Original source · versioned page text
Negotiated Decision Notice MCU21 0110.pdf
DA 3.03 15 Part 2 Sections, prepared by Marchese 06.02.2025
Partners
DA 4.01 12 Extrapolated 8m & 12m above NGL plane, 06.02.2025
prepared by Marchese Partners
DA 4.05 12 3D View – Building Entry, prepared by 06.02.2025
Marchese Partners
DA 4.06 11 3D View – Pool View 1, prepared by Marchese 06.02.2025
Partners
DA 4.07 11 3D View – Pool View 2, prepared by Marchese 06.02.2025
Partners
DA 4.08 11 3D View – Looking North from Resort Drive, 06.02.2025
prepared by Marchese Partners
LCP2 – M Landscape Concept Design Package 21.02.2025
LCP18 prepared by Place Design Group
N/A 1 Terrestrial Ecology Assessment prepared by
Gondwana Ecology dated 26.02.2020 and as
amended by letter from Gondwana Ecology
dated 9 February 2023
N/A 8 Bushfire Hazard Assessment and Mitigation 25.02.2025
Plan prepared by Rob Friend & Associates
Nature and Extent of Approved Use
3. The approved resort units must be used for short term visitors only. The approved units must
not be occupied by persons for the purpose of permanent accommodation, excluding those
persons in a manager's residence for the premises. The requirements of this condition must
be included in the Community Management Statement for any body corporate for the subject
site.
4. The approved uses and associated activities must not result in environmental nuisances
such as noise, visual or odour impacts that unreasonably diminish the amenity of the area or
surrounding uses.
5. Service vehicle movements associated with non-residential uses on the premises (including
loading and unloading) must not occur outside the hours of 7am to 6pm Monday to Saturday
and not at all on Sundays or public holidays. The requirements of this condition must be
included in the Community Management Statement for any body corporate for the subject
site.
6. Conferences and Functions must only occur within the existing Noosa Springs Golf and Spa
Resort.
Currency Period
7. This development approval lapses if the use has not happened by 29 July 2031 unless an
application to extend the currency period is approved by Council.
Page 3 of 53
Document Set ID: 23976352
Version: 3, Version Date: 30/07/2025
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Negotiated Decision Notice MCU21 0110.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.