Skip to the record
Search everything, all in one place.

Council archive · source document

08/0477 - Preliminary Building Works Assessable Against the Planning Scheme [As Published] · 172008.477

of 23

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997 Part 0, Version 3.1, 3 March 2008

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

[Mandatory Information |
6. Confirm that the following mandatory information accompanies this application:
es nation of Method of lodgement
Forall applications —_ : — — |
(i) Plans showing the nature and location of the proposed use on the premises and a statement about the
intensity and scale of the proposed use (e.g. number of employees, days and hours of operation, number of visitors, & Confirmed
number of seats, capacity of storage area}
When the application involves reuse of existing buildings
(ii) Plans showing the size and location of the buildings to be reused [xX] Confirmed
(1 _ Not applicable
When the application involves new building work _ ]
(iii) Plans showing the size and location of the proposed new building work &) Confirmed
(] Not applicable
When the application involves reuse of other existing works ° ~
(iv) Plans showing the nature and location of the works to be reused (J Confirmed
([] Not applicable
When the application involves new operational work | ° a
(v) Plans showing the nature and location of the proposed new operational works X Confirmed
{[]_ Not applicable
OFFICE USE ONLY
Date received Reference numbers

 

 

 

 

Advice for completing Part D

 

General advice

Part A must also be completed for all IDAS development applications

The applicant is responsible for answering all
another question. ;
When paying fees to the Environmental ‘
process from the information sheet Elects

fice

Electronic Funds Transfer (EFT) payment fon to this application.

   

Va tesponse there is a statement to go directly to
56 ) for coastal development applications, use the

ironmental Protection Agency (EPA) and securely attach the form

 

 

 

Q3 A development permit authorises development to occur. A preliminary approval is a step in the approval process and does not authorise
development to occur - a subsequent application for a development permit must be sought.
Table O If the MCU application involves operational work that is the building of a retaining wall on the premises, the application is taken also to be for the

operational work if approval for the operational work has not been applied for in this application or in a separate application.

 

 

Used in these records

About this file

File size
1.5 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0477 - Preliminary Building Works Assessable Against the Planning Scheme [As Published].pdf · 1.5 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.