Skip to the record
The first. The best. The only NoosaWatch™.

Council archive · source document

07/0466 - Modification to Alternative Siting Provisions [As Published] · 132007.466

of 26

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

  
  

oe

    

    

INTEGRATED PLANNING ACT 1997

Form 1 Development Application

Operational &/or building work

assessable against a local government's planning scheme

__ Part, Version 2.0, 4 October 2004

  

 

 
 

 

Completion of all question on Part E is mandatory for all applications involving the assessment of operational work and/or building work (inciuding detailed
engineering plans and other plans, detailed engineering plans for subdivisional works and conceptual design plans for. engineering & buikling work when the application does -
not involve assessment of a material change of use of premises at the same time) assessable against a local givemment’s planning scheme.

 

Nature of the application

A development permit authorises
development to occur, while a preliminary

1.

This ligation is for (tick one (1} or both if applicable)
‘eliminary approval - provide details of the type of work eg. roadwork, stormwater, water and sewerage

 

 

 

 

 

 

 

ge

‘approval is a step in the approval process infra e, etc
and does not authorise development to occur. [ »
The types of work that are assessable against] ain 1 ¢y SN
a planning scheme are determined by the .
waoy for a pata fal government and felopment permit - provide details of the type of work eg. iaadwork, stormwater, water and sewerage
To determine the types of work that are ina eet
il
assessable under a particular planning | DNELUA «©, |
scheme, contact the retevant local :
govemment 2. Are the works subsequent to a previous development approval?
fo (2 YES - provide details of all previous approvals (eg. file references) °
3. _ Is the subdivision for a canal estate?
[No Ces
Portable Long Service Leave levy (if |4. 1s payment of a Portable Long Service Leave (PLSL) levy applicable to the proposal?

applicable)

Prior to issuing a development permit for the
works, the assessment manager is required
by law to ‘sight an approved form, issued by
Qleave, which signifies that the PLSL levy

SA SHIRE COURGL
HOF ROT COUSTER

 

 

E1 YES - complete 05
[ELNO=05, 6 8 7 do not apply

Has the PLSL levy been paid?
[2 YES - completeas
— the applicable levy must be paid before a development permit can be given for the works

How much was paid?
What is the receipt number of the payment? ,

 

 

 

PLEASE NOTE

This application cannot be accepted unless accompanied by Part A of Form 1.

 

The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information

requested by Part A and any other relevant part of Form 1.

 

OFFICE USE ONLY (appicabe fo assessment manager)

 

 

DATE RECEIVED

 

REFERENCE
NUMBER/S

 

 

 

 

Used in these records

About this file

File size
1.7 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0466 - Modification to Alternative Siting Provisions [As Published].pdf · 1.7 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.