INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.1, 3 March 2008

 

 

PLANNING SCHEME ]
44 \s any of the proposed operational work assessable under a planning scheme?
IX] No - Goto. 04.2 (L] Yes - (Complete Form 1, Part E) Answer Qs4.1.1 - 4.1.7 below.

ASSOCIATED WITH RECONFIGURING A LOT; RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT IN A WILD RIVER
"AREA
4.2 Is any of the proposed operational work associated with reconfiguring a lot and the reconfiguration is also assessable?

(] No -Gotoas3 (] Yes

IPA, schedule 8. part 1, lable 4. iter 2: IP Regulation. schedule { part? tabie §. item 1(c)
Wild Rivers code (Note: the cove does not currently contain applicable provisions for residential. industrial or commercial development inside @ designated urban

 

 

ama)
VEGETATION CLEARING; KOALA CONSERVATION; WILD RIVER AREA j
43 ls any of the proposed operational work for the clearing of native vegetation to which the Vegetation Management Act 1999
applies?

[DX] No -Gotoas4 (] Yes

IPA, schedule 8, part 1, table 4, items 1A-1G; IP Regulation. schedule 2. table 2, item 5 (vegetation clearing): IP Regulation, schedule 2, table 2. tom 34 (koala
conservation}; (P Regulation, schedule 1, part 3, table 4, item (vegetation clearing/wild river area}: Vegetation Management Act 1999, section 22A (vegetation
clearing/wald river area), Wild Rivers Act 2005, sections IF and 43A

|TAKING OR INTERFERING WITH WATER; WILD RIVER AREA * . : 4

44 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with water from a watercourse, lake or spring (other than using a water truck to pump water, and other than under
the Water Act 2000, section 20(2), (3) or (5)), or from a dam constructed on a watercourse or lake?

DX] No -Gotoa45 [_] Yes - Answer (a) and (b) below

IPA, schedule 8 pivt 1, table 4. inns dar IP Regulation. schedule 2, tadie 2, dem 8: IP Reguiation. schedule 1, peut 3. fabled, items 3 and 2A; Water Act 2000, section 9668 (wid aver
aga); Wikt Revers Act 2005, section 424: relevant wild river declaration, Wid Rivers Code

45 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with artesian water (other than using a water truck to pump water)?
No Goto Q46 oO Yes - (Complete Form 1, Part K,) This application requires assessment by the Department of Natural Resources and Water
(NRW). If NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

IPA, schedule 8, part 1, table 4, item 3(b); IP Regulation, schedule 2, table 2, item 8; iP Requiation, schedule 1, part 3, table 4, tem 3
Wild Rivers code (Note: the code does not curently contain applicable provisions for taking or Interfering with artesian water)

46 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking
overland flow water (other than using a water truck to pump water)?
[DX] No -Gotoa47 [] Yes - Answer (a) and (b) below
IPA schadute 8. part t, lable 4, item fei; IP Regutation, schedule 2. table 2, tem 8; iP Reyuletion. schedule 1, part 3, fable 4, tem 3. Walter Act 2000. section 966A (wil uver area),
Wit Rivers Act 2005. section 434° relevant wild river decierabon: Wid Rivers Code.
47 Is any of the proposed operational work for any thing constructed or installed that allows, under the Wafer Act 2000, for taking or
interfering with subartesian water (other than using a water truck to pump water)?
[DX] No -Gotoass (_] Yes

IPA. schedule 8. part 1. table 4, item 3(c) fi), 1P Regulation. schedule 2, table 2, iten 8 IP Regulation. schedule 1. part 3, table 4, item 3
Water Act 2000, section 966A (wild river area)(Note: no current Wild River decteration identifies taking or interfenng with subartesian water as assessable)
Wild River code (Note: the code does not currently contain applicable provisions for sub artesian water)

  

48 Does any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for
interfering with overland flow water (other than using a water truck to pump water)?
[XJ No -Gotoa49 {_] Yes - Answer both (a) and (b) below

IPA soheduie 8. part 1. tatia 4. eins cj) and 3d): #P Reguianon. scfedule 2, table 2. item &: iP Reguiston, schaduie 1, peri 2 tehle 4. item 34. Water Act 2090, section 9685 (nid
iver area), refevant wid tver declaration; Wid Rivers Code.

 

49 ls the proposed operational work for the following?

(i) For the construction of a referable dam as defined under the Water Act 2000 [& No 0 Yes
(ii) To increase the storage capacity of a referable dam by more than 10% & No O Yes

If yes to either or both (i) or (ii) above - (Complete Form 1, Part Ks} This application requires assessment by the Department of Natural Resources and

Water (NRW). if NRW is not the Assessment Manager for the application, the agency has jurisdiction as
Concurrence Agency.

JPA. schedule 8, part 1. lable 4, item 4: IP Regulation, schedule 2. table 2. item 10

Used in these records

About this file

File size
1.5 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0477 - Preliminary Building Works Assessable Against the Planning Scheme [As Published].pdf · 1.5 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.