Council archive · source document
07/0466 - Modification to Alternative Siting Provisions [As Published] · 132007.466
o INTEGRATED PLANNING ACT 1997 Development within the limits of a port For more information refer to Guide 18. For information about prescribed tidal work refer to Guide 24, ifyou answeied "YES" to Q12, the application triggers referral to the Pot Authority. . The Port Authority is a concurrence agency ifthe development is - within 200m of a shipping channel or an entry “and exit shipping corridor for the port * within 1000m of a swing basin, a commercial shipping wharf, a mooring, anchorage or spoil grounds; : * within 1000m of a planned port facility * identified in a land use plan approved under the Transport Infrastructure Act 1994. = In all other situation the Port Authority is an advice agency. IDAS Assessment Checklist, Version 19.0, 2 March 2007 12. Does the application involve development below high water mark’? and within the limits of a port oe infrastructure Act 1994? 0. [DYES - compiete Part M of Form 1, or Part P of Form 1 if the work is prescribed tidal work Marinas For more informallon refer to Guide 18. For Information about whether a marina is prescribed tidal work refer to Guide 24, The local government is the assessment manager for alt prescribed tidal work, If you answered "YES" to Q13, the application triggers referral to Queensland Fire and Rescue Service as an advice agency. © Tidal works in strategic port land tidat areas For more information refer to Guide 18. Unless you answered "NO to Q14, the retevant Port Authority is the assessment manager for the application and the Environmental Protection Agency (EPA) and Queensland Transport (QT) ate concurrence agencies for the application. Heritage For further information refer to Guide 19. If you answered "YES" to Q15, the application triggers referral to the Queensland Heritage Council as concurrence agency for the application. Declared catchment areas For more information, including a list of the declared catchment areas within Queensland, tefer to Guide 13, Unless you answered “none of the above" to Q16, the application requires assessment by the Oepartment of Natural Resources and Water (NRW). \ an agency olher than NRW is the assessment manager for the application, NRW is a concurrence agency for the application in relation to thls matter. 13. Does the application involve operational work that is tidal work for a marina'® with more than 6 we 0 (1 YES - complete Part M of Form 1, or Part P of Form 1 if the tidal work is prescribed tidal work 14, Does the-application involve tidal works within a strategic port land tidal area20? 10 (1 YES - complete Part M of Form 1 15. Does the application involve development ina heritage registered place as defined under the oe Heritage Act 1992? LAAN (DYES - complete Part C of Form 1 16. The application is in an area declared to be a catchment area under the Water Act 2000 and involvgs-(tick the applicable box/es) BR) reconfiguring a lot if any lot resulting from the reconfiguration is less than 16 hectares; CI (ii) development assessable against the planning scheme involving the establishment or expansion of a waste water disposal system, other than a disposal system for carrying wi an environmentally relevant activity under the Environmental Protection Act 1994; (iii) none of the above 18 High water mark is defined in the Coastal Protection and Management Act 1995 and means the erdinary high water mark at spring tide. 19 Marina is defined in the Transport Operations (Maritime Pollution) Reguiation 1995. 20 Strategic port tand tidat areas are the areas generally 50 metres seaward of high water mark adjacent to strategic port land. Page 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0466 - Modification to Alternative Siting Provisions [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.7 MB (small file)
- File type
No other editions are linked here.