Original source · versioned page text
Negotiated Decision Notice MCU21 0110.pdf
“fp e the Disability Standards for Accessible Public Transport 2002 - subsection 31(1) of the Disability Discrimination Act 1992; (ii) include lighting in accordance with AS/NZS 1158.3.1— Lighting for Roads and Public Spaces, Part 3.1: Pedestrian Area (Category P) Lighting — Performance and Design Requirements; and (iii) provide access and hardstand, and shelter with seats, for waiting and boarding/alighting passengers. RPEOQ certification, with supporting documentation, must be provided to the Program Delivery and Operations Unit, North Coast Region ([email protected]) within the Department of Transport and Main Roads confirming that the development has been designed and constructed in accordance with parts (a) and (b) of this condition. (a) A RPEO certified Traffic Management Plan must be prepared and given to the Program Delivery and Operations Unit, North Coast Region (via [email protected]) within the Department of Transport and Main Roads. (b) The Traffic Management Plan must demonstrate how operation of the porte cochere will be monitored and managed to ensure safe movement of vehicle and pedestrians, in particular when a 14.5m coach is traversing the porte cochere when other vehicles are utilising the same. (c) The operation of the development must be undertaken in accordance with the Traffic Management Plan. State Assessment and Referral Agency Document Set ID: 23976352 Version: 3, Version Date: 30/07/2025 2107-23530 SRA (a) & (b) Prior to the commencement of use, and where on site, to be maintained at all times (c) At all times during operation. Page 7 of 9 Page 24 of 53
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Negotiated Decision Notice MCU21 0110.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.