Council archive · source document
08/0477 - Preliminary Building Works Assessable Against the Planning Scheme [As Published] · 172008.477
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
Table D Complete if the pr remises are adjacent to or associated with a water body, watercourse or aquifer (e.g. river, creek, fake, cana/)
‘Name of water body, watercourse or aquifer (if known) j
{1
Table E Complete if the > premises are on Strategic Port Land under ‘the Transport Infra Infrastructure Act 1994
- Lot on plan description for strategic port Hand : Port Authority for the lot
[1
Table F Complete if the premises are in tidal water
[1
Name of local government for the tidal area fit appcable) “| _ Name of port authority for the tidal area (tf appScable)
3. Indicate the total area of the premises on which the development is proposed: (Note: The total area may inchide land both above and below water)
Total area of premises |
784.00 (Xjm? (hectares {Tick applicable unit)
‘Existing use of the premises . . . ]
4. — Current use/s of the premises: (e.g. vacant land, house, townhouses, apartment building, shop, service station, school, sugar cane farming etc.)
{1 House |
5. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overtand flow, water efc.)?
® No O Yes - Ensure the type, location and dimensions of each easement are included in plans, submitted with the application
[Froposal details . ” - |
6. Brief description of the proposal (e.g. 6 unit apartment building, 30 tot residential subdivision, a bore, aquaculture)
House
7. Does the poposal include new buildings or operational work (including any services) on the premises?
&® No O Yes - Ensure the nature, focation and dimensions of the proposed works ere included in plans, submitted with the application
‘Resource entitlement (/ appicable)_- further information is provided in the advice section ai the end of the form |
8. Does the application involve taking or interfering with a State resource and therefore require a resource entitlement? (e.g. the application
invoWves State land (leased and freehold), declared Fish Habitat areas, taking quarry material, taking or interfering with water under the Water Act 2000, etc.)
xX] No - Go fo Q9 oO Yes - Complete Table G - provide details for each evidence required on a separate row. if applicable. Evidence of resource
allocation or entitlement must be submitted with the application. You do not need to answer Q9 - go fo the next section.
{Owner's consent (if appicatie) __- furlher information is provided in the advice section at the end of the forn ]
9. Complete Table H for applications involving a material change of use; reconfiguration of a lot; work on land below high-water mark and
not within a canal as defined under the Coastal Protection and Management Act 1995; or work on rail corridor land defined under the
Transport Infrastructure Act 1994 - provide details for each owner on a separate row, or on an altachment to this form if applicable.
Premises Owner's namels ~~” Details of the premises owned , . |: Date consent
Table H and postal address {street adeéess or lot on plan description) Owner's signature was obtained
1 See Attached Letter
* Owner's signature cannot be provided on the form if you intend to submit the application electronically. Owner's consent must be provided to the assessment manager on an
attachment containing appropriate written documentation of the owner's consent. If the owner is a company, $127 of the Corporations Act 2001 (Cwealth) details how a
company may sign as owner. Templates for the provision of cwner's consent are available on the IPA website .
{Attachments and supporting information (Compkte Table I - Use a separate row for each type of attachment or Information, including information required
inder this Part) Please ensure all documentation submitted with this form, including other Parts of Form 1, or owner's consent, etc, are securely attached to this Part of the Form.
“Description of attachment oF information
Title @Feppicable) Method of detivery to |
Table { (49. Part C of Farm 1, cope Se pete (e.g. General Author James StroetTratfc Report Date assessment manager
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0477 - Preliminary Building Works Assessable Against the Planning Scheme [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.5 MB (small file)
- File type
No other editions are linked here.