NOOSA Checklist - Applications Involving Land Development & Land Use Sections Se IDAS APPLICATION This checklist should be used for any IDAS application. Please check each of the following items before accepting an application at the counter. ~ . -: ” 41. APPLICATION FORMS | 1.4. Form PartA 1.1.4 Ensure that the form is fully completed. 1.1.2 In the case of an MCU or Op Works below the high-water mark, owners consent is required. 4.1.2.1 If there are multipte owners, the consent of each owner is required. 4.1.2.2 If the owner of the land is a company, either ACN No. or Company Seal required. 1.2 Form! Part B-O Supporting information 1.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-O are attached. [] 4.1.2.1. Ensure that each of Forms B-O which are attached are fully completed. [| 2. REFERRALINFORMATION” 7 0) 0 cee wwe wm at a ag 2.1 Ensure that items 1-23 have been checked and/or completed with regard to referrals. wr 3. ~ ENVIRONMENTALLY RELEVANT ACTIVITIES: ~ (77 3.1 Ensure that Part G is completed if EPA referral is required. 7 3.2 Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application fee is paid and recorded on the application. ‘4. ' FORM 2’. REQUEST.TO CHANGE APPROVAL 7 es 4.1 Ensure that items 1-28 have been checked and/or completed including information regarding applicant details and owners consent. ve 5. PLANS * 0 US eh SRNR amen Be Bee BO 5.1 Ensure that at least 6 sets of the Plan of Development (5 for Reconfiguration and Operational Works) accompanies the application. In addition ensure that each set is complete. §.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is - Ee [i | unbound. cama = Pr ee ce ne cc} 6.. ‘SUPPORTING INFORMATION: 7” ee LAL EEE as 6.1 Ensure that at least 6 copies of any report accompanies the application (5 for Reconfiguration and Operational Works). If the application is accompanied by a covering tetter, ensure that it is capable of reproduction. 6.2 In the case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound. FEET: segs ae -rngy ppemnen 0 sy as enn mans A meni 9 ae mnt. er aye a te TOR 7.1 Ensure that the application fee, as determined from the Council’ s adopted scale of fees, accompanies the application or has been paid. — 7.2 Ensure that the fee which has been paid is recorded on the application form. | Receiving Officer >... LenS Having completed this form and accepted the trays:- ¢ Ifthe application is for a Materlal Change of Use exclusively -AOP1's desk in the Land Use Section. ¢ — Ifthe application is for an Material Change of Use & Reconfiguration - AOP1’s desk in the Land Use Section. «Ifthe application is for Operational Works (for parking, access, sewerage or drainage) exclusively - AOD2 in the Land Development Section. « Inall other circumstances - AOP1’s desk in the Land Use Section. Please DO NOT leave the application at the counter and DO NOT deliver the application to Records. plication, please deliver both to the following IDAS Application Receiving SEP! g:\antYorms\application checklist.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 22 pages
Page 2
<z, Ome
Py lid
RESIDENTIAL PLANNING CONS U
The Chief Executive Officer
Noosa Shire Council
PO Box 141
Tewantin QLD 4565
CODE ASSESSABLE DEVELOPMENT APPLICATION
DEVELOPMENT APPLICATION — 1 TRISTANIA DRIVE, MARCUS BEACH
Described as Lot 99 on M11112 Parish of Weyba
@ We lodge the attached application in accordance with section 3.2.1 (6) of the
Integrated Planning Act 1997 (IPA) being the mandatory information required for a
properly made application for the purpose of an extension to an existing dwelling
house.
Under the current Noosa Plan 2006 the site is located in the Eastern Beaches Locality,
Detached Housing Zone and is also included within the Coastal Protection, and Landslide
Hazard Area Overlay. As a consequence of the Overlays affecting the subject site, an
application to construct a Dwelling House will be Code Assessable.
The proposal will have no adverse impacts upon the existing road network, nor will any
adverse impact occur on adjoining residents. The proposal is minor in nature and is
required to cater for the growing needs of the existing residents.
The required information is as follows:-
3.2.1 (1) -— Application has been made out to the appropriate Assessment
e} Manager.
3.2.1 (2)- The application has been made using the Integrated Development
Assessment System approved forms.
3.2.1 (3) | The mandatory information including
(i) An accurate description of the land to which the application
relates.
(ii) Consent of the Owner.
3.2.1 (4)— | The appropriate fee set by Noosa Shire Council under the Development
Assessment and Compliance Fees 2007 / 2008. .
3.2.1 (5) - Not applicable in this instance
3.2.1 (5A) — Not applicable in this instance
yével 1,895 Ann Stredt rede
FortitudeVal yt Ne
bee
nc ache mt nt
076
es 9
Page 3
Part A, Version 3.1, 3 March 2008
Part A
Common details
OTE: Answer all questions unless directed to go to a particular question. Refer to the end of the form for advice on how to complete this form.
Pplicant details (7he Appkcant is the person responsibve for making the application and need not be the owner af the fand. The Appicant is responsible for ensunng the
nation provided on the IDAS AppScetion Form Is correct This information is rexed upon by the Assessment Manager end eny referral agencies when assessing and
iding ‘hvs appiceton By lodging this appitcation, the Appticant incurs the obégations and responsibilities prescribed by tha PA Any development perma or pretminary
al thet may be issued ag a uence of fxs eppiication wil be ssuad to the Applicant )
Company/organisation name (if applicable) [Loma Jane Clarkson C/- Pl Home Pty Ltd
Individual applicant/Contact person (if there is more than one applicant, provide additional applicant details on an attachment to this form)
Postal address [PO Box 1774 New Farm Qld 4005
Contact telephone number {36660766 Mobile phone number 0417751574
Facsimile number 36660788 e-mail address peter@planning-initiatives
Details of the premises (i.e. the Jand on which the development 1s proposed - refer to the advice at the and of the form) |
1. Identify the premises by completing Table A, or Table B and/or Table C (ensure adequate information is given fo identify the premises)
Table A If the application is for a mobile and temporary Environmentally Retevant Activity (ERA), complete Table A only. Then go to Q2,
[ wo. __ Name of each focal goverment area in which the mobile and temporary ERA is proposed to operate
| 1
OR
Table 8 Street address for the premises (tick applicable box/es below and insert property description in the table. Identify each lot in a separate row.)
() (C] Street address / lot on plan for the premises (Appropriate for most applications including building applications); of
(i) (7) Street address Alot on plan for the land adjoining or adjacent to the premises (Appropriate for development in water o.g. jatty,
pontoon etc) (Note: Lofon plan details may be obtained from title documents, a ‘Rate’ notice, or from the local government.)
Tat |Sherl ce Steet Address - Loton eer Locat government area (e.g. Logan,
No. | No. Steet Name and oficial suburbviocally name | Post Cade | Lot No. Plan Ni Cains)
[ 1 1 Tristania Drive, Marcus Beach 99 M11112 Noosa Shire Counclt
AND/OR
Table C Coordinates and/or a map of the premises (Appropriate for development in remote areas, over part of a tot, in water (6.9. channel dredging in Moreton
Bay) otc.)
Coordinates . : :
(Note: place sach set of coordinates in a saparate row) Zone Datum Local government area
‘Easting Northing Latitude | Longitude | Reference “ {tf applicable)
1 ( ocpass
CO wesea
LJ Otter-
2. _ Identify if any of the following apply to the premises by completing Tables D, E, or F. (Note: in most instances, the premises will not involve any of
the following characteristics, however some applications may involve one or more of these characteristics - complete only if applicable}
Page 4
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
Table D Complete if the pr remises are adjacent to or associated with a water body, watercourse or aquifer (e.g. river, creek, fake, cana/)
‘Name of water body, watercourse or aquifer (if known) j
{1
Table E Complete if the > premises are on Strategic Port Land under ‘the Transport Infra Infrastructure Act 1994
- Lot on plan description for strategic port Hand : Port Authority for the lot
[1
Table F Complete if the premises are in tidal water
[1
Name of local government for the tidal area fit appcable) “| _ Name of port authority for the tidal area (tf appScable)
3. Indicate the total area of the premises on which the development is proposed: (Note: The total area may inchide land both above and below water)
Total area of premises |
784.00 (Xjm? (hectares {Tick applicable unit)
‘Existing use of the premises . . . ]
4. — Current use/s of the premises: (e.g. vacant land, house, townhouses, apartment building, shop, service station, school, sugar cane farming etc.)
{1 House |
5. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overtand flow, water efc.)?
® No O Yes - Ensure the type, location and dimensions of each easement are included in plans, submitted with the application
[Froposal details . ” - |
6. Brief description of the proposal (e.g. 6 unit apartment building, 30 tot residential subdivision, a bore, aquaculture)
House
7. Does the poposal include new buildings or operational work (including any services) on the premises?
&® No O Yes - Ensure the nature, focation and dimensions of the proposed works ere included in plans, submitted with the application
‘Resource entitlement (/ appicable)_- further information is provided in the advice section ai the end of the form |
8. Does the application involve taking or interfering with a State resource and therefore require a resource entitlement? (e.g. the application
invoWves State land (leased and freehold), declared Fish Habitat areas, taking quarry material, taking or interfering with water under the Water Act 2000, etc.)
xX] No - Go fo Q9 oO Yes - Complete Table G - provide details for each evidence required on a separate row. if applicable. Evidence of resource
allocation or entitlement must be submitted with the application. You do not need to answer Q9 - go fo the next section.
{Owner's consent (if appicatie) __- furlher information is provided in the advice section at the end of the forn ]
9. Complete Table H for applications involving a material change of use; reconfiguration of a lot; work on land below high-water mark and
not within a canal as defined under the Coastal Protection and Management Act 1995; or work on rail corridor land defined under the
Transport Infrastructure Act 1994 - provide details for each owner on a separate row, or on an altachment to this form if applicable.
Premises Owner's namels ~~” Details of the premises owned , . |: Date consent
Table H and postal address {street adeéess or lot on plan description) Owner's signature was obtained
1 See Attached Letter
* Owner's signature cannot be provided on the form if you intend to submit the application electronically. Owner's consent must be provided to the assessment manager on an
attachment containing appropriate written documentation of the owner's consent. If the owner is a company, $127 of the Corporations Act 2001 (Cwealth) details how a
company may sign as owner. Templates for the provision of cwner's consent are available on the IPA website .
{Attachments and supporting information (Compkte Table I - Use a separate row for each type of attachment or Information, including information required
inder this Part) Please ensure all documentation submitted with this form, including other Parts of Form 1, or owner's consent, etc, are securely attached to this Part of the Form.
“Description of attachment oF information
Title @Feppicable) Method of detivery to |
Table { (49. Part C of Farm 1, cope Se pete (e.g. General Author James StroetTratfc Report Date assessment manager
Page 5
Part A, Version 3.1, 3 March 2008
_|
INTEGRATED PLANNING ACT 1997
Portable Long Service Leave (PLSL) levy (Appicable for certain butding and construction work vatued over $60,000 onty}
10, The Portable Long Service Leave Levy (PLSL) is not applicable to this application if any of the following apply: ( Tick box if appfcabie)
(1 the application seeks a preliminary approval only;
(C] the application is not for building and construction work under the Building and Construction industry (Portable Long Service
Leave) Act 1991, section 3AA (e.g. the application is only for a change of use, or for the following types of work carried out solely for
farming purposes: land clearing, site preparation, earthworks, fences, fodder harvesting, clearing of encroaching vegetation, clearing of
regrowth, thinning vegetation or controlling weeds or pests);
all costs, that relate to the work both directly and indirectly, are less than $80,000, inclusive of GST; or
(C1 the work is being carried out under an owner-builder permit issued under the Queensiand Building Services Authority Act 1991 -
Complete and submit a QLeave Notification and Payment Form (no payment required if owner-builder permit number stated). The receipted form must be
sighted by the assessment manager before a development permit can be given.
11. Is payment of a PLSL levy applicable to this application? (Refer to Q10 and the Advice below for more information)?
(1 No - EndotPata
(1 Yes - Answer Q12 below
OFFICE USE ONLY (For use by the Assessment Manager / Private Certifier) (Optional)
. Receiving officer's Reference
Fee ($)| 54S | Datereceived| | 2 3 { oF name p N¢ numbers O8/ 479
| . NOTIFICATION OF ENGAGEMENT OF PRIVATE CERTIFIER ]
To: Council. | have been engaged as the private certifier for the building work referred to in this application.
Date of i D8 en eorticatinn ‘amnge | one |
eeqagement - Name _ "BSACetfcaton number | Building dassifcation/s
QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable)
* pow Date receipted .
Desorption ofthe work | QLeave Project Number |Amount paid($)} Date paid | satel by Name of offer wno sighted the
_ manager ,
ic
Privacy Statement
Tha information collected on Form 1 will be used by the Department of Infrastructure and Planning (DIP) in accordance with the processing and assessment of your Application.
Your personal details will not be disclosed for a purpose outside of the DAS process, except where required by legislation (including the Freedom of information Act 1992) or as
required by Parliament. This information may be stored in a DIP database. The information collected will be retained as required by the Public Records Act 2002.
Advice for completing Part A
General advice
. Part A of IDAS Development Application Form 1 must be completed and accompany all development applications, The applicant is responsible
for answering all questions fully and correctly, unless following a response there is a statement to go directly to another question. The
Assessment Manger may refuse to receive an application that is not properly made.
° The IDAS Assessment Checklist must also be completed for all development applications, other than those requiring assessment against the
Building Act 1975 only, i.e. those applications requiring the completion of Parts A and B only.
Applicant details
je if the applicant is a company or organisation, a contact person must be nominated. The applicant's signature is not required to be provided
under the IPA.
Page 6
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008 Details of the premises The term ‘premises’ is defined by the IPA, schedule 10 to mean a building or other structure, and land (whether or not a building or other structure is situated on the land). The term ‘land’ is also defined to include the estate in, on, over or under the land. Details of the land are not required if the application involves a mobile and temporary Environmentally Relevant Activity only. Instead complete Table A. The premises may be identified in a number of ways ~ « Street address and lot on plan are most common and will apply to most applications. * Coordinates may provide the best means of accurately identifying the location of development proposed in waters, or on a relatively small development site distant from property boundaries on a large fot. Sufficient coordinates need to be provided to identify the boundary of the premises the subject of the application. Eastings and northings using GDA94 datum is preferred, but longitude and latitude and other (specified) datum such as Zone Reference or GS84 may be provided. The definition of ‘water body’ and ‘watercourse’ can vary from Act to Act. StrategicPortLandis within a local goverment area but a local government's planning scheme does not apply onStrategicPortLand. StrategicPortLandis declared under the Transport infrastructure Act 1994, For further information go to IDAS Guide 11 (Development on strategic port land) and the Queensland Transport (Ports) website. “Tidal water is defined in the Coastal Protection and Management Act 1995 (Schedule) and ‘tidal area’ for a focal government and for strategic port land is defined in the IPA (schedule 10). Generally, the area belaw “high-water mark’ (defined by the Coastal Act in relation fo high water mark at spring tides) establishes the boundary of a tidal area. Land below high water mark is not within a local government's area unless provided for under the Local Government Act 1993. Unless otherwise provided for by legislation, a local government has no jurisdiction below high water mark. A tidal area for strategic port land is within the jurisdiction of the relevant port authority, while the Environmental Protection Agency generally has jurisdiction for a local goverment tidal area. However, the IPA gives local governments jurisdiction for assessing and deciding applications for prescribed tidal works within the local goverment tidal area, and the planning scheme may be applied to that assessment (to the extent provided for in the code for prescribed tidal work). Resource entitlement Section 3,2,1(5) of the IPA requires evidence of resource entitlement be given for applications if they involve taking or interfering with a prescribed State resource. Schedule 10 of the integrated Planning Regulation 1998 (IPR) prescribes the State resources, Including State- owned land, where evidence is required to be given, and the evidence required to support the application. Link to Integrated Planning Regulation. Section 3.2.1(10)(a)(ii) states an application cannot be taken to be properly made without the required evidence. For applications involving the taking or interfering with water under the Water Act, the development application may be made at the same time as the request for resource entitlement, and the Department of Natural Resources and Water will accept the application as properly made. For State-controfled roads, a resource entitlement is not required for an activity that is exempt ancillary works or encroachment (identified by gazette notice under the Transport Infrastructure Act 1994, section 50), or if the activity requires referral to the Department of Main Roads. Evidence may be required from more than one Department responsible for a State-owned resource, e.g. from the Environmental Protection Agency for quarry material below high water mark, and the Department of Natural Resources and Water in relation to the State-owned land above high water mark. * Owner's consent Section 3.2.1(3) of the IPA prescribes that an application must contain, or be supported by, the written consent of the land owner/s, if the application involves: a material change of use; reconfiguration of a lot; work on land below high-water mark and not within a canal as defined under the Coastal Protection and Management Act 1995; or work on rail corridor land defined under the Transport Infrastructure Act 1994. Evidence of this consent may need to be provided before the application will be accepted as properly made by the Assessment Manager, during the processes of the application or in the event of an appeal about the outcome of the application. “Owner for the purpose of a lodging an IDAS development application means the person at the time of lodging the application, entitled to receive the rent for the land (or would be entitled to receive the rent for it if it were let to a tenant at a rent). Templates are available from the IPA website for the provision of owner's consent as an attachment to this form. However other documentation may be used for providing owner's consent provided it is clear the documentation relates to the development application for the premises. Owner's consent, if required, must be provided even if the applicant is the owner. Owner's consent is not required for a mobile and temporary ERA. Portable Long Service Leave (PLSL) Levy The Building and Construction Industry Portable Long Service Leave Scheme provides long service leave entitlements to workers in the building and construction industry who would be unlikely to accrue enough service with one employer to qualify for tong service leave. To fund the scheme, a Portable Long Service Leave Levy (PLSL levy) is collected on certain building and construction work carried out inQueenstand. The PLSL levy amount and other prescribed percentages and rates for calculating the levy are stated in the Building and Construction industry (Portable Long Service Leave) Regulation 2002. Included in the amount collected by QLeave is the Workplace Health and Safety Fee and the Building and Construction IndustryTrainingLevy. The Building and Construction Industry (Portable Long Service Leave) Act 1991 (PLSL Act) defines the building and construction work subject to the PLSL levy and includes renovating, relocating, constructing, altering, demolishing, maintaining or repairing buildings, pools, roads, jetties, pipelines, fences or earthworks, and works for subdividing, irrigating or draining land. The PLSL levy need not be paid when the application is made, but the PLSL Act requires the levy to be paid before a development permit may be issued. The Assessment Manager must sight an approved form issued by QLeave advising of the status of the payment of the PLSL levy. Building and Construction Industry Notification and Payment Forms are available from anyQueenslandpost office or agency, on request from QLeave, or can be completed on the QLeave website at www.qleave.qid.gov.au, For further information contact QLeave (Tel: 1800 803 481 Web: www.gleave.ald.gov.au }
Page 7
26/11/2087 99:56 61732524748 LORNA JANE PAGE 62/82
23 November, 2007
The Chief Executive Officer
Noosa Shire Council
PO Box 141 Tewantin
Queensland 4565
Dear Sir/Madam,
paastte
DEVELOPMENT APPLICATION "4 1 7 TRISTANIA DRIVE, MARCUS BEACH
Described as Lot 99 on M11412 Parish of Weyba
I, Lorna Lane Clarkson, the owner of, the ‘above property, authorise P] Home Pty Ltd
to lodge Applications for the above property and deal with any associated matters
that may arise from the: lodgement ‘and’ ‘application on my behalf. Please forward all
correspondence to the address’ no
Yours faithfully.
Lorna Jane Clarkson -
Page 8
INTEGRATED PLANNING ACT 1997 Part E, Version 3.1, 3 March 2008
Building &/or operational works assessable
against a planning scheme
1, Nature of work that requires assessment against a planning scheme:
LR} Building work - Complete Table A CC Operational work - Complete Table 8
Table A
(i) Whatis the nature of the building work made assessable in the planning scheme?
Extension to a detached house
(ii) Are there any current approvals assoclated with this application? (e.g. matartal change of use)
No [[] Yes - Provide dotails bolow
2. Whatis the dollar value of this operational work? (Le. the total value incfuding GST, materials and tabou) [$769 .
3. Confirm that the following mandatory information accompanies this application
Plans, andspecificalions if applicable, shawing the nature and location of the proposed works (inctuding the
extent of any cut ard fl)
OFFICE USE ONLY
Date Received Referance Numbers |
Advice for completing Part E
General advice
je Part A must atso be completed for ail IDAS development applications.
* The appficant Is responsible for answering all questlons fully and correclly, untess following a response there Is a statement to qo directly to another question,
Qt A development permit autharises development to occur, while a prallminary approval |s a step in the approval process and does nat authorise develapment to occur
RECEIVED
18 MAR 2008
a4
Page 9
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checkfist, Version 21.1, 3 March 2008 IDAS Assessment Checklist IDAS Development Application Form 1 is the approved form for all development applications under the Integrated Planning Act 1997 IPA). Form 1 is made up of various Parts. Part A (Common details) of Form 4 must be completed for all applications. The relevance of other Parts of Form 1 depends on the nature of the application. Form 1 also includes the IDAS Assessment Checklist, which is used to assist in determining State assessment and referral requirements, and the Parts of Form 4 relevant to the application. Section 1 and all other relevant sections of the IDAS Assessment Checkiist, as identified in the Table below, must be completed for ali development applications except those proposed on land in an urban development area, or for building work requiring assessment against the Buifding Act 1975 only. For more information about development applications on fand in an urban development area, refer to www.ulda.qid.gov.au. For more advice about building applications refer to Part B of the IDAS Application Form. Answering the following questions will assist you in determining which sections of the checklist must be completed for your application. For all IDAS development applications (except those for building work requiring assessment against the Building Act 1975 only) - complete Section 1 of this checklist Does the application seek approval to materially change use of the premises? es No if yas - complete Section 2 of this checklist Does the application seek approval to reconfigure a lot? if yes - complete Section 3 of this checkiist and Part F of IDAS Application Form 1. Assessment Is by the local government. Lives |[XINo Does the application seek approval to carry out operational work? N ifyes - completa Section 4 of this checklist s | No Does the application seek approval to carry out building work requiring assessment against the Fisheries Act 1994? CYes | No if yes - complete Section 5 of this checklist Have you received a referral agency response under section 3.3.2.of the IPA, in relation to this development application? if yes - complete Section 6 of this checklist. OYes |XJNo Does the application seek approval to carry out building work requiring assessment against a local government planning scheme? OCYes |KjNo if yes - complete Part E of IDAS Application Form 1. Assessment is by the local government. Does the application seek approval to carry out building work requiring assessment against the Building Act 1975? if yes - go to Appendix 4 of this checklist for advice on building referrals. Complete Part B of IDAS Application Form 1. Yes |KINo Assessment is by a building certifier SECTION 1 Saction 1 must be completed for afl applications that require completion of the IDAS Assessment Checklist. HERITAGE ___. , | 14 Is any part of the proposal intended to be carried out on a registered place under the Queensland Hentage Act 1992? (XK No-Gotoa12 (] Yes IPA, schedule &, part 1, table 5, item 2; IP Regulation, schedule 2, fable 2, item 18: IPA, section 1.3.5 (Definitions for terms used in development) [REMOVING QUARRY MATERIAL; WILD RIVER AREA “ . 4 A 1.2 Does the proposal involve removing quarry material from a watercourse or lake as defined under the Wafer Act 2000? [X] No-cotoa13 [_] Yes
Page 10
INTEGRATED PLANNING ACT 1997 (DAS Assessment Checklist, Version 21.1, 3 March 2008 JPA. schedule 8 part 1. lable 5, item 1: iP Regulation. schedule 2. table 2. item 11, 1P Regulation. schedute }, table 5, item 2 iwild river area), Water Act 2000 section 966C, Wild Rivers Act 2005, section 434 1. [ENVIRONMENTALLY RELEVANT ACTIVITY; WILD RIVER AREA ] 13 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity? (KX) No-Gotoa1s (] Yes IPA 8 1 tatie 2 dem 7: IPA. schedule 4. pant 1. tebe 5. dems 2 ang 4 iP Reaulagon schedule 2, iatie 2, tems 1 and 23: Emeronmenial Promchan Act 1994. section ver wes Wik Rivers Act 21:05, section 434° relevant wid river deciaraton Wiki Rivers Code. WITHIN THE LIMITS OF A PORT J 1.4 Is any part of the premises within the limits of a port under the Transport infrastructure Act 1994? X] No - Goto. 01.5 (1) Yes IP Reguiation, schedule 2, table 2, items 15 and 16 (DECLARED FISH HABITAT AREA | 1.5 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994? [1X] No - Goto 01.6 O Yes - if answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA, schedule 8, this application requires assessment by the Department of Primary industries and Fisheries (DPI&F). If DPI&F is not the Assessment Manager for the application, the agency has jurisdiction as Advice Agency. IP Regulation, schedule 2, table 2, item 26 (COMMUNITY INFRASTRUCTURE : < qT 1.6 's any part of the premises designated for community infrastructure? DX] No - Goto Q1.7 (Yes IP Regulation schedule 2, table 3, item 7 WASTE WATER MANAGEMENT " —" 17 Does the proposal involve the establishment or expansion of a waste water disposal system? [X] No -Endof Section? [(} Yes IP Regulation, schedule 2. table 3, item 5 a SECTION 2 + Section 2 must be completed when the application seeks approval to materially change the use of premises. v I ‘PLANNING SCHEME a 21 ts the proposed use assessable under the planning scheme? ( (J No - Goo 022 DX] Yes - Complete Form 1, Part O and answer Q2.1.1 - 2.1.13 below J IK If yes, does the application request that the proposal be assessed against a superseded planning scheme? No — (_] Yes- (Complete Form 4 Attachment 1) ISTATE-CONT ROLLED ROAD ~ = 2 8 : | 2.11 Is any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road? CL Yes 0X] No If not proposed use listed in schedule 5 of the Integrated Planning Regulation 1998 and does it exceed the specified threshold? X No oO Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency. IP Regulation. schedule 2. table 3. items 1(a} and 3
Page 11
INTEGRATED PLANNING ACT 1897 (DAS Assessment Checklist, Version 21.1, 3 March 2008
ACID SULFATE SOILS ]
2.1.2 Is the use proposed in a local goverment area listed? ' in State Planning Policy 2/02: Planning and Managing Development
Involving Acid Sulfate Soils?
DK] No-Gotoa213 (_] Yes
21 Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Bumett, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook, Cooloola, Douglas,
Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrook, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Momington, Noosa, Pine
Rivers, Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday
IP Regulation, schedule 2, table 3, tem 4; State Planning Poicy 2/02: Planning and Managing Development Involving Acid Sulfate Soils, section 3.6
[COASTAL MANAGEMENT DISTRICT |
2.1.3 Does the proposed use involve the following?
{i) Carrying out operational work, completely or partly in a coastal management district &) No 0 Yes
(ii) Carrying out building work, completely or partly in a coastal management district, that is the [gq No D Yes
construction of new premises with a gross floor area (GFA) of at least 1,000m?
(ii) Carrying out building work, completely or partly in a coastal management district, thatisthe §q No Yes
enlargement of the GFA of existing premises by more than 1,000m?
If yes to any one of (i) - (ili) above - This appiication must be referred to the Environmental Protection Agency (EPA) as Concurrence Agency.
IP Regulation, schedule 2, table 3, item 6
VEGETATION CLEARING |
2.1.4 Do the premises include a lot containing the following?
() A category 1, 2 or 3 area shown on a Property Map of Assessable Vegetation (PMAV) No CO Yes
(ii) If there is no PMAV for a lot, remnant vegetation fd No 0 Yes
JP Reguiation, schedule 2, table 3, item 11
ICONTAMINATED LAND -UNEXPLODED ORDNANCE... gg ee |
2.1.5 Is any part of the premises in an area for which an area management advice has been given for unexploded ordnance?
&) No - Goto Q2.1.6 oO Yes - (Complete Form 1, Part N) This appiication must be referred to the Administering Authority as Concurrence
IP Reguiation, schedite 2, table 3, item 12 Agency
iPUBLIC PASSENGER TRANSPORT
2.1.6 Is the proposed use of premises fisted in schedule 13C of the integrated Planning Regulation 1998 and does it exceed the
specified threshold?
DX] No - Goto 02.17 (1 Yes - This application must be referred to Queensland Transport (QT) as Concurrence Agency.
IP Regulation, schedule 2. table 3, lem 14
IRAILWAY SAFETY AND EFFICIENCY =. 2 ed we o.oo s 4
2.1.7 Is the proposed use of premises “isted i in schedule 13D of the Thiegrated Planning Regulation 1 908 and does it exceed the
specified threshold?
DX] No - Goto 02.1.8 (LD Yes - This application must be referred to Queensland Transport (QT) as Concurrence Agency.
JP Regulation, schedule 2. table 3, tem 75
IKOALA CONSERVATION . |
2.1.8 |s any part of the premises in a koala conservation area or koala sustainability area?
DX] No- Gotoo249 [_] Yes
IP Regulation. schedule 2. fable 3. tem 18
‘EASEMENTS AND SUBSTATIONS _ |
2.1.9 Is the use associated with reconfiguring a lot?
[1] [email protected] [| No - Answer both (a) and (b) below
{a) Will any part of any structure or work that is the natural and ordinary consequence of the use, be located in an
easement?
DX] No-Goto(o) [[] Yes - Answer both (i) and (ii) below
Page 12
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.1, 3 March 2008 (b) (s any part of the premises situated within 100m of a substation site under the Electricity Act 1994? &] No (7 Yes - This application must be referred to the entity responsible for the substation as Advice Agency. IP Reguiaticn, schedule 2. table 3. item 8 (erectraty easement}: IP Requiation, schedule 2, table 3. tem 16 ipipeline easemenij: IP Regulabon, schedule 2. table 3. item 9 (sudstabon} ‘RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT IN A WILD RIVER AREA | 2.1.10 Is any part of the premises in a wild river area declared under the Wild Rivers Act 2005? BX] No -Gotoo21.11 ([] Yes IP Regutation, schedule 1, part 2. table 5, item t/a): Wiki Rivers code (Note: the code dees noi currently contain applicable provisions for residential, indusbial or conimercial development inside a designated urban area} WETLAND _| 2.1.11 Is the proposal only for the construction or use of a single residence on a lot and any reasonably associated building or structure? (7 Yes -Gotoa21.12 [Xx] No If no, do the premises include a lot situated in, or within 100m of, a wetland shown on the ‘Map of referable wetlands’? DX} No (1 Yes - This application must be referred to the Environmental Protection Agency (EPA) as Advice Agency. 1 Reguiation, schedule 2, fable 3, tam 20 IMERITAGE : ns s . . ] 2.1.12 Do the premises include a lot sharing a common boundary with a protected area or registered place under the Queensland Heritage Act 1992? [4] No -Gotoa2.1.13 [7] Yes - This application must be referred to the Queensland Hentage Council (QHC) as Advice Agency. IP Regulation, schedule 2, table 3, tem 22 (CERTAINPRELIMINARY APPROVALS Oe oe De] 2.1.13 Is preliminary approval sought for the application under the IPA, section 3.1.6? [BX] No - Goto. 02.2 C Yes - (Complete Form 1, Attachment 2) This application must be referred to the Department of infrastructure and Planning (DIP) as Advice Agency, IP Regulation, schedule 2, table 3, tem 23 [BROTHEL ° — el 2.2 Is the proposed use a brothel as defined under the Prostitution Act 1999? No -Gotoa23 (_] Yes IPA, schedule 8, part 1, table 2. item 2: Prostitution Act 1999. section 64 (STRATEGIC PORTLAND wed gy a beicimed 2.3 Is any part of the use proposed on Strategic Port Land under the Transport Infrastructure Act 1994? [XK] No-Gotoa24 (_] Yes IPA, schedule 8, part 1, table 2, item 3: IP Regulation, schedule 2, table 2, item 6 MAJOR HAZARD FACILITY | 24 Is the proposed use a major hazard facility or possible major hazard facility under the Dangerous Goods Safety Management Act 2001? Kk No -Got.q25 [_] Yes - (Complete Form 1, Part L) This application requires assessment by the Department of Emergency Services (DES). if DES is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency, IPA, schedule 8, part 1, fable 2, item 4, iP Regulation. schedule 2, table 2, tem 7 (CONTAMINATED LAND - REGISTERED LAND } 25 Is any part of the land forming the premises on the Environmental Management Register or Contaminated Land Register under the Environmental Protection Act 1994? (KJ No-Gotoaz6 (_) Yes IPA, schedule 8, part 1. table 2, em 5; IP Regulation, schedule 2, table 2, item 22
Page 13
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.1, 3 March 2008
(CONTAMINATED LAND - NOTIFIABLE ACTIVITY |
2.6 Is any part of the land forming the premises currently used for a notifiable activity, or if there is no existing use was it last used for
a notifiable activity?
No -Gotooz7 ((] Yes
IPA, schedule 8. part 1, table 2. iter 6: IP Regulation, schedule 2, table 2. item 22
[CONT AMINATED LAND - INDUSTRIAL ACTIVITY |
27 Is any part of the premises currently used for an industrial activity (other than for a mining activity or petroleum activity), or if there
is no existing use was it last used for an industrial activity (other than for a mining activity or petroleum activity)?
IX] No -Gotoa28 {_] Yes
IPA, schedule 8, part 1, table 2, item 6 IP Regulation, schedule 2, table 2, tem 22
(CONTAMINATED LAND - AREA MANAGEMENT ADVICE (NATURAL MINERALISATION OR INDUSTRIAL ACTIVITY) |
28 Is any part of the premises in an area for which an area management advice has been given for natural mineralisation or industrial
activity (other than for a mining activity or petroleum activity)?
IK] No - Goto 029
CT] Yes
IPA. schedule 8, part 1, fable 2, item 7; iP Regulation, schedule 2, lable 2, dem 22
JAQUACULTURE; WILD RIVER AREA |
29 Is the proposed use for aquaculture as defined under the Fisheries Act 1994?
IX) No -Gotoaz70 (] Yes
IPA, schedute 8, part 1, lable 2, item 8; IPA, schedule 8, part 2, table 2, item 1 (seiFassessable aquacuiture); IP Regulation, schedule 2. table 2. tem 27
Fisherios Act 1994, section 760A (wild river area); Wild Rivers Act 2005, section 43A
IAGRICULTURAL AND ANIMAL HUSBANDRY ACTIVITIES IN A WILD RIVER AREA }
2.10 {s any part of the premises in a wild river area declared under the Wild Rivers Act 2005?
[X] No -Gotooz# (_] Yes
IPA, schedule 8. part 1, table 2, lem 11, IP Regulation, schedule 2, table 2, item 36 : Wild Rivers Act 20085, sections 42, 43A
iSEQ REGIONAL PLAN “a “ ‘ ~ 4
2.14 Is any part of the premises within the South East Queensland (SEQ) Regional Plan area?
([] No -Gotoa212 [X) Yes
lf yes, are the premises within one or more of the following areas?
e A Major Development Area in the Urban Footprint No [7] Yes - (Answer (a) fo (c) below)
e The Regional Landscape and Rural Production Area No [) Yes - {Answer (d) below)
¢ The Rural Living Area &INo () Yes - {Answer (e) below)
¢ The Investigation Area No () Yes - (Answer () and (g) below)
SEQ Regional Pian 2005-2026, Amendment 1. Regulatory Provisions, division 2; 1P Regulation. schedule 2, table 3, dem 13; IPA, section 2.54. 12 (3)
ICONSERVATION ESTATE . |
2.12 Is the proposal for urban purposes, as defined under the IPA?
DX] No -Gotoa213 (_] Yes
IP Regulation, schedule 2. table 2 iter 40
IREMOVAL, DESTRUCTION OR DAMAGE OF A MARINE PLANT 1
2.43 Does the proposed use involve the removal, destruction or damage of marine plants under the Fisheries Act 1994?
[XJ No -EndofSection2 (] Yes
IPA, section 3.2.2A, IPA, schedule 8, parr i, table 4, dem
SI17A (seH-assessanle codespiP Regulation, sctredule 2. te
Rivars Act 2005, section 434.
fe developinent), IPA, schedule 3, part 2, table 4, item 4 (sel/-assessable davelopmentr Fisherias Regulation 1995
2, tem 29: IP Regulation, schedule 7, part 3, tatie 4 ent 8: Fisheries Act 1994, sechon 76DB (wit river area). Wid
SECTION 4 - section 4 must be completed when the application seeks approval to carry out operational work,
Page 14
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.1, 3 March 2008
PLANNING SCHEME ]
44 \s any of the proposed operational work assessable under a planning scheme?
IX] No - Goto. 04.2 (L] Yes - (Complete Form 1, Part E) Answer Qs4.1.1 - 4.1.7 below.
ASSOCIATED WITH RECONFIGURING A LOT; RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT IN A WILD RIVER
"AREA
4.2 Is any of the proposed operational work associated with reconfiguring a lot and the reconfiguration is also assessable?
(] No -Gotoas3 (] Yes
IPA, schedule 8. part 1, lable 4. iter 2: IP Regulation. schedule { part? tabie §. item 1(c)
Wild Rivers code (Note: the cove does not currently contain applicable provisions for residential. industrial or commercial development inside @ designated urban
ama)
VEGETATION CLEARING; KOALA CONSERVATION; WILD RIVER AREA j
43 ls any of the proposed operational work for the clearing of native vegetation to which the Vegetation Management Act 1999
applies?
[DX] No -Gotoas4 (] Yes
IPA, schedule 8, part 1, table 4, items 1A-1G; IP Regulation. schedule 2. table 2, item 5 (vegetation clearing): IP Regulation, schedule 2, table 2. tom 34 (koala
conservation}; (P Regulation, schedule 1, part 3, table 4, item (vegetation clearing/wild river area}: Vegetation Management Act 1999, section 22A (vegetation
clearing/wald river area), Wild Rivers Act 2005, sections IF and 43A
|TAKING OR INTERFERING WITH WATER; WILD RIVER AREA * . : 4
44 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with water from a watercourse, lake or spring (other than using a water truck to pump water, and other than under
the Water Act 2000, section 20(2), (3) or (5)), or from a dam constructed on a watercourse or lake?
DX] No -Gotoa45 [_] Yes - Answer (a) and (b) below
IPA, schedule 8 pivt 1, table 4. inns dar IP Regulation. schedule 2, tadie 2, dem 8: IP Reguiation. schedule 1, peut 3. fabled, items 3 and 2A; Water Act 2000, section 9668 (wid aver
aga); Wikt Revers Act 2005, section 424: relevant wild river declaration, Wid Rivers Code
45 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with artesian water (other than using a water truck to pump water)?
No Goto Q46 oO Yes - (Complete Form 1, Part K,) This application requires assessment by the Department of Natural Resources and Water
(NRW). If NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
IPA, schedule 8, part 1, table 4, item 3(b); IP Regulation, schedule 2, table 2, item 8; iP Requiation, schedule 1, part 3, table 4, tem 3
Wild Rivers code (Note: the code does not curently contain applicable provisions for taking or Interfering with artesian water)
46 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking
overland flow water (other than using a water truck to pump water)?
[DX] No -Gotoa47 [] Yes - Answer (a) and (b) below
IPA schadute 8. part t, lable 4, item fei; IP Regutation, schedule 2. table 2, tem 8; iP Reyuletion. schedule 1, part 3, fable 4, tem 3. Walter Act 2000. section 966A (wil uver area),
Wit Rivers Act 2005. section 434° relevant wild river decierabon: Wid Rivers Code.
47 Is any of the proposed operational work for any thing constructed or installed that allows, under the Wafer Act 2000, for taking or
interfering with subartesian water (other than using a water truck to pump water)?
[DX] No -Gotoass (_] Yes
IPA. schedule 8. part 1. table 4, item 3(c) fi), 1P Regulation. schedule 2, table 2, iten 8 IP Regulation. schedule 1. part 3, table 4, item 3
Water Act 2000, section 966A (wild river area)(Note: no current Wild River decteration identifies taking or interfenng with subartesian water as assessable)
Wild River code (Note: the code does not currently contain applicable provisions for sub artesian water)
48 Does any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for
interfering with overland flow water (other than using a water truck to pump water)?
[XJ No -Gotoa49 {_] Yes - Answer both (a) and (b) below
IPA soheduie 8. part 1. tatia 4. eins cj) and 3d): #P Reguianon. scfedule 2, table 2. item &: iP Reguiston, schaduie 1, peri 2 tehle 4. item 34. Water Act 2090, section 9685 (nid
iver area), refevant wid tver declaration; Wid Rivers Code.
49 ls the proposed operational work for the following?
(i) For the construction of a referable dam as defined under the Water Act 2000 [& No 0 Yes
(ii) To increase the storage capacity of a referable dam by more than 10% & No O Yes
If yes to either or both (i) or (ii) above - (Complete Form 1, Part Ks} This application requires assessment by the Department of Natural Resources and
Water (NRW). if NRW is not the Assessment Manager for the application, the agency has jurisdiction as
Concurrence Agency.
JPA. schedule 8, part 1. lable 4, item 4: IP Regulation, schedule 2. table 2. item 10
Page 15
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.1, 3 March 2008
TIDAL WORK; WILD RIVER AREA ]
4.10 {s any of the proposed operational work tidal work, other than excluded work defined under the IPA?
[XJ No -Gotoo411 [[] Yes - Answer (a) and (b) below
IPA, scheduls 8. part 1. table 4. item 5: IP Regulation, schedule 2. table 2 items 12. 14 and 17: iP Requialicn, schedule 1, pari 3. table 4 items 4A end §
Coastal Protection and Management Act 1995. section 104A (wild river area)
(COASTAL MANAGEMENT DISTRICT; WILD RIVER AREA _|
4.11 Is any of the operational work proposed to be carried out within a coastal management district?
DX] No -Gotoas12 (_] Yes
IPA, schedule 8, part 1, table 4. item 5: IP Regulation, schedule 2, table 2, ifems 12 and 14, iP Regulation. schedule 1, part 3, lable 4, items 4A and 5
Coastal Protection and Manegement Act 1995 Act 1995. section 104A (wild river area): Wild Rivers Act 2005, section 434
WATERWAY BARRIER WORKS; WILD RIVER AREA |
4.12 's any of the proposed operational work for constructing or raising waterway barrier works under the Fisheries Act 1994?
DX] No -Gotoas13 ([] Yes
2 8. part 1, table 4, tem A: IPs
chaduie !, part 3 table 4.
sable codes); IP Reguiaton, schadule 2, table 2, em 28 iP
act 1996, section 7604 (wah river area); Wild Rivers aet 2008. secton 435A,
[DECLARED FISH HABITAT AREA, WILD RIVER AREA |
4.13 Is any of the operational work proposed to be carried out completely or partly within a declared fish habitat area under the
Fisheries Act 1994?
DX] No - Goto 04.14
CD Yes
IPA, schedufe & part |. table 4, ilem 7: IPA. schedule 8, part 2. reble 4. item 3; Fisheries Regulation 1995 $113A {selfassessabie codes}: (P Regutation, schedule 2. tabie 2. dem 25, iP
Regulation, schedule 1, part 3. table 4, ilem 7, Wild Rivers Act 2005, sections 434; Fisnenes Aci. section 76DC {wld river grea).
(REMOVAL, DESTRUCTION OR DAMAGE OF A MARINE PLANT; WILD RIVER AREA |
4.14 ts any of the proposed operational work removing, destroying or damaging marine plants under the Fisheries Act 1994?
LX] No -Gotoa4.15 (_] Yes
IPA, schedule §. part |, table 4, lem 8: IPA. scheduis 2, part 2. t2b'¢ 4. dem 4; Fisnenes Regulation 1995 $1134 (set/-assessabe codes); /P Regulation, schedule 2, table 2. items 29; /P-
Ragulation, schedule 1. part 3, table 4, item 6. Fisher'es Act 1984. section 76DB {illd aver area}: Wild Rivers Act 2005. section 434, relevant wild river declaration; Wild Rivers Code,
WILD RIVER AREA _|j
4.15 Is any of the operational work proposed to be carried out in a wild river area declared under the Wild River Act 2005?
EX] No -Gotoas16 (] Yes
IPA, schedule 8, part 1. lable 4. item 10; IP Regulation, schedule 2, table 2, item 37: Wild Rivers Act 2005, sections 42, 434
heres
ISTATE-CONTROLLED ROAD ~ e “ eo * & 5 so, : |
4.16 Is any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
(X] No -Endofsecton4 [_] Yes
IP Regulation, schodule 2. table 2, item 3
Disclaimer:
While the Department of Infrastructure and Planning (DIP) believes that this information contained on this form and provided as part of
this process will be of assistance to you, it is provided on the basis that you will not rely on the information without first making your own
enquiries regarding the interpretation and application of the applicable legistation to your circumstances.
To the full extent permitted by law DIP expressly disclaims all liability (including but not limited to liability for negligence) for errors or
omissions of any kind or for any loss (including direct and indirect losses), damage or other consequence which may arise from your
feliance on this process and the information contained on this form.
Page 16
Y
INTEGRATED PLANNING ACT 1997
Applicatio
Part D
Part D, Version 3.1, 3 March 2008
Material change of use assessable against a
planning scheme
lanning scheme identification
1.
How is the premises identified / zoned in the applicable planning scheme? (NOTE: if the premises involves multiple zones clearty identify the
relevant zone for each fot) - provide details for each lot on a separate row
Lot description i «ot fare :
(ie. street oF fot on plan detais) Applicable zone /precinct /area Applicable averlays
1 |Lot99 on M11112 Detached Housing Zone Coastal Protection, Landslide Hazard
(Nature of the proposed material change of use (MCU)*- = % »
2. How is the proposed use/s defined in the applicable planning scheme?
Dats Planning scheme definition (include each | No. of dwelling/ |Days & hours off No. of
General sneha tthe proposed use definition in a new row or an attached tenancy units operation employees
He. in yo documentation if applicable) (if applicable) (if applicable) | (if applicable)
1 | House dwelling house
3. What type of approval is being sought?
[X] Development Permit (7) Preliminary Approval [[] Both (Provide details below)
4, Are there any current approvals associated with this application for the change of use of the premises? (0.9. a Preiminary Approval for
the use )
i] No | Yes - Provide details for each associated approval on a separate row
5.
PERSEDED
Proposed maximum number of storeys
Does the proposed use involve,
(i) the reuse of existing 5 (_] No [X] Yes - Complete Table A
(ii) new building work on fe premises (J No {X] Yes - Complete Table 8
(iii) the reuse of other existing operational works on the premises XJ No L] Yes - Complete Table
(iv) new operational work on the premises [X} No (J Yes - Complete Table D
Table A | Existing floor area
Existing ste cover
Existing maximum number of storeys ze —~«
Existing maximum height above natural ground level
Table B | Proposed floor area LC ti(‘(COé;™;™;!WWOWO!OW!~!C~*™
Proposed site cover [Lc t~‘“OCSY
Lod)
Ld
Proposed maximum height above natural ground tevel
Page 17
INTEGRATED PLANNING ACT 1997 Part 0, Version 3.1, 3 March 2008
[Mandatory Information |
6. Confirm that the following mandatory information accompanies this application:
es nation of Method of lodgement
Forall applications —_ : — — |
(i) Plans showing the nature and location of the proposed use on the premises and a statement about the
intensity and scale of the proposed use (e.g. number of employees, days and hours of operation, number of visitors, & Confirmed
number of seats, capacity of storage area}
When the application involves reuse of existing buildings
(ii) Plans showing the size and location of the buildings to be reused [xX] Confirmed
(1 _ Not applicable
When the application involves new building work _ ]
(iii) Plans showing the size and location of the proposed new building work &) Confirmed
(] Not applicable
When the application involves reuse of other existing works ° ~
(iv) Plans showing the nature and location of the works to be reused (J Confirmed
([] Not applicable
When the application involves new operational work | ° a
(v) Plans showing the nature and location of the proposed new operational works X Confirmed
{[]_ Not applicable
OFFICE USE ONLY
Date received Reference numbers
Advice for completing Part D
General advice
Part A must also be completed for all IDAS development applications
The applicant is responsible for answering all
another question. ;
When paying fees to the Environmental ‘
process from the information sheet Elects
fice
Electronic Funds Transfer (EFT) payment fon to this application.
Va tesponse there is a statement to go directly to
56 ) for coastal development applications, use the
ironmental Protection Agency (EPA) and securely attach the form
Q3 A development permit authorises development to occur. A preliminary approval is a step in the approval process and does not authorise
development to occur - a subsequent application for a development permit must be sought.
Table O If the MCU application involves operational work that is the building of a retaining wall on the premises, the application is taken also to be for the
operational work if approval for the operational work has not been applied for in this application or in a separate application.
Page 18
Please find attached the following. “+ IDAS Application Forms Ke * Cheque to the amount of $595.00 representing the applicable fee for an extension to an existing dwelling. « 5 Copies of the following plans. ° o0o00o000 Plan 1 of 28 Rev C — Site Plan dated 09/05/07 Plan 2 of 28 Rev C — Floor Plan dated 09/05/07 Plan 3 of 28 Rev C — Floor Plan dated 09/05/07 Plan 4 of 28 Rev C — Elevations 1 dated 09/05/07 Plan 5 of 28 Rev C — Elevations 2 dated 09/05/07 Plan 6 of 28 Rev C — Sections dated 09/05/07 Plan 7 of 28 Rev C — Roof Plan dated 09/05/07 On the basis that the attached documents demonstrate a properly made application in accordance with /PA’s requirements, we trust that Council, the Assessment Manager will receive it in its current form. | trust that this is to your satisfaction, however, should you require any further information, please feel free to call our office. Yours faithfully, we PI Home Pty Ltd Peter Catchlove
Page 19
6 @ ° NOTES ALL FENCES TO PERIMETER OF POOL ARE TO BE CONSTRUCTED IN ACCORDANCE WITH AS1926 AS REQUIRED BY THE QUEENSLAND BUILDING ACT 1975 TIMBER CLADDING FROM NATURAL GROUND TO DECK LEVEL (min 1500mm) & 1100 HIGH STAINLESS STEEL WIRE BALUSTRADE ABOVE VERTICAL TIMBER PALING FENCE FROM NATURAL GROUND TO 1100mm ABOVE DECK LEVEL. (TOTAL HEIGHT min 1600mm) 2400mm HIGH "CRIMSAFE" STAINLESS STEEL MESH SCREEN DOOR WITH CHILDSAFE LATCH <> FULL HEIGHT "CRIMSAFE" STAINLESS STEEL MESH FIXED TO TIMBER FRAMING @ min 1500mm ABOVE INTERNAL FLOOR LEVEL 1600mm HIGH TIMBER PALING GATE WITH CHILDSAFE LATCH @ min 1500 ABOVE GROUND LEVEL T < 2000 = DECK EXISTING POOL > - - o— I ae AE RN SCREENED DECK SITTING DECK [ Project I ctient [ Drawing No 1 TRISTANIA DRIVE BILL CLARKSON A1900 MARCUS BEACH Scale at A3 Issue | Architect | Drawing Title NORTH 1 4 00 1 ALLEN JACK+COTTIER Pool Fence _. 34 Florence Street Newstead QLD 4006 AUSTRALIA Locations & Descri ption Proj No. ph +61 7 3845 2222 tt +61 7 3845 2200 ABN 53 003 762 250 07707 Do not scale drawings. Use figured dimensions only. This drawing is the copyright of Allen Jack + Cottier Architects and is protected under the Copyright Act 1968. Do not atter, reproduce or fransmitt in any form, or by any means without the express permission of Allen Jack + Cottier Architects. Nominated Architects: Keith Cottier AM 2264, Glynn N Evans 2839, Michael Heenan 5264, Peter Ireland 6661, Reginald Smith 3312, Peter Stronach 3372. awneroa sage ~ $100 (Pre jents\ 82707 _ritaririg annie Men gen 07703_PeetF aan oe
Page 20
ADDITIONS & ALTERATIONS 1 TRISTANIA DRIVE MARCUS BEACH “PRSECATON oF DoT STRUCT RN. Me 0 CONSTRUCTION OF EW BTRLICTURE TO FUTURE see eee eucraeown cnnca neces B TEeeP RR SO ONT MTOR Rect RD Line Case sep oF Spee Sa vp ea eee ee Pune STRUTT, | ARRAHOEMENT & BZES OF BTRUCTURAL MEMBERS FOR NEW WORK NOMINAL ONLY, PENDING STRUCTURAL DEBOM © ERNE ayo 00m BOER Pe ConA reer © UMS RS CPS Te © MARE a re ' ‘Rema srenact, fan. Cat SP ee hee ie ‘Not For Construction — IT CLIENT DETAILS OR CENTRE CUENT C Loco mm ALLEN JACK+COTTIER 6) 7 ag 1200 te 81 7 2004 200 Abo 08 068 72 28 | NOTES & LEGENDS iy Ovag as Tee NTs AQ000 A
Page 21
serwr07 + 125 5 2090 vos + 1m0 125 $0) 2190, IO * 8 a t 120 EXISTING POOL 1490, 420 | toy tt BILL CLARKSON 99 Bridge Streat, Fortitude Valey O 4006 porn} Not For Construction ALLEN JACK+COTTIER TRISTANIA DRIVE. MARCUS BEACH Q ot me. PLANS Floor & Roof Plans Teco Tomine Tem 1:100 A2100 B
Page 22
= TMU BILL CLARKSON 99 Bridge Streat, Fortitude Vallay Q 4006 — ALLEN JACK+COTTIER 34 Florence Saye Newstead, 4000 AUSTRALIA hs 00 7284S 2222 481 7S 2 AB OOD feet ELEVATION & SECTIONS (eeus\OremagieSSOS*~*~*~*~*~s 4100 A3100 B meer at veo bern rete\07 707 Meabanetiee Narn stam an NO7 07 ASO:
Page 23
KAD | AND USE SECTION FEES ac MOOSE | 7 RECEIPT TYPE SALE OF DOCUMENTS j Superseded Planning Scheme’ Documentation . 520 Copy of Permit/Approval Letter : 110 The Noosa Plan Documentation . 111. APPLICATION FEES- . Material Change of Use - Code/impact ; Consistent 5217 Inconsistent — 521 Assessment under Superseded Planning Scheme ; . _ 521° Modification to a Development Permit . .. _ §21 : Extension of a Currency Period : _ : 521 @ Operational Works - Landscaping : , . $21 Bldg Work assessable against the Planning Scheme SIS 521 _ PRE LODGEMENT REVIEW 7 Half. Hour © . 522 . One Hour : : : 522 ADVERTISING , / : Purchase Advertised Applications : 523 JETTIES © : Jetty Application Fee : . 524° ~ Jetty Bond an : : - St : : : (Category 4) _ BONDS : . / Performance Bond . : . iz _ 651 . : (Category 9) SIGNS ce - @ Registration Fee mo, oO an : ; 222 SEARCH FEE . : : : Search of Land Use Section file - : : . 112 Liquor Licensing Request . . 113 | ‘TOTAL. $ » OTS NAME: Leora Nave - Pf ADDRESS: - Py Hen Pf : — Pe Coax 174 _ NBD Laem keno SX FILENO: OS fu 47. ‘DATE: /38/3/o8 RECEIPTNO: | S94 7SS Signature of TP Officer: (7°. re AUTHORITY NO: | 7 [racs! earl,
Used in these records
08/0477 - Preliminary Building Works Assessable Against the Planning Scheme [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.5 MB (small file)
- File type
No other editions are linked here.