SURFACE WATER MANAGEMENT PLAN 11(4^ Car-dno
As the development is commercial in character, the water quality parameters of relevance
to the site are suspended solids, nutrients (nitrogen and phosphorus), litter, faecal coliforms
and hydrocarbons. Of these parameters, the detailed modelling of litter, faecal coliforms
and hydrocarbons is not possible at present using the industry standard analysis package
(MUSIC) due to the lack of information regarding export rates. The modelling of defined
water quality objectives has therefore necessarily focused on suspended solids and
t nutrients (nitrogen and phosphorus).
Previous versions of the MUSIC modelling software were able to achieve State and
international objectives through the use of a suitably sized treatment train. However,
1 following a software update in 2005 to correct an error in the modelling of bio-retention
basins, the new 'background' concentrations used in version 3.01 of the software are
higher than the published water quality objectives. No matter how efficient the treatment
train employed to serve the development, or the number of devices employed, it will not be
possible to achieve the concentrations listed in Table 2.
Further, it should be noted that the values presented in the Guidelines represent desirable
s water quality in the watercourse, rather than the quality of the discharge to it. While
specifying such values would guarantee that acceptable aquatic concentrations are
obtained, such an approach is highly conservative and unrealistic if it is not possible to
demonstrate that the objectives can be achieved, even with the latest modelling software
I and treatment technology.
The EPA Guidelines (in Section 4.3 on Page 51) state that 'a very important point to note is
that although guidelines provide technical input to the development of WQOs or targets,
they are not necessarily the same values as the finally adopted WQOs. The final
WQOs take into account social, economic and current condition factors. These may dictate
that achieving the actual guideline value is economically or technically unacceptable and
that therefore the WQO should be set at some less stringent value. Hence the WQOs
ultimately adopted might be the same as, or different from, the technical guideline values,
depending on community and economic considerations.'
I Alternative water quality objectives are clearly necessary. In recognition of the above,
many Local Authorities have adopted load-based objectives. These require the
development to achieve:
• an 80 % reduction in suspended solids;
• a 60 % reduction in total phosphorus;
• a 45 % reduction in total nitrogen; and,
• a 90 % reduction in gross pollutants
when compared to unmitigated urban development.
This approach has recently been ratified in Healthy Waterways' Water Sensitive Urban
Design Technical Design Guidelines for South East Queensland (June 2006). These load
1 based reduction objectives were therefore employed for this report.
I Bunnings Warehouse
J\3501-54\WP\SWMP doc
Version 1
Commercial in Confidence
15 December 2006
Page 11
1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Request to Change Current ApplicationRelated documentApplication case desk ↗
About this file
- File size
- 10.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.