zone 3 temporal patterns were applied to the data according to the ARR standard.

                2.2             RAFTS Model Setup
                The site was divided into several subcatchments according to lot position, slope and
                direction of fall. These are shown schematically on Figure 1 and in plan on Figure 4. In
                order to mitigate against the potential increase in stormwater runoff following development,
                the existing situation was also modelled in order to establish a baseline.

                Slopes in the existing situation were derived from information provided on the surveyor's
                drawings, and from contours, and slopes for the proposed situation were estimated. These
                were later adapted to achieve calibration, as described in the following section.

                Pervious and impervious areas were calculated assuming that the site is completely
                pervious in its existing state, and completely impervious following development (except for
                the bioretention strips and landscaping, which are assumed to be completely pervious).
                The model parameters are listed in Table 2 below.

                Table 2          RAFTS Model: Area and Slope


                                                       Existing          Proposed          Existing          Proposed
                       Node              Area (ha)
                                                      Slope (%)          Slope (%)         Mannings          Mannings


                    Car park              1.1190           4                     2            0.07             0.025


I                 Bioretention
                      Roofs
                                          0.1507
                                          0.7884
                                                           4
                                                           4                  30
                                                                                 2            0.07
                                                                                              0.07
                                                                                                                0.07
                                                                                                               0.025

                   Hardstand              0.2064           4                     2            0.07             0.025
                   Landscape              0.2011           4                     2            0.07              0.05

                Each node in RAFTS is also assigned rainfall losses: for pervious areas, initial loss is zero,
                and continuing loss is 2.5mm. For impervious areas both losses were set to zero.



I   Bunnings Warehouse
    J \3501.54\W ,SWMP doc
                                                            version 1
                                                      Commercial in Confidence
                                                                                                           15 December 2006
                                                                                                                     Page 2

Page 34

    BUNNINGS WAREHOUSE. NOOSAVILLE
    SURFACE WATER MANAGEMENT PLAN                                                           <,^ Carldno

                2.3           Model Calibration
                The Rational Method calculation parameters are summarised in Table 3 below.

                Table 3         Rational Method Calculations


I                 Parameter

                  Area
                                                               Existing Conditions          Developed Conditions

                                                                                     2.7543 ha



I                 10 year 1 hour rainfall intensity

                  Fraction Impervious (fi)                             0.10
                                                                                     59 mm/hr

                                                                                                        0.775

                  Coefficient of runoff (C10)                          0.55                             0.83

                  Coefficient of runoff (C1oo)                        0.660                             0.996
                  Time of concentration (ta)                         30 mins                           10 mins

                  Rainfall Intensity (100 year)                    152 mm/hr                          249 mm/hr

                  Peak Runoff (100 year ARI)                        0.77 m3/s                         1.90 m3/s

                  % Difference                                                                   Approx + 250 %


                The model was calibrated by comparing the flows produced by RAFTS with those
                calculated by the rational method above for the 100 year event. The results are shown
                below.

                Table 4         Rational Method vs RAFTS Results

                         Node           Existing Q100 (m3/s)           Proposed Q100 (m3/s)

                       Rational                   0.77                               1.90

                  RAFTS Results                   0.78                               1.82

                      Difference                 +1.3%                              -4.7%


                As can be seen from the table, the results produced from the Rational calculation for the
                100-year average recurrence interval compare very favourably in the proposed case with
                the runoff predicted by the RAFTS model. The results were achieved using a Storage
                Coefficient Multiplication Factor, B,,, of 2.

                2.4           Detention Basin Sizing
                In order to mitigate the increase in peak discharge under developed conditions the RAFTS
                model was used to size the detention basin required for the site. The basin will be located
                in a landscaped area at the south-east corner of the site.



i
                The stage storage curves adopted for the basin are presented in Table 5.

                Table 5         Detention Basins Stage Storage Curves

                  Stage (m)                0             0.1         0.4            0.6         0.8            1.0        1.2
                  Storage (m)              0          250            500            750      1000          1250          1500



I
w   Runnings Warehouse
    J \3501-54\WPISWMP doc
                                                               Version 1
                                                         Commercial in Confidence
                                                                                                                  15 December 2006
                                                                                                                            Page 3

Page 35

L
      BUNNINGS WAREHOUSE. NOOSAVILLE
      SURFACE WATER MANAGEMENT PLAN
                                                                                     LF) Car-dno

                  In order to provide a further improvement in water quality in low flow events (of up to the
                  three month return period) the initial 300mm of storage depth available in the basin will be
                  used for stilling of flows. The main stormwater outlet will be set at 300mm above the basin
                  invert level, whereas a smaller pipe set at a lower level will allow the controlled release of
                  low flows over a longer period.

                  An emergency spillway is also provided in the basin to allow flows from extreme events
                  (including and in excess of the 100-year event) to pass over the rim of the basin, bypassing
                  the outlet. This weir would be 20 metres wide and at a level of 1.15 metres above the
                  basin invert.

P-,               2.5        RAFTS Model Results


I                 A range of storm durations were modelled for a series of ARI design events. Peak flows
                  were determined for the 1 year through to the 100 year event and durations ranged from
                  10 minutes through to the 24 hour event.


1                 The results of the modelling are shown in the table below.

                  Table 6     Detention Basin Sizing Results


t                   Storm
                    Event
                             Existing Case
                              Discharge
                                 (m'/s)
                                              Developed Case
                                              (without basin)
                                              Discharge (m'/s)
                                                                        Peak Basin
                                                                                     Detention Basin
                                                                                      Peak Basin       Peak Outflow
                                                                         Stage (m)    Volume (m')         (m'/s)

                     100         0.785              1.816                  1.16          1455              0.609

                      50         0.698              1.653                  1.06          1321              0.513

                      20         0.594              1.523                  0.91          1144              0.451

                      10         0.508              1.338                  0.80          1002              0.396


1                       5

                        1
                                 0.446

                                 0.224
                                                    1.199

                                                    0.759
                                                                           0.72

                                                                           0.46
                                                                                          901

                                                                                          574
                                                                                                           0.351
                                                                                                           0.198

                  The table shows that in all cases peak outflows are reduced to below the existing case
                  discharges. The maximum utilised volume of the detention basin is approximately 1455 m3,
                  giving a peak stage of 1.16 metres in the 100 year ARI event. It can be noted that the
                  design is relatively conservative as the depth of ponding is relatively low. Therefore it
                  should be possible to optimise the design and reduce the footprint of the basin even further
                  in detailed design.


a                 QUDM indicates in Table 6.2 that the maximum allowable stage during the 20 year ARI
                  event is 1.20 metres. The peak basin stage of 0.91 metres displayed for the basin is well
                  below this figure and, of course, the basin is only a maximum of 1.2 metres deep in any
                  case. Further, only the deepest central area of the basin would experience such depths,
                  and the long shallow fall at the edges of the device (set at a gradient of 1 in 6) would
                  preclude any public safety risk due to sharp inclines.

                  To allow for a freeboard and include an additional factor of safety, it is suggested that the
                  top of the bund should be at a level of 300 mm above the maximum 100-year level - in this
                  case equating to 1.46m above the basin invert.




      Bunnings Warehouse                                    Version 1                                  15 December 2006
      J\3501-541WP\SWMPdoc                         Commercial in Confidence                                      Page 4




I

Page 36

    BUNNINGS WAREHOUSE. NOOSAVILLE
    SURFACE WATER MANAGEMENT PLAN                                                    C07) Cardno

                    2.5.1       Areas with impractical gradients

                    It may be noted that levels across the site may be such that it will be difficult or impractical

I                   to route runoff from certain areas to the detention basin. To ensure adequate falls across
                    the car park, for example, a cut and fill operation is envisaged which will require the use of
                    a retaining wall along the western boundary. It has been suggested that in this area,


I                   surface water is released direct to the outlet Swale without passing through the detention
                    basin (although three-month flows will still pass through bio-retention devices). To ensure
                    that surface water runoff rates following development are equal to or less than those
                    existing, even with an unattenuated area of almost 2500m , the RAFTS model was
                    amended and revised results calculated. The results are shown in Table 7 below.

                    Table 7      Detention Basin Sizing Results - including unattenuated car park area

                      Event     Existing (m'/s)          Stage (m)               Volume (m3)    Site Outflow (m3/s)

                        100          0.785                  1.06                    1325              0.575

                         50          0.698                  0.95                    1193              0.522

                         20          0.594                  0.84           1        1046              0.471



I                        10

                          5

                          I
                                     0.508
                                     0.446

                                     0.224
                                                            0.73
                                                            0.66

                                                            0.41
                                                                                    909
                                                                                    822

                                                                                    518
                                                                                                      0.403
                                                                                                      0.350

                                                                                                      0.209


                    It can be seen that for each storm event, the outflows from the site as a whole (the outflow
                    refers to the site 'end' node and not the basin) remain less than the existing rates.
                    Paradoxically, allowing certain areas of the site to drain direct to the swale does not
                    increase the overall peak runoff rate in this case. This is likely to be because the times of
                    concentration (the time taken for the runoff to arrive at the discharge point) for each area do
                    not coincide, and this creates two smaller peaks in the hydrograph over a longer period of

1                   time.

                    2.6         Outlet
                   A single 525mm pipe was adopted for the basin outlet and, as described above, set with an
                   invert level 300mm above the bottom of the basin. This outlet pipe will drain through the
                   bund, is 10 metres long and set at a grade of 0.5 per cent. The overflow spillway level was
                   set at 1.15 metres above the invert of the basin (at the downstream end) and is 20 metres
                   wide.

                    The overflow weir becomes operational only in events approaching the 100-year return
                    period, when it would experience a flow depth of approximately 10mm.

                   As stated, the outlet pipe has been placed with its invert set at 300mm above the 'floor
                   level' of the basin. This provides storage for the containment and stilling of runoff from
                   events of up to the three-month average recurrence interval. These flows will not exit from
                   the basin via the stormwater pipe, but instead through a lower and smaller pipe through a
                   longer period of time. Using this approach, the option also exists to install a sandy loam
                   bioretention filter placed in the floor of the basin to further improve the treatment train.



r                   Flows from the detention basin will be released via the outlet to a vegetated Swale, running
                    in a northerly direction along the western boundary of the site. An outline sizing of this
                    Swale is provided in the following section.




    Bunnings Warehouse                                       Version 1                               15 December 2006
    J   ^3 O 1-541WP1SWMP doc                         Commercial in Confidence                                 Page 5

Page 37

    BUNNINGS WAREHOUSE, NOOSAVILLE
    SURFACE WATER MANAGEMENT PLAN
                                                                                  <4^ Cardna

    3.           SWALE SIZING

                 Discharges from the detention basin will travel along a grassed swale in a northerly
                 direction along the western boundary. A HECRAS flow model was constructed to analyse
                 the performance of a such a swale.

                 From Table 6 it can be seen that the peak outflow in the 100-year event equates to 0.609
                 m3/s. Mannings equation was used to arrive at an outline size for the Swale. The swale
                 was a total of 5m wide, 0.3m deep, and sides sloping at 1 in 6, meeting at a base of 1.4m
                 width. The Swale would be approximately 150 metres long, and set at a gradient of around
                 1.5%. At this outline design stage, bends and constrictions were not modelled (driveway
                 crossings would need to be elevated in order to avoid wide and shallow cross sections).
                 Cross sections were input to HEC-RAS, a value of Manning's n of 0.06 was selected, and
                 the above derived flow of 0.609 m3/s was applied to the head of the run.

                 As swales are generally accessible by the public, design guidelines are available that
                 ensure that safety considerations are met in terms of bank slope, flow velocity and depth.
                 Brisbane City Council's Draft WSUD Engineering Guidelines (August 2005), for example,
                 lists typical design parameters which have been reproduced in Table 8 below. The results
                 of the HECRAS analysis are also included in the table.

                 Table 8       BCC Swale Design Guidelines

                   Design Parameter                                               Typical Value    Actual Value

                   Swale longitudinal slope                                          1 to 4%           1.5%

                   Swale side slope (for areas not requiring access, eg. Parks,    1:3 to 1:10          1:6
                   easements, median strips)

                   Swale side slope for trafficability (for footpaths with 'at-     Max 1:9             n/a
                   grade' crossings)
                   Swale side slope (elevated driveway crossings)                  1:3 to 1:10          1:6

                   Manning's n (with flow depth less than vegetation height)       0.15 to 0.4          n/a


a                  Manning's n (with flow depth greater than vegetation height)

                   Maximum velocity for scour in minor event (eg. Q2)
                                                                                   0.02 to 0.05

                                                                                     0.5 m/s
                                                                                                       0.05

                                                                                                      0.5 m/s

                   Maximum velocity for Q50                                          2.0 m/s          0.6 m/s

                   Depth x velocity for high risk locations                         <0.4 m2/s
                                                                                                     0 . 2 m 2/s
                   Depth x velocity for low risk locations                          <0.6 m2/s
                   Maximum depth of flow, Q50                                         0.3m            0.28 m


                 As can be seen from the table, the Swale is adequate to convey the anticipated flows while
                 meeting minimum safety criteria. However, the design levels at the basin outlet, at
L                approximately 15m AHD, fall to approximately 11m AHD at the northern end of the site - a
                 fall of around 2.6%. The difference between the Swale slope used above and the actual
                 slope on site can be reduced through the use of simple rock dams placed at predetermined
                 drops in the channel level, creating attractive weirs or waterfalls along the length of the
                 swale.

                 Further modelling will be required at the detailed design stage to accurately model all
                 bends and constrictions in the swale's route through the site and the addition of local
                 surface water discharges to the flow. However, the analysis demonstrates that it will be
                 possible to provide a Swale to convey flow.



    Bunnings Warehouse                                        Version 1                           15 December 2006
    J.\3501-54\WP\SWMP.doc                           Commercial in Confidence                               Page 6

Page 38

    BUNNINGS WAREHOUSE, NOOSAVILLE
    SURFACE WATER MANAGEMENT PLAN
                                                                                              Cardna


    4.          STORM WATER QUALITY

                4.1            Stormwater Management Practices
                The formulation and implementation of the stormwater management plan for the
                development is based on the following key principles.
J



                      •     Adoption of Water Sensitive Urban Design (WSUD) principles throughout the site.
                            This includes consideration of features such as preventing the concentration of flow
                            in downstream areas and the use of wetland systems to manage runoff water
                            quality.

                      •     Management and control of water quality both during and after construction. A
                            detailed Erosion and Sedimentation Control Plan will need to be developed in
                            accordance with recognised standards during the detailed design phase and
                            implemented on site during the subdivision construction process.

               A Stormwater Quality Management Plan (SQMP) has been prepared for the site that uses
               these principles to describe how stormwater runoff from the site is to be treated to comply
               with the water quality objectives specified for the receiving water bodies (refer Section 3.1).
               This SQMP describes the stormwater management measures proposed for the site, and
               includes the following broad steps:

U                     •     Identify environmental values and water quality objectives for discharge from site
                            (refer Section 4.5);

                      •     Consider types of stormwater management practices appropriate for use within
                            development (refer Section 4.2);

                      •     Demonstrate that water quality objectives can be met with available stormwater
                            management practices (refer Section 4.8).

               4.2             Available Management Practices and Suitability
               A wide range of stormwater management practices are available to achieve the principles
               of Water Sensitive Urban Design. All have been shown to be successful when correctly
               designed, but selection of the most appropriate practices for a particular development is
               highly dependent on site conditions.

               The Table overleaf lists the most common stormwater management practices currently
               used, along with opportunities and constraints for their use. This table forms the starting
               point for stormwater management for the site. Considering the site's constraints, not all of
               the measures outlined in the table are suitable.      Each treatment option is therefore
               discussed in more detail and comment made on the suitability of each in the context of the
               development.




    Bunnings Warehouse                                     Version 1                             15 December 2006
    J'\3501-54\WP\SWMPdoc                            Commercial in Confidence                              Page 7

Page 39

    RUNNINGS WAREHOUSE, NOOSAVILLE
    SURFACE WATER MANAGEMENT PLAN




                 Table 9       Stormwater Management Practices

      Practice                                          Opportunities                           Constraints
                               Pollutants removed          Scale            Other

                                                                            Pre-treatment for        Require frequent
      Litter baskets/racks      Litter and debris - M         Local


I
                                                                             other practices          maintenance
                               Coarse sediment - H
         Sediment traps                                     Regional                            Aesthetic and safety issues
                               Suspended solids - L
                               Litter and debris - M
         Gross pollutant                                                    Pre-treatment for
                               Coarse sediment - H          Regional                            Require regular maintenance
          traps (GPTs)                                                       other practices
                               Suspended solids - L

                               Litter and debris - M
       Filter strips/ buffer   Coarse sediment - H                             Peak flow
                                                            Lot/Local                                Require flat terrain
               strips          Suspended solids - H                           management
                                   Nutrients - M

                                Litter and debris - M
                               Coarse sediment - H                             Peak flow
           Grass swales                                       Local                                 Require flat terrain
                               Suspended solids - H                           management
                                    Nutrients - M

                                Litter and debris - M
                               Coarse sediment - H                             Peak flow
       Vegetated swales                                       Local                                 Require flat terrain
                               Suspended solids - H                           management
                                    Nutrients - H

                               Coarse sediment - M
      Extended detention                                                       Peak flow           Requires pre-treatment
                               Suspended solids - M         Regional
            basins                                                            management          Large land area required
                                   Nutrients - L
                               Suspended solids - H
                                                                               Peak flow
      Infiltration trenches        Nutrients - M              Local                               Requires pre-treatment
                                                                              management

           Bio-retention       Coarse sediment - H
                                                                               Peak flow
              systems          Suspended solids - H           Local                               Requires pre-treatment
                                                                              management
           (rain garden)           Nutrients - H
                               Suspended solids - H
                                                                               Peak flow         Not appropriate for steep
       Porous pavements        Total phosphorus - M           Local
                                                                              management                  sites
                                 Total nitrogen - L
                               Coarse sediment - H                                                Requires pre-treatment
           Constructed         Suspended solids - H                            Peak flow         Not appropriate for steep
                                                            Regional
            wetlands           Total phosphorus - M                           management                   sites
                                 Total nitrogen - L                                             Requires large area of land

                                                                               Peak flow           Requires community
        Rainwater tanks                 N/A                    Lot
                                                                              management              involvement

                                                                              Other benefits
           Community            Litter and debris - L                         include weed
                                                            Regional                              Community participation
           education                Nutrients - L                            control, reduced
                                                                                water use

    Note         Data taken from NSW EPA Managing Urban Stormwater - Treatment Techniques, 1997
                 L - 10 - 50% removal
                 M - 50 - 75% removal
                 H - 75 - 100% removal
                 Scales    Lot      less than 1 ha
                           Local     1 - 10 ha
                           Regional greater than 10 ha




    Runnings Warehouse                                          Version 1                                     15 December 2006
    J \.3501 54\WPISWMP doC                              Commercial in Confidence                                       Page 8

Page 40

BUNNINGS WAREHOUSE, NOOSAVILLE
SURFACE WATER MANAGEMENT PLAN                                             <0^ Cardno

            4.3          Outline Suitability Assessment
            Each of the techniques described in the previous table is further assessed below, with
            regard to the site's specific opportunities and constraints.

            Litter Baskets/racks

            The primary purpose for litter baskets is to remove medium sized litter and debris from the
            site. Significant litter loads are not expected and other measures will be more appropriate
            for managing the removal of litter from the site.

            Sediment Traps

            Sediment traps will be required during the construction phase to limit the transport of
            sediment off site. Following construction, sediment levels will return to a low level, and
            traps are therefore not considered necessary as a long-term water quality measure.

            Gross Pollutant Traps

            Gross pollutant traps (GPTs) are predominantly used for the removal of litter and debris -
            although they have been shown to effectively remove coarse sediment and suspended
            solids (Brisbane City Council, 1999). Modelling shows that a GPT will be not be required.

            Filter Strips/Buffer Strips

            Buffer strips are areas of land left in their natural state that act to reduce peak runoff flows
            and improve the quality of stormwater runoff. This treatment improves the aesthetic and
            biodiversity value of the development and provides significant quality and quantity
            improvements.

            Grass Swales

            Grass swales are considered a highly effective and aesthetic water quality (and to a lesser
            extent, water quantity) control measure, when placed in flat areas. In this case, vegetated
            swales, described below, are more appropriate.

            Vegetated Swales

            Vegetated swales require similar conditions as those outlined for grass swales above, and
            wherever slopes are sufficiently low they would provide effective stormwater treatment for
            the site. They will be employed in the car park areas, but feature a filter media for
            treatment: see Bio-retention Systems.

            Extended Detention Basin

            Extended detention basins are designed to generally store runoff for 1-2 days. Their main
            purpose is the reduction of the peak discharge from the site during a storm event, and the
            retention of particulate matter. A detention basin is included on site in the southeast
            corner.

            Infiltration Trenches

            Infiltration trenches allow pre-treated stormwater runoff to infiltrate into surrounding soils
            and groundwater, and as such are not a treatment device in themselves. Where space is
            limited, bio-retention systems are preferred.




Bunnings Warehouse                                  Version 1                                15 December 2006
J \3501-54\WP\SWMP.doc                        Commercial in Confidence                                 Page 9

Page 41

    BUNNINGS WAREHOUSE, NOOSAVILLE
    SURFACE WATER MANAGEMENT PLAN                                                   LT) Cardno
                 Bio-retention Systems

                 Bio-retention systems effectively combine a grass or vegetated Swale with an infiltration
                 trench. They are considered to be extremely effective in removing sediment and nutrients.
                 Long bio-retention basins will be employed on site in the landscape divides of the car-park
                 area, in order to treat stormwater to an appropriate standard prior to release.

                 Porous Pavements

                 Porous pavements are not appropriate for high traffic areas due to increased maintenance
                 requirements. They are also less effective in steep areas. However, for relatively flat, low
                 traffic roads they could be suitable for this development, although their perceived expense
                 often leads to the preference of other measures in reaching quantity and quality objectives.

                 Constructed Ponds and Wetlands

                 Wetlands require reasonably large flat areas of land. Given the constraints of this
                 development, and the ability to use bio-retention systems, the use of ponds or wetlands is
                 not recommended.

                 Rainwater Tanks

                 The ability exists to install rainwater tanks throughout the development to reduce overall
                 water consumption. Tanks will be employed on site to collect roof runoff and provide a
                 source of irrigation for the nursery.

                 4.4            Proposed Stormwater Management
                 In summary, the stormwater management practices considered appropriate for use in this
                 development are:

                       •     Rainwater tanks to collect roof runoff, to supply nursery irrigation needs;

                       •     bio-retention swales, located in the car park landscape divides;

                       •     a detention basin for stormwater attenuation, located in the southeast corner.

                 To ensure that the Water Quality Objectives (described in the following section) can be
                 met, devices will be sized such that all stormwater up to the three-month design flow will
                 have passed through the nominated measures for treatment.

                 4.5            Site Specific Objectives
                 Water Quality Objectives (WQO) for the study site have been derived with reference to the
                 Queensland Environment Protection Agency Queensland Water Quality Guidelines (March
                 2006). The site is inland, and discharges would flow for approximately one kilometre along
                 what would be categorised in the guidelines as a 'lowland stream'. It is located within in the
                 South-east Region. The WQOs so derived are shown in the table below.

                 Table 10        Water Quality Objectives

                                       Parameter                                  Queensland EPA Value

                                Suspended Sediments                                      6 mg/L

                                  Total Phosphorus                                       50 pg /L
                                    Total Nitrogen                                      500 pg/L




I   Bunnings Warehouse
    J 13501-54\WP\SWMP doc
                                                             Version 1
                                                       Commercial in Confidence
                                                                                                     15 December 2006
                                                                                                              Page 10

Page 42

w
    BUNNINGS WAREHOUSE, NOOSAVILLE
    SURFACE WATER MANAGEMENT PLAN                                               11(4^ Car-dno

                As the development is commercial in character, the water quality parameters of relevance
                to the site are suspended solids, nutrients (nitrogen and phosphorus), litter, faecal coliforms
                and hydrocarbons. Of these parameters, the detailed modelling of litter, faecal coliforms
                and hydrocarbons is not possible at present using the industry standard analysis package
                (MUSIC) due to the lack of information regarding export rates. The modelling of defined
                water quality objectives has therefore necessarily focused on suspended solids and


t               nutrients (nitrogen and phosphorus).

                Previous versions of the MUSIC modelling software were able to achieve State and
                international objectives through the use of a suitably sized treatment train. However,

1               following a software update in 2005 to correct an error in the modelling of bio-retention
                basins, the new 'background' concentrations used in version 3.01 of the software are
                higher than the published water quality objectives. No matter how efficient the treatment
                train employed to serve the development, or the number of devices employed, it will not be
                possible to achieve the concentrations listed in Table 2.

               Further, it should be noted that the values presented in the Guidelines represent desirable

s              water quality in the watercourse, rather than the quality of the discharge to it. While
               specifying such values would guarantee that acceptable aquatic concentrations are
               obtained, such an approach is highly conservative and unrealistic if it is not possible to
               demonstrate that the objectives can be achieved, even with the latest modelling software

I              and treatment technology.

                The EPA Guidelines (in Section 4.3 on Page 51) state that 'a very important point to note is
                that although guidelines provide technical input to the development of WQOs or targets,
                they are not necessarily the same values as the finally adopted WQOs. The final
                WQOs take into account social, economic and current condition factors. These may dictate
                that achieving the actual guideline value is economically or technically unacceptable and
                that therefore the WQO should be set at some less stringent value. Hence the WQOs
                ultimately adopted might be the same as, or different from, the technical guideline values,
                depending on community and economic considerations.'

I              Alternative water quality objectives are clearly necessary. In recognition of the above,
               many Local Authorities have adopted load-based objectives.           These require the
               development to achieve:

                     •      an 80 % reduction in suspended solids;
                     •      a 60 % reduction in total phosphorus;
                     •      a 45 % reduction in total nitrogen; and,
                     •      a 90 % reduction in gross pollutants

               when compared to unmitigated urban development.

               This approach has recently been ratified in Healthy Waterways' Water Sensitive Urban
               Design Technical Design Guidelines for South East Queensland (June 2006). These load

1              based reduction objectives were therefore employed for this report.




I   Bunnings Warehouse
    J\3501-54\WP\SWMP doc
                                                           Version 1
                                                     Commercial in Confidence
                                                                                                15 December 2006
                                                                                                         Page 11




1

Page 43

    BUNNINGS WAREHOUSE, NOOSAVILLE
    SURFACE WATER MANAGEMENT PLAN                                            11(,^ Cardno

s               4.6          MUSIC Methodology
                In order to determine the effectiveness of the proposed treatment train in meeting the water
                quality objectives, a stormwater quality analysis was performed using the Model for Urban
                Stormwater Improvement Conceptualisation (MUSIC) Version 3.01.


t               The model requires the user to specify meteorological data (rainfall and evaporation), soil
                properties and pollutant loads for each area of the site, and suitable parameters for the
                MUSIC model were adopted in accordance with the recommendations of the Brisbane City
                Council publication Draft Guidelines for Pollutant Export Modelling in Brisbane- Version 7
                (2003). The values adopted for the analysis are listed in Appendix A.

                Rainfall and evaporation data for the site was input to the model using ten years of data
                from 1988 to 1997 for Nambour, and employing a six minute time step.
1               4.6.1        Adopted Land Uses

                The modelling guidelines define a range of source nodes reflecting various land use types.
                Based on the descriptions, the land use for the proposed site was modelled as
                'commercial'. The existing situation was also modelled for comparison and, due to the
                disturbed nature of the site in its current state, an 'urban residential' node is appropriate.

                The areas of buildings, car parks, bio-retention reserves and landscaped borders were
                derived from site survey and design plans. Roof areas, car parks, roads and associated

1               hardstands were assumed to be completely impervious, and the bio-retention reserves and
                landscaped areas assumed to be completely pervious.

                4.6.2        Nursery area

                The nursery area has been assumed to be completely impervious, and is included in the
                model as a 'building'. Rainfall on this area will be intercepted either by the concrete
                hardstand or the shade sails. Although a proportion of incident rainfall will permeate
                through the sails and possibly be intercepted by the plants and their containers, this effect
                has been discounted to enable a conservative quantity assessment.

                Information received from Arterra Landscape Architects and from staff at existing Bunnings
                Warehouses suggests that growing plants would be irrigated at a rate of 20 to 25
                millimetres per week. From the proposals, the growing area has been assumed to be
                equivalent to the area under the shade sails; some 970 m .

                Separate from the main treatment train, the growing area was modelled as a completely

r               pervious agricultural node, using a specially prepared rainfall file which simulated the above
                irrigation rate. It was assumed that plants would require irrigation every day for eight
                months, but only every other day for four summer months - a daily rainfall total of 3.6
                millimetres being applied accordingly. Daily pollutant fluxes were exported from this model
                and saved, and applied to the main treatment train model using an 'Imported Data' node.
                The model is shown schematically in Figure 1.

                4.7          Device Sizing
                The vegetated reserves located between the car parking bays will be used to contain the
                main treatment device for the development - a series of long bio-retention devices. The
                car park areas will be graded such that the vast majority of the flow resulting from rainfall
                events of up to the three-month return period will be directed toward the devices. After
                passing through a 500 mm depth of sandy loam filter material, slotted drainage pipes will
                collect the runoff and direct it to the detention basin.



    Bunnings Warehouse                                  Version 1                              15 December 2006
    J \3501-54\WPSWMP tloc                       Commercial in Confidence                               Page 12




t

Page 44

    BUNNINGS WAREHOUSE, NOOSAVILLE
    SURFACE WATER MANAGEMENT PLAN
                                                                                       C"*) Cardnly

t              For the purposes of the modelling, sensible device parameters based on outline quantity
               calculations were input to the model, as described in the table below. If the layout of the
               site changes in future these can be amended to suit, providing that the overall effectiveness
               is maintained. The bio-retention device is modelled as a single large device, for example,
               where in fact several smaller devices of equal total capacity would be employed in the car
               park landscaping divides around the site.

               Table 11         Bioretention Device Parameters



I
                 Parameter                                                      Value

                 Surface Area (m)                                               860

                 Extended Detention Depth (m)                                    0.1

                 Filter Area (m)                                                860

                 Filter Depth (m)                                                0.5

                 Mean Particle Diameter (mm)                                    0.36

                 Saturated Hydraulic Conductivity (mm/hr)                       180

                 Overflow Weir Width (m)                                          2


               Rainwater tanks provide some reduction in nitrogen loads, thought to be via biofilm activity
               within the tank. The reduction in overall runoff through storage and reuse will also minimise
               loads at the site outlet. To enable a conservative quality assessment, only a nominal
               rainwater tank size was used, having a volume of 18kL and a surface area of 8m2. A
               realistic re-use demand of 1250kL per year was applied. This size is conservative given
               the likely rainwater tank size to be adopted (refer Section 5).

               4.8             Modelling Results
               The results of the MUSIC modelling, shown as total annual loads, are presented in the
               table overleaf. It can be seen from the tables that the treatment train would reduce all of
               the total loads released from the developed site to such an extent that the target reductions
               are achieved for all pollutants.

               Table 12         Total Annual Loads

                                            Total Suspended            Total             Total       Total Gross
                            Situation
                                                 Solids             Phosphorus          Nitrogen      Pollutants

                       Existing Site
                                               3,000 kg/yr            6.27 kg/yr        34.1 kg/yr     196 kg/yr
                       (Rural Res)

                      Development
                                               6,880 kg/yr            18.5 kg/yr        106 kg/yr      683 kg/yr
                       Potential

                   Development with
                                                1240 kg/yr            5.20 kg/yr        54.8 kg/yr      0 kg/yr
                     treatment train
                  Realised Reduction              82 %                   72 %             48 %          100 %

                  Target       Reduction          80 %                   60 %             45 %           90 %


               Note that the proposed development, owing to its water sensitive urban design
               measures, produces lower annual pollutant loads than the existing rural residential
               case, for most of the modelled pollutants.


t
    Bunnings Warehouse                                     Version 1                                 15 December 2006
    J.\3501-54\WP\SWMPdoc                            Commercial in Confidence                                 Page 13

Page 45

     RUNNINGS WAREHOUSE, NOOSAVILLE
     SURFACE WATER MANAGEMENT PLAN                                                            C"*-) Carla/no

     5.            IRRIGATION TANK SIZING

                   Historical rainfall data was obtained for Noosa for the period between 1950 and 2002. A
                   yield analysis was conducted, applying the rainfall to the building roof area (accounting for
                   a first flush loss of 0.2mm and an initial loss of 1 mm) to estimate the daily inflow to the tank.

                   The roof area was assumed to be 4600 m2, derived from initial design drawings. In many
                   instances, the fall of the roof and surrounding ground levels dictate that not all of the
                   rainwater can be practicably harvested - for this reason a `half-sized' roof of 2300m2 was
                   also modelled.
11
                   Demands of 2500, 3000 and 3500 litres per day were used. Over a nursery area of
                   approximately 1000 m2, this equates to an irrigation rate of about 2.5, 3.0 and 3.5 mm per
                   day.

                   The model provides an estimate of the demand supplied, expressed as a percentage of the
                   total volume required. Note that it is not a percentage of total time the demand is supplied
                   - although this figure will be similar. The results are shown in Table 13 below.

                   Table 13     Rainwater Tank Performance
                                                          Demand supplied (%) for each tank size (kL)
                     Dema n d : roof a rea
                                              10   20      30         40   50   60       70    80   90    100      150     200

                      2500 Lpd:4600m2         64   79      87         91   94   95       96    97   98    99       100     100
                      3000 Lpd:4600m2         59   74      83         88   91   93       94    96   96    97       99      100
                      3500 Lpd:4600m2         56   70      79         84   88   91       92    94   95    96       98       99

                      2500 Lpd:2300m2         60   75      83         87   90   92       94    95   96    97       99      100

                      3000 Lpd : 2300m2       55   70     78          83   86   89       91    92   93    94       97       99

                      3500 Lpd:2300m2         52   65     73          78   82   85       87    89   90    91       95       97


                   The results are better presented as a graph, as follows:


                                                   Rainwater Tank Performance

                          100

                           95
                           90
                           35                                                                              2500 Lpd. full roof
                                                                                                           3000 Lpd, full roof
                                                                                                           3500 Lpd. full roof
                                                                                                           2500 Lpd, half roof
                                                                                                           3000 Lpd, half roof
                                                                                                           3500 Lpd, half roof




                                             50                 100                150              200

                                                         Tank Size (kL)




     Runnings Warehouse                                       Version 1                                         15 December 2006
     J \3501 54^wp S iP tloc                            Commercial in Confidence                                         Page 14

Page 46

     BUNNINGS WAREHOUSE, NOOSAVILLE
     SURFACE WATER MANAGEMENT PLAN                                                 C") Car dna

                 The final size and design of the tank will depend upon site conditions, and will be confirmed
                 at the detailed design stage. At this stage, some obvious conclusions may be drawn from
                 the data above; increasing the irrigation rate decreases reliability, but larger tanks served
                 by larger roof areas increase reliability.

                 However, these effects cannot necessarily be extrapolated to reach a guaranteed 100%

I                performance target. The vagaries of rainfall mean that in reality, with a sensibly sized tank
                 serving a realistic roof area, some dry periods will be experienced. The commercial cost of
                 this shortfall must be compared with the capital costs inherent in the tank.

                 To conclude, a 100 kL tank could supply a demand of 3500 litres per day with 95%
                 reliability (utilising all of the available roof area). If only 50% reliability is required, then a 10
                 kL tank would suffice (supplied by only half of the roof area). At this point a tank size of
                 100kL is recommended to provide 95% reliability.

                 The model tends towards a conservative assessment in that a daily supply has been
                 modelled. As described in previous sections, in periods of natural rainfall the artificial
                 irrigation demand of the nursery would decrease (watering being required perhaps every
                 other day). This effect would lead to a modest improvement on the above figures.




I




1

I   Bunnings Warehouse
    J \3501-54\WP\SWMP.doc
                                                          Version 1
                                                    Commercial in Confidence
                                                                                                      15 December 2006
                                                                                                                Page 15

Page 47

I   BUNNINGS WAREHOUSE, NOOSAVILLE
    SURFACE WATER MANAGEMENT PLAN
                                                                           C"*-*) Cardna
    6.         MAINTENANCE REQUIREMENTS

              6.1         Construction Phase & Sediment Control

              During the construction phase, the potential exists for significant increases in the
              amount of pollutants, particularly sediment, exported from the site. During this period,
              an Erosion and Sediment Control Plan is required as part of the overall Environmental
              Management Plan prepared for the construction phase. The erosion and sediment
              control plan for the site would be completed in accordance with Soil Erosion and
              Sediment Control, Engineering Guidelines for Queensland Construction Sites
              (Institution of Engineers Australia, 1996).

              The completion of construction activities in accordance with an Erosion and Sediment
              Control Plan developed using the above guidelines will minimise the nature of any
              adverse impacts during the construction phase. It is considered that the appropriate
              time for the preparation of the Erosion and Sediment Control Plan is at the Operational
              works stage. Further, it is expected that the requirement to prepare a plan will be a
              condition of any development approval issued with respect to the site.

              Performance indicators for the construction phase will be set as part of the overall EMP for
              the construction phase and in agreement with Council. Should non-compliance with the
              performance indicators occur, the following corrective actions are to be implemented:

                      •   Identification of the cause of the non-compliance;
                      •   Implementation of appropriate mitigation measures as determined by the
                          Contractor in consultation with the Consultant; and
                      •   Relevant validation monitoring to confirm that the nominated corrective
                          actions have been effective.

              It is envisaged that the detention basin will first be constructed as a sediment basin to treat
              runoff during the construction phase, and the same would apply to the car park landscape
              divides to a lesser extent. At the end of construction, the basin and swales would have any
              accumulated sediment removed and the vegetation installed (and the filter, in the case of
              the bio-retention devices). As there is likely to be a significant pollutant load generated as
              the Warehouse is first opened to the public, it may be necessary to replace the filter media
              at intervals until the vegetation is fully established.

              6.2         Ongoing Maintenance
              The proposed maintenance for the bio-retention systems is drawn from the Melbourne
              Water publication WSUD Engineering Procedures: Stormwater (June 2004, Chapter 6):

                     "The most intensive period of maintenance is during the plant establishment
                     period (first two years) when weed removal and replanting may be required. It
                     is also the time when large loads of sediments could impact on plant growth
                     particularly in developing catchments with poor building controls.




    Bunnings Warehouse                               Version 1                                15 December 2006
    J\3501-54\WRSWMPdoc                        Commercial in Confidence                               Page 16

Page 48

    BUNNINGS WAREHOUSE, NOOSAVILLE
    SURFACE WATER MANAGEMENT PLAN                                                  ll^a^ Cardno

                       Maintenance is primarily concerned with:

                           •       Maintenance of flow to and through the bio-retention basin
                           •       Maintaining vegetation
                           •       Preventing undesired overgrowth vegetation from taking over the bio-
                                   retention basin
                           •       Removal of accumulated sediments
                           •       Litter and debris removal

1                      Vegetation maintenance will include:

                            •      Fertilising plants
                               •   Removal of noxious plants or weeds
                               •   Re-establishment of plants that die.

                      Sediment accumulation at the inlets needs to be monitored. Depending on the
                      catchment activities (eg building phase) the deposition of sediment can tend to
                      smother plants and reduce the ponding volume available. Should excessive
                      sediment build up it will impact on plant health and require removal before it
                      reduces the infiltration rate of the filter media.

                      Similar to other types of practices, debris removal is an ongoing maintenance
                      function. Debris, if not remove, can block inlets or outlets, and can be unsightly
                      if located in a visible location. Inspection and removal of debris should be done
                      regularly, but debris should be removed whenever observed on the site. "

               Given the above, a three monthly inspection frequency is proposed until the catchment has
               become stabilised (i.e. until the development is largely complete). After this time, the
               frequency of inspections can be reduced to every six months or as determined by the
               operational performance of the devices.




C
    Bunnings Warehouse                                        Version 1                         15 December 2006
    J\3501-541WP'SWMPdoc                                Commercial in Confidence                        Page 17




1

Page 49

    BUNNINGS WAREHOUSE. NOOSAVILLE
    SURFACE WATER MANAGEMENT PLAN                                               `,) Cardno

    7.          CONCLUSION

                Bunnings Warehouse plan to develop a new retail outlet in Noosaville, on the corner of the
                Noosa-Eumundi Road and Gateway Drive.

                The development of the site for its commercial use will lead to an increase in impervious
                area across the site (although it should be noted that there is a far greater landscaped area
                across the site than is normally the case for such development types). An increased
                amount of runoff will occur during a storm, which will flow at an increased rate. To alleviate
                flooding problems on site or downstream of it, a detention basin has been provided which
                will detain flows and release them in a controlled manner over time for all flows up to and
                including the 100-year event.

                The key data for the detention basin is summarised below:
                Table 14     Detention Basin Parameters: Summary
                         Parameter                     Value
                           Volume                     1500m
                            Depth                     1200mm
                         Freeboard                    300mm
                      Outlet diameter                 525mm
                        Outlet invert                +300mm
                     Overflow weir width                20m
                     Overflow weir invert            +1150mm

                In order to protect the environmental value of the receiving water body, appropriate
                stormwater treatment measures have been adopted for the site.             Modelling of the
                performance of these measures has indicated that the water quality objectives applicable to
                the site and its watercourse will be met. The proposed treatment measures will reduce the
                total annual load of pollutants entering the creek to meet or exceed standard performance
                targets.

                Discharges from the site will eventually pass to the Noosa River, and so it is important that
                runoff quality be maintained following development. As the human activity expected for the
                site could lead to pollution (particularly from litter and vehicles), bio-retention devices will be
                employed across the car-parking areas of the site to capture nutrients, hydrocarbons and
                gross pollutants. All runoff originating from storms of up to the three month return period
                will undergo treatment by passing through a sandy-loam filter before passing to the
                detention basin.

                This report sizes the detention basin for the site, and suggests water sensitive urban design
                measures to ensure quality is maintained. Quantity modelling of the performance of the
                detention basin indicates that the proposed runoff rate will match the existing in all events
                of up to the 100-year return period. Quality modelling of the treatment train has indicated
                that the water quality objectives applicable to the site will be met in all cases.




r
    Bunnings Warehouse                                   Version 1                                 15 December 2006
    J \3501-54%WP,SWMP doc                         Commercial in Confidence                                 Page 18




1

Page 50

    BUNNINGS WAREHOUSE, NOOSAVILLE
    SURFACE WATER MANAGEMENT PLAN                                         (J) Cardno

                                                                              FIGURES

                Figure 1     Schematic Treatment Train

                Figure 2     Locality Plan

                Figure 3     Existing Site

                Figure 4     Proposed Site and Conceptual Drainage Layout




1




i




I   Bunnings Warehouse
    J 13501-54\WP\SWMP doc
                                                     Version 1
                                               Commercial in Confidence
                                                                               15 December 2006

Page 51

                                                                                              col"')l CarW"97
    BUNNINGS WAREHOUSE, NOOSAVILLE
    SURFACE WATER MANAGEMENT PLAN




               Figure One: Schematic Treatment Trains




                          Building Roof               Car park                    Roads &           Landscape
                           0.7884 ha                  1.1190 ha                  Hardstands
                                                                                 0.2064 Ha          0.2011 Ha




                   I      Rainwater Tank


I                                      Nursery



                                    Bio-retention reserves
                                 1510 m2 surface, 860 m2 filter


I                                                       1
                                                 Detention basin
                                            1500 m3 volume, 1.2 m deep



                                                      Legal point of discharge




               RAFTS


                       Building Roof              Car park            Bioretention            Hardstands        Landscape
                        0.7884 ha                 1.1190 ha            0.1507 ha              0.2064 Ha         0.2011 Ha
                        Impervious               Impervious             Pervious              Impervious         Pervious




                                                                        Detention
                                                                         Basin

                                                                         1500 m3




    Bunnings Warehouse                                               Version 1                                  15 December 2006
    \3501-54\WP\SWMPdoc                                       Commercial in Confidence

Page 52

    BUNNINGS WAREHOUSE, NOOSAVILLE
    SURFACE WATER MANAGEMENT PLAN                                                                        c1>




s
                                                                                         200   0   200   too   500      800      10000
                                                                                                                                     120,000



    ^, C.o ao 010) N'y L:0 All ilgno 1000           d Xffi.
                                                                                                                     Scale 1:20,000 (A4)
    Co•Nlpnl In 0xt Mr010 aM onoy tin of 06 0,0*100 0001.0! .0 L'a,mro 100, Py L10 and
    001 nu 0e 0400, wkf. ym,y0,e0. uyle0 u, ,cu0WUUO in 010.0 0 k, P'a1 o any,rsae, w
    10010, 00 0y mNW.10any00,000000! hyr b,• ap,0000000 MCa,0m X0101 P'y L'0.                                 FIGURE 2
    TMs 00000010 p,asu000 Oy G,Ono ;OM     Py L'0 x01111 b. 1s'-• bmct 01 aM u 000
    Ira 0Mn1 h 001x0'01000:0 0'0, rums 01 tne.rtal0x Copp (qb Py 1:0100000,

    00chivy
     1      rsvr•e am, n•ymvdfy 0! Ax1:i11y 1.001x0.00'0001 nw0 0100 lsilg ax a

    any use 0 ,010000 Jy Ilo p Oaf 0100000' 011100 000x00:
                                                                                                         LOCALITY PLAN
    Rev: Orig.          Date: 15 December 2006                                                                        Project No.:   3501, 54
    Bunnings Warehouse
    All F1 r I \?50'-54\A(AU\%WMP\F,gare
    NR[, ,

Page 53

I
    BUNNINGS WAREHOUSE NOOSAVILLE
    SURFACE WATER MANAGEMENT PLAN




s




                                                    '0   C   '0   20   3C   4.   55.

                                                                                             Scale 1 1000 (A3)
                                                                                            FIGURE 3
    ..   .fin-.Nwl .rw.uw ♦
                              ^ao:w... we.q r..ra                                      EXISTING SITE
                                                                                       Project No .   3501 54
    Burrwngs Wereharse

Page 54

I
r,   BUNNINGS WAREHOUSE. NOOSAIALLE
     SURFACE WATER MANAGEMENT PLAN




U
                                                              BIORETENTION DEVICES
                                                                  IN LANDSCAPED
                                                                 CARPARK DIVIDES




t
1




I


1
I
                                                                        m
                                                                                                           Scale 1:1000 (A3)
                                                                                                        FIGURE 4
                                                                                              PROPOSED SITE AND
                                                                                     CONCEPTUAL DRAINAGE LAYOUT
     Rev: O. Dale: 15 December 2008                                                                  Project No :   3501'54
     Bun ngs Wamhaae
     ^*0,t, ^.,   .. r*0stwv nt ..wn t...4t..r.. o.w,.rw w.

Page 55

    BUNNINGS WAREHOUSE, NOOSAVILLE
    SURFACE WATER MANAGEMENT PLAN                               C"o) Cardno

                                                                   APPENDIX A




                                                                  RAFTS Results




1

I



t

I


    Bunnings Warehouse                     Version 1                   15 December 2006
    J 3501- 54\WRSWMP doc            Commercial in Confidence



t

Page 56

'   RUNNINGS WAREHOUSE, NOOSAVILLE                                                   ^
    SURFACE WATER MANAGEMENT PLAN                                                                   Carcin0


I
                              100 YEAR                                                    10 YEAR
                      existing       proposed     basins                             existing       proposed    basins
            bios         0.347           0.9375   0.9375                      bios    0.2222           0.6919   0.6919


I        grn cnr
         carpark
            roof
                           0.7848
                           0.3011
                           0.2264
                                          1.816
                                         0.9242
                                         0.6863
                                                  0.6087
                                                  0.9242
                                                  0.6863
                                                                         grn cnr
                                                                         carpark
                                                                            roof
                                                                                      0.5084
                                                                                      0.1907
                                                                                      0.1468
                                                                                                        1.338
                                                                                                       0.6854
                                                                                                       0.5215
                                                                                                                0.3959
                                                                                                                0.6854
                                                                                                                0.5215
       hrdstand            0.0719        0.1721   0.1721                hrdstand      0.0436           0.1281   0.1281
     landscape             0.0703        0.0656   0.0656               landscape      0.0426           0.0405   0.0405
             END           0.7848         1.816   0.6087                    END       0.5084            1.338   0.3959

                                       BASIN                                                        BASIN
                                    Max Stg m    1.164                                           Max Stg m       0.802
                                    Max Vol m' 1454.6                                            Max Vol m3 1002.3


                              50 YEAR                                                      5 YEAR
                      existing       proposed     basins                             existing       proposed    basins
            bios           0.3071       0.8528    0.8528                      bios    0.1958           0.6222   0.6222
         grn cnr           0.6976         1.653   0.5126                  grn cnr     0.4459           1.199    0.3507
         carpark           0.2654        0.8409   0.8409                 carpark      0.1678          0.6168    0.6168
            roof           0.2021        0.6285   0.6285                     roof     0.1273          0.4655    0.4655
       hrdstand            0.0618         0.157    0.157                hrdstand      0.0383           0.116     0.116
     landscape             0.0603        0.0574   0.0574               landscape      0.0374          0.0355    0.0355
             END           0.6976         1.653   0.5126                    END       0.4459           1.199    0.3507


                                         BASIN                                                      BASIN
                                    Max Stg m    1.057                                           Max Stg m       0.721
                                    Max Vol m3 1321.1                                            Max Vol m3 900.93


                              20 YEAR                                                       1 YEAR
                      existing       proposed     basins                             existing      proposed     basins
             bios          0.2595        0.7897   0.7897                    bios        0.097         0.3929    0.3929
         grn cnr           0.5943         1.523   0.4513                 grn cnr      0.2244          0.7593    0.1978
         carpark           0.2244        0.7812   0.7812                 carpark      0.0806          0.3895    0.3895
            roof           0.1724        0.5914   0.5914                     roof     0.0587          0.2866    0.2866
       hrdstand            0.0513        0.1436   0.1436                hrdstand      0.0222          0.0725    0.0725
     landscape             0.0504        0.0478   0.0478               landscape      0.0217          0.0205    0.0205
          END              0.5943         1.523   0.4513                    END       0.2244          0.7593    0.1978

                                         BASIN                                                        BASIN
                                    Max Stg m      0.915                                        Max Stg m   0.459
                                    Max Vol m3 1143.5                                           Max Vol m3 574.32




    Bunnings Warehouse                                     Version 1                                   15 December 2006
    J%35o1-541WP%SWMPdoc                           Commercial in Confidence

Page 57

    BUNNINGS WAREHOUSE, NOOSAVILLE
    SURFACE WATER MANAGEMENT PLAN                               C*04) Cardno

1                                                                    APPENDIX B



1

                                                                MUSIC Parameters

1




I




    Bunnings Warehouse                     Version 1                    15 December 2006
    JS3501-54\WP\SWMPdoc             Commercial in Confidence

Page 58

    BUNNINGS WAREHOUSE, NOOSAVILLE
    SURFACE WATER MANAGEMENT PLAN                                                          J) Cardno

                Runoff Generation Parameters

                  Parameter                                      Urban                 Commercial

I                 Field Capacity (mm)
                                                               Residential
                                                                      200                    80
                  Infiltration Capacity Coefficient a                 50                    200

                  Infiltration Capacity Exponent b                     1                      1

                  Rainfall Threshold (mm)                              1                      1

                  Soil Capacity (mm)                                  400                    120
                  Initial Storage (%)                                 10                     25

                  Daily Recharge Rate (%)                             25                     25

                  Daily Drainage Rate (%)                              5                      5



t                 Initial Depth (mm)                                  50                     50



                Pollutant Export Relationships

                  Land Use      Parameter       Total Suspended                Total Phosphorus      Total Nitrogen
                  Source                         Solids (mg/L)             i         (mg/L)                 (mg/L)
                  Nodes
                                               Base           Storm            Base       Storm     Base             Storm
                                            L_^Flow            Flow            Flow       Flow      Flow              Flow

                  Urban         Mean            0.10           2.18            -0.97      -0.47     0.20             0.26
                  Residential
                                Std Dev.        0.34           0.39            0.31        0.31     0.20             0.23
                  Commercial    Mean            0.78           2.16            -0.60      -0.39     -0.32            0.37
                                Std Dev.        0.39           0.38            0.50        0.34     0.30             0.34




t
t


P
L



I
I   Bunnings Warehouse
    J \3501-54\WP\SWMP doc
                                                               Version 1
                                                        Commercial in Confidence
                                                                                                              15 December 2006

Page 59

I
     BUNNINGS WAREHOUSE, NOOSAVILLE
     SURFACE WATER MANAGEMENT PLAN
                                                                 111(4^ Cardno

F1
                                                                     APPENDIX C


I
                                                Statement of Landscape Intent



1
I
I


I

I



     Bunnings Warehouse                     Version 1                   15 December 2006
     J 13501-54\WP\SWMP doc           Commercial in Confidence

Page 60

    statement of                                                                                 == t-_ r= rr=
    landscape intent

    BUNNINGS NOOSAVILLE
    Cnr Eumundi- Noosa Drive and Gateway Drive, Noosaville, QLD
    11 December, 2006


    The design of the Bunnings at Noosaville incorporates water related initiatives and
    water sensitive urban design principles that are reflected and implemented in the
    landscape design. The simple yet "graphic" landscape design embraces the "Noosa
    Style" in terms of its species selection. The area devoted to soft landscaping is
    substantially greater than in other comparable developments. Screening and visibility
    of the store have been carefully considered to achieve a suitably balanced outcome.

    It should be noted that the site levels and soil profiles have been substantially altered
    for almost the entire site and thus bear no resemblance to the natural circumstance
    ideally suited to supporting indigenous vegetation.

    Low maintenance plants not requiring pruning will be used. The majority of the plants
    proposed will be native.

    The landscape design of the various components of the site is described as follows

    Water Related Design Principles
    The following solutions address the increasingly important issue of water on the site.

    Water will be collected from the large roof area and stored in large tanks. It will be
    used for nursery irrigation, external washing down and at times for landscape
    irrigation. It is intended that no mains water will be used for these purposes.

    Except for black water (ie toilets and kitchens), all water leaving the site will be bio-
    filtered through the landscape. All nutrient rich nursery irrigation runoff will be reused
    for landscape irrigation thus reducing the need for tank or mains water use and
    minimising the need for added fertiliser application.

    Subsoil drains will collect any excess irrigation groundwater. It will be passed through
    a bio-retention system located in a highly publicly visible location at the corner of
    Eumundi-Noosa Road and Gateway Drive. This area will also be used for stormwater
    detention on the site.

    Carpark surface water runoff will not be collected in surface pits for immediate
    discharge to Council's stormwater network. It will all first be passed through planting
    areas and biofiltered. The carpark is graded to fall towards the wide planted islands


I   surrounded by "hit and miss" kerbs. This will ensure gross pollutants are collected on
    the edge of the planting areas where they are visible and will be collected and
    disposed off. Potentially hydrocarbon contaminated water will be passed through
    specially formulated planting soil for pre-treatment. Plants will be watered and
    irrigation needs reduced. In the majority of storm events the water holding capacity of
    the soil will result in significant buffering of stormwater discharge from the site due to
    the holding of water in the substantial air space within the soil structure. Excessive
    storm volumes, beyond the water holding capacity of the soil, will be collected in a
    subsoil system and held in the large detention area in the south west corner of the site.

    Plants used will generally have low water requirements. They will be substantially
    native species. Gravel will be used instead of turf to reduce water and ongoing
    maintenance needs. No turf is proposed on the site or in the verge.



                                                                                                 ARTERRA DESIGN PTY LTD ABN 40 069 552 610
                                                                                                 SUITE 2 1 22 CONSTANCE ST, FORTITUDE VALLEY OLD 4006
                                                                                                 P 07 3100 8839 F 07 3257 4320 W ARTERRA.COM,AU

Page 61

    Eumundi-Noosa Road Frontage
    The existing streetscape is of poor quality. There is currently no footpath. A concrete
    footpath will be installed along the length of this frontage.

    Many existing native trees along the boundary will be retained and protected. The
    proposed footpath will be kept clear of the trees and existing levels around them kept
    unchanged to minimise any potential damage to the trees. In particular, the large
    Eucalypts in the south-east corner of the site will be retained with the proposed
    delivery dock access road angled to maximise their root zone. This protected root zone
    will also provide space for substantial new screen planting.

    Tear drop shaped planted mounds in differing coloured bands of gravel provide a
    visual separation between the roundabout and the proposed nursery in the very
    generous setback provided. Alternate mounds will be planted with one of Noosa's
    signature plants, the Pandanus and potentially other visually striking feature plants.
    The nursery has been set down approx. 1.5m below the verge level to further reduce
    its visual presence on the street.

    The main vehicle entry to the site from the roundabout will be flanked by large canopy
    trees and pedestrian access paths. Sight lines at the vehicle entry / exit points will be
    maintained for safety. Car parking is set a significant distance back from the boundary
    behind the corner bio-retention system and soft landscaping.

    More tear drop shaped planted mounds punctuate the large landscape setback area on
    the corner of Eumundi-Noosa Road and Gateway Drive. This area will include bands of
    planting and ornamental gravels and will act as both a bio-retention and stormwater
    detention area. An existing stand of native trees on Council's verge in this corner
    (currently in reasonably poor condition) will be retained.

    Gateway Drive Frontage
    Once again the existing streetscape is of poor quality. This will be improved with the
    inclusion of a simple curvaceous edge between a low maintenance and no water use
    gravel verge and bands of planting and ornamental gravel leading into the site. A
    Swale runs along the boundary at the bottom of the slope from the car park above.
    This Swale conveys any stormwater water leaving the site and entering Council's
    stormwater network. The slope is planted with native shrub and groundcover species
    screening a varying height retaining wall near the top of the slope. Native canopy trees
    (eg Tuckeroos) line this frontage providing shade and screening parked cars.

    Sight lines at the vehicle entry / exit points will be maintained for safety.

    Car park
    The car park's key landscape design feature is the wide central planting strips between
    cars. These strips provide very substantial consolidated soil areas (far greater than 5m2
    as required by Council) allowing shade trees to reach their maximum potential size.
    Shade trees (ie Tuckeroos) have been provided at every fourth parking space as
    required by Council. The trees are located to avoid damage from cars. These trees will
    reduce the visual impact of the building and the car park. Car park shading will reduce
    the potential heat island effect generated.

    The car park generally falls at 1:40 from the store entry in the east down towards the
    west. This allows disabled and trolley access to all areas of the car park. "Hit and
    miss" kerbs along the high side of each planting strip allow surface runoff to enter the
    planted areas containing a mix of native and exotic shrub and groundcover species. A
    drainage Swale through this area will collect and temporarily store excess runoff before
    conveying it to the detention basin via subsurface pipes. Trees, shrubs and
    groundcovers will receive supplementary water from car park runoff.

    The ends of the central planted islands are planted with feature trees (ie Pandanus)
    with limited canopies to minimise potential damage from larger vehicles using these
    main access routes.




                                                                                                                    Arterra



I   Revision P1, Issued for DA, 11 December 2006
                                                                                                         Bunnings Noosaville
                                                                                                Statement of Landscape Intent
                                                                                                                     Page 2

Page 62

t   Pedestrian access through the carpark is via clearly delineated ramps (allowing
    disabled access) and main paths. Minor access routes through the wide planting strips
    are accommodated with steppers between the trees.

I   Northern Boundary
    Native tree species will line the western end of this boundary and the entry / exit lane
    forming a consistent vertical screento the neighbouring site to the north. These trees
    will be planted in a wide sloping garden visually buffering the northern edge of the car
    park.

    Irrigation
    Mains water will not be used for landscape irrigation on the site. Planting within the
    site will be able to be irrigated with an automatic sub-surface irrigation system using
    water reused from the nursery runoff (or collected from the building roof where
    absolutely necessary). This sub-surface system will ensure the reused water is not in
    contact with customers and eliminates the loss of water into the atmosphere typical of
    above ground spray heads. All nursery runoff will be collected and dissipated into the
    landscape via the irrigation system on a daily basis.

    Conclusion
    The landscape design provides substantial areas for mainly native tree and shrub
    planting ensuring the proposed building and car park are partially screened from view


I   and their scale reduced while maintaining some visibility of the development for
    commercial reasons.


    Regards




    Paul Hardyman
    Director, Registered Landscape Architect, Consulting Arborist


I   [email protected]




I
I




1
                                                                                                                   Arterra



I   Revision P1, Issued for DA, 11 December 2006
                                                                                                        Runnings Noosaville
                                                                                               Statement of Landscape Intent
                                                                                                                    Page 3

Page 63

    APPENDIX C - DRAINS DATA & RESULTS




I
I
                    16


[OCR of page images]
 

APPENDIX C — DRAINS DATA & RESULTS

16

 

 

Page 64

-, m                                                                                                         _ 'L) ' HYMWGIC PWYDf                                                              MOMMG                    _
                                                                                                                                                                 INPUT DATA


PIT / NODE DETAILS                        Version 9
Name      Type            Family          Size              Ponding         Pressure        Surface          Max Pond Base               Blocking        x               y              Bolt-down id                 Part Full
                                                            Volume          Change          Elev (m)         Depth (m) Inflow            Factor                                         lid                          Shock Loss
                                                            (cu.m)          Coeff. Ku                                     (cu.m/s)
N6        Node                                                                                          13                           0                       116.383         110.751                            15
N3        Node                                                                                          10                           0                         64.474          -2.506                           8


DETENTION BASIN DETAILS
Name      Elev            Surf. Area Init Vol. (ct Outlet Typ• K                            Dia(mm)          Centre RL Pit Family Pit Type               x               y              HED          Crest RL        Crest Lengi id
Basing             8.6             615            61.5 Culvert                        0.5                                                                        88.94         14.148 No                                                     6
                   8.7             615
                   9.5             615
                   10.5            615
                 10.85             615
                   10.9          10000


SUB-CATCHMENT DETAILS
Name      Pit or          Total           Paved             Grass           Supp            Paved            Grass        Supp           Paved           Grass           Supp           Paved        Grass           Supp            Paved       Grass   Supp    Lag Time       Gutter   Gutter   Gutter
          Node            Area            Area              Area            Area            Time             Time         Time           Length          Length          Length         Slope(%)     Slope           Slope           Rough       Rough   Rough   or Factor Length        Slope    FlowFactor
                          (ha)            %                 %               %               (min)            (min)        (min)          (m)             (m)             (m)            %            %               %                                                          (m)      %
                                  2.327           80.4               19,6               0               15           30              0                                                                                                                                      0

PIPE DETAILS
Name      From            To              Length            U/S IL          D/S IL          Slope            Type         Dia            I.D.            Rough           Pipe Is        No. Pipes    Chg From At Chg                 Chg         RI      Chg     RL             etc
                                          (m)               (m)             (m)             (%)                           (mm)           (mm)                                                                                        (m)         (m)     (m)     (m)            (m)
Pipe3     N6              Basin2                       10          10.55             10.5             0.5 Concrete, r             750              750             0.3 NewFixed                     1 N6                         0
Pipel     Basin2          N3                            7             8.7            8.63                1 Concrete, r            450              450             0.3 NewFixed                     1 Basin2                     0

DETAILS of SERVICES CROSSING PIPES
Pipe      Chg             Bottom          Height of S Chg                   Bottom          Height of S Chg               Bottom         Height of S etc
          (m)             Elev (m)               (m)        (m)             Elev(m)               (m)        (m)          Elev(m)                (m)     etc


CHANNEL DETAILS
Name      From            To              Type              Length          U/S IL          D/S IL           Slope        Base Widtf L.B. Slope R.B. Slope Manning                      Depth         Roofed
                                                            (m)             (m)             (m)              (%)          (m)            (1:?)           (1:?)           n              (m)

Page 65

                                                   'DRAINS' HYDROLOGIC AND HYDRAULIC MODELLING
                                                                MINOR RAINFALL RESULTS
      DRAINS results prepared 21 March, 2011 from Version 2010.10


      PIT / NODE DETAILS                                          Version 8
      Name         Max HGL Max Pond Max Surfac Max Pond Min                                      Overflow     Constraint
                                   HGL            Flow Arrivii Volume             Freeboard (cu.m/s)
                                                  (cu.m/s)        (cu.m)          (m)
      N6                  11.12                            0.85
      N3                    9.03                              0


      SUB-CATCHMENT DETAILS
      Name         Max             Paved          Grassed         Paved           Grassed        Supp.        Due to Storm
                   Flow Q          Max Q          Max Q           Tc              Tc             Tc
                   (cu.m/s)        (cu.m/s)       (cu.m/s)        (min)           (min)          (min)
      Catl                  0.85         0.804            0.047              15             30              0 AR&R 10 year, 20 minutes storm, average 128 mm/h, Zone 3




      Outflow Volumes for Total Catchment (1.87 impervious + 0.46 pervious = 2.33 total ha)
      Storm        Total Rainf. Total Runo Impervious Pervious Runoff
                   cu.m            cu.m (Runt cu.m (Runc cu.m (Runoff %)
      AR&R 5 ye;      391.71 301.50 (77 296.23 (94 5.27 (6.9%)
      AR&R 5 yei      605.02 482.98 (79 467.73 (96 15.25 (12.9%)
      AR&R 5 yei      892.02 734.49 (82 698.47 (97 36.01 (20.6%)
      AR&R 5 yei     1096.02 914.99 (83 862.49 (97 52.50 (24.4%)
      AR&R 5 ye;     1505.57 1271.35 (8, 1191.77 (9.79.59 (27.0%)
      AR&R 5 yei     1991.91 1654.79 (8. 1582.79 (9.72.00 (18.4%)
      AR&R 10 yl      432.43 336.73 (77 328.97 (94 7.76 (9.2%)
      AR&R 10 yi      670.95 543.40 (81 520.74 (96 22.67 (17.2%)
      AR&R 10 yt      992.85 833.22 (83 779.54 (97 53.68 (27.6%)
      AR&R 10 yl     1221.67 1037.99 (8' 963.52 (98 74.47 (31.1%)
      AR&R 10 yl     1682.42 1441.94 (8'1333.96 (9,107.99 (32.7%)
      AR&R 10 yl     2252.54 1901.79 (8, 1792.33 (91109.46 (24.8%)


      PIPE DETAILS
      Name         Max Q           Max V          Max U/S         Max D/S         Due to Storm
                   (cu.m/s)        (m/s)          HGL (m)         HGL (m)
      Pipe3                 0.85            2.4         11.116         11.066 AR&R 10 year, 20 minutes storm, average 128 mm/h, Zone 3
      Pipel               0.373             2.5           9.139           9.033 AR&R 10 year, 1 hour storm, average 72.3 mm/h, Zone 3


      CHANNEL DETAILS
      Name         Max Q           Max V          Chainage        Max             Due to Storm
                   (cu.m/s)        (m/s)          (m)             HGL (m)


      DETENTION BASIN DETAILS
      Name         Max WL          MaxVol         Max Q           Max Q           Max Q
                                                  Total           Low Level High Level



t     Basing




      Node         Inflow
                            9.74         701.1




                                   Outflow
                                                          0.373         0.373


      CONTINUITY CHECK for AR&R 10 year, 20 minutes storm, average 128 mm/h, Zone 3
                                                  Storage Ch Difference
                                                                                             0




                   (cu.m)          (cu.m)         (cu.m)          %
      N6              833.22          833.22                  0               0
      Basing          833.22          808.26              -5.79             3.7
      N3              597.96          597.96                  0               0


      Run Log for 4400 run at 14:36:31 on 21/3/2011




P11
                                                                       K-\AA Great Plains lobs\4400(Bunnmgs Noosa)\02 (Cirri)\Admin\WSUD\Admin\4400.02(MUSIC & DRAINS Modelling Results Summary)

Page 66

                                                  'DRAINS' HYDROLOGIC AND HYDRAULIC MODELLING
                                                                                 MAJOR RAINFALL RESULTS
    DRAINS results prepared 21 March, 2011 from Version 2010.10


    PIT / NODE DETAILS                                          Version 8
    Name         Max HGL         Max Pond Max Surfac Max Pond Min                                Overflow     Constraint
                                 HGL            Flow Arrivi Volume              Freeboard        (cu.m/s)
                                                (cu.m/s)   (cu.m)               (m)
    N6                 11.29                         1.231
    N3                    9.07                              0


    SUB-CATCHMENT DETAILS
    Name         Max             Paved          Grassed         Paved           Grassed          Supp.        Due to Storm
                 Flow Q          Max Q          Max Q           Tc              Tc               Tc
                 (cu.m/s)        (cu.m/s)       (cu.m/s)        (min)           (min)            (min)
    Catl               1.231           1.143            0.091             15                30              0 AR&R 100 year, 20 minutes storm, average 185 mm/h, Zone 3




    Outflow Volumes for Total Catchment (1.87 impervious + 0.46 pervious = 2.33 total ha)
    Storm        Total Rainf Total Runo Impervious Pervious Runoff
                                 cu.m (Runt cu.m (Runt cu.m (Runoff %)
    AR&R 20 yo      490.61 387.84 (79 375.74 (95 12.10 (12.6%)
    AR&R 20 y'      760.15 627.45 (82 592.45 (96 35.00 (23.5%)
    AR&R 20 yo     1124.72 962.88 (85 885.56 (97 77.32 (35.1%)




I
    AR&R 20 ye     1384.56 1197.91 (81094.48 (9,103.43 (38.1%)
    AR&R 20 yi     1924.43 1676.76 (8 1528.53 (9 148.23 (39.3%)
    AR&R 100        622.47 507.35 (81 481.76 (96 25.59 (21.0%)
    AR&R 100        969.58 831.30 (85 760.83 (97 70.47 (37.1%)
    AR&R 100,      1434.98 1267.90 (8 1135.02 (9.132.89 (47.2%)
    AR&R 100'      1768.52 1571.86 (81403.18 (9.168.68 (48.7%)
    AR&R 100'      2489.89 2227.19 (8 1983.16 (9' 244.03 (50.0%)
    AR&R 100'      3420.69 3037.21 (8. 2731.52 (9' 305.69 (45.6%)


    PIPE DETAILS
                 Max Q           Max V          Max U/S         Max D/S         Due to Storm
                 (cu.m/s)        (m/s)          HGL (m)         HGL (m)
    Pipe3              1.231                3         11.295         11.156 AR&R 100 year, 20 minutes storm, average 185 mm/h, Zone 3
    Pipel              0.507              3.2            9.23            9.07 AR&R 100 year, 1 hour storm, average 107 mm/h, Zone 3


    CHANNEL DETAILS
    Name         Max Q           Max V          Chainage        Max             Due to Storm
                 (cu.m/s)        (m/s)          (m)             HGL (m)


    DETENTION BASIN DETAILS
    Name         Max WL          MaxVol         Max Q           Max Q           Max Q
                                                Total           Low Level High Level
    Basing             10.39           1102.5           0.507           0.507                0


    CONTINUITY CHECK for AR&R 100 year, 20 minutes storm, average 185 mm/h, Zone 3
    Node         Inflow          Outflow        Storage Ch Difference
                 (cu.m)          (cu.m)         (cu.m)          %
    N6              1267.9          1267.9                  0               0



1
    Basing          1267.9         1209.89              22.81             2.8
    N3              999.58          999.58                  0               0


    Run Log for 4400 run at 14:40:53 on 21/3/2011




                                                                         K.\AA - Great Piains lobs\4400 (Bunnings Noosal\021Cn,IIAdm,n\WSUD\Admm\<40o-011MUSAC & DRAINS Modelling Rewhs Summary)

Used in these records

About this file

File size
10.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Request to Change Current Application.pdf · 10.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.