08/0477 - Preliminary Building Works Assessable Against the Planning Scheme [As Published] · 172008.477

of 23

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997 (DAS Assessment Checklist, Version 21.1, 3 March 2008
JPA. schedule 8 part 1. lable 5, item 1: iP Regulation. schedule 2. table 2. item 11, 1P Regulation. schedute }, table 5, item 2 iwild river area), Water Act 2000
section 966C, Wild Rivers Act 2005, section 434

 

1.

[ENVIRONMENTALLY RELEVANT ACTIVITY; WILD RIVER AREA ]

13 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?
(KX) No-Gotoa1s (] Yes

IPA 8 1 tatie 2 dem 7: IPA. schedule 4. pant 1. tebe 5. dems 2 ang 4 iP Reaulagon schedule 2, iatie 2, tems 1 and 23: Emeronmenial Promchan Act 1994. section
ver wes Wik Rivers Act 21:05, section 434° relevant wid river deciaraton Wiki Rivers Code.

 

 

 

WITHIN THE LIMITS OF A PORT J

1.4 Is any part of the premises within the limits of a port under the Transport infrastructure Act 1994?
X] No - Goto. 01.5

(1) Yes

IP Reguiation, schedule 2, table 2, items 15 and 16

 

(DECLARED FISH HABITAT AREA |

1.5 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?
[1X] No - Goto 01.6

O Yes - if answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA, schedule
8, this application requires assessment by the Department of Primary industries and Fisheries (DPI&F). If DPI&F is not the
Assessment Manager for the application, the agency has jurisdiction as Advice Agency.

IP Regulation, schedule 2, table 2, item 26
(COMMUNITY INFRASTRUCTURE : < qT
1.6 's any part of the premises designated for community infrastructure?
DX] No - Goto Q1.7

(Yes

IP Regulation schedule 2, table 3, item 7

WASTE WATER MANAGEMENT " —"

17 Does the proposal involve the establishment or expansion of a waste water disposal system?

[X] No -Endof Section? [(} Yes
IP Regulation, schedule 2. table 3, item 5

 

 

 

 

a
SECTION 2 + Section 2 must be completed when the application seeks approval to materially change the use of premises. v
I

 

 

‘PLANNING SCHEME a
21 ts the proposed use assessable under the planning scheme? (
(J No - Goo 022 DX] Yes - Complete Form 1, Part O and answer Q2.1.1 - 2.1.13 below J IK

If yes, does the application request that the proposal be assessed against a superseded planning scheme?
No — (_] Yes- (Complete Form 4 Attachment 1)

 

 

ISTATE-CONT ROLLED ROAD ~ = 2 8 : |
2.11 Is any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
CL Yes 0X] No
If not proposed use listed in schedule 5 of the Integrated Planning Regulation 1998 and does it exceed the specified
threshold?

X No oO Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
IP Regulation. schedule 2. table 3. items 1(a} and 3

Used in these records

About this file

File size
1.5 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0477 - Preliminary Building Works Assessable Against the Planning Scheme [As Published].pdf · 1.5 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.