Court Judgement 16 July 2021 - Case 176 of 2019
Very large file: it may take a few minutes
The original of this document is very large (18.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
2
19020 A.301 C Elevations 12-06-21
Nature and Extent of Approved Use
3. Each ancillary dwelling unit must not be let independently of the industrial use conducted
on the lower level and may only be occupied by the caretaker, owner or employee of the
industrial use conducted on the lower level.
4. Each ancillary dwelling unit must not be separately titled to the industrial use on the
lower level and must remain associated and ancillary to the industrial use on the lower
level. The ancillary dwelling unit is not permitted to be used for bed and breakfast
accommodation and/or short-term accommodation.
5. Each ancillary dwelling unit must not exceed the gross floor area identified on the
Approved Plans.
6. All ancillary dwelling unit windows must be double glazed.
7. Partition walls for each ancillary dwelling unit must be 180mm in width and comply with
AS/NZS 1664.1 SUPP 1:1997 together with AS/NZS 1664.1:1997 AMDT 1.
Currency Period
8. The development approval lapses if the works have not been completed and all
conditions of approval been complied with by 17 June 2027, unless an application to
extend the currency period is approved by Council.
Compliance with 132007.738.04
9. All conditions on development approval 132007.738.04 for a Development Permit for
Material Change of Use for Industrial Business Type 1 – Warehouse and Industrial
Business Type 2 – Production, Alteration, Repackaging & Repairing) must be met.
5. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form
part of the assessment manager conditions:
1. All developments and/or changes to existing developments may require payment of
“Infrastructure Charges” (as applicable) in accordance with Council’s “Charges
Resolution” made pursuant to the planning legislation and regulations current at the time
of issue.
2. The proposed ancillary dwelling units are located in an area that is zoned Low Impact
Industry under the Noosa Plan 2020 and a range of industrial uses are planned to
establish that may generate noise, odour, dust, waste nuisance or the like. These
industrial businesses will not be required to include additional measures to address the
potential impacts from these industrial uses on the dwelling units given they should
reasonably be expected.
6. FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit Required Subject of the required Development Permit
Development Permit for Building Works All building works
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.