Council archive · source document
07/0466 - Modification to Alternative Siting Provisions [As Published] · 132007.466
oe
INTEGRATED PLANNING ACT 1997
Form 1 Development Application
Operational &/or building work
assessable against a local government's planning scheme
__ Part, Version 2.0, 4 October 2004
Completion of all question on Part E is mandatory for all applications involving the assessment of operational work and/or building work (inciuding detailed
engineering plans and other plans, detailed engineering plans for subdivisional works and conceptual design plans for. engineering & buikling work when the application does -
not involve assessment of a material change of use of premises at the same time) assessable against a local givemment’s planning scheme.
Nature of the application
A development permit authorises
development to occur, while a preliminary
1.
This ligation is for (tick one (1} or both if applicable)
‘eliminary approval - provide details of the type of work eg. roadwork, stormwater, water and sewerage
ge
‘approval is a step in the approval process infra e, etc
and does not authorise development to occur. [ »
The types of work that are assessable against] ain 1 ¢y SN
a planning scheme are determined by the .
waoy for a pata fal government and felopment permit - provide details of the type of work eg. iaadwork, stormwater, water and sewerage
To determine the types of work that are ina eet
il
assessable under a particular planning | DNELUA «©, |
scheme, contact the retevant local :
govemment 2. Are the works subsequent to a previous development approval?
fo (2 YES - provide details of all previous approvals (eg. file references) °
3. _ Is the subdivision for a canal estate?
[No Ces
Portable Long Service Leave levy (if |4. 1s payment of a Portable Long Service Leave (PLSL) levy applicable to the proposal?
applicable)
Prior to issuing a development permit for the
works, the assessment manager is required
by law to ‘sight an approved form, issued by
Qleave, which signifies that the PLSL levy
SA SHIRE COURGL
HOF ROT COUSTER
E1 YES - complete 05
[ELNO=05, 6 8 7 do not apply
Has the PLSL levy been paid?
[2 YES - completeas
— the applicable levy must be paid before a development permit can be given for the works
How much was paid?
What is the receipt number of the payment? ,
PLEASE NOTE
This application cannot be accepted unless accompanied by Part A of Form 1.
The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information
requested by Part A and any other relevant part of Form 1.
OFFICE USE ONLY (appicabe fo assessment manager)
DATE RECEIVED
REFERENCE
NUMBER/S
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0466 - Modification to Alternative Siting Provisions [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.7 MB (small file)
- File type
No other editions are linked here.