engineers & project managers
DR:AS 15633-1
24 September 20105
The Chief Executive Officer
Noosa Council
PO Box 141
TEWANTIN QLD 4565
ATTENTION: Planning & Development - Mark Lewis
Dear Mark
RE: PROPOSED DRIVEWAY TO 22 HOOP PINE ROAD, EERWAH VALE
OPERATIONAL WORKS APPLICATION
We refer to our recent discussions regarding the provision of a driveway/property
access at the above address and enclose the following documents in support of
a Development Application for Operational Works.
• IDAS Form 1;
• IDAS Form 6;
• IDAS Checklist 4;
• 2 copies of Tod Consulting Drawings 15633 C01 to CO?;
• Our Client's cheque for the Operational Works Application fees for
$1,614.00.
Please note that the driveway is located within the Hoop Pine Road reserve but it
is intended to be a private access only and not public road. Notwithstanding, we
have provided a turning area at the bottom of the drive as requested in case a
member of the public does drive down by mistake.
The subject property is located in the Sunshine Coast Council region, however
the majority of the work is with the Noosa Shire Council region, hence our
Application to you. Sunshine Coast Council have been consulted and have
advised that they do not require an Operational Works Application as the work
within their boundary can be considered self assessable. They have advised that
a permit to undertake work within the road reserve will be required only.
Note that we are unsure whether this Application needs to be referred to SARA
for clearing of native vegetation. We have ticked Item 3 in Section 2.1 of IDAS
Checklist 4 as we believe the clearing is mentioned in part 5(g) of Schedule 24,
Part 2 of the Sustainable Planning Regulation 2009. As such, this aspect of the
Operational Work is not assessable development, however your confirmation of
our assessment would be appreciated.
Development Counter
Noosa: 07 54499600
SunshinE Coast: 075329 3}90
outsta
Mackay: 07 4840 2337
PO Box 61, Noosavilte, QLD4566, Australia
www.todconsulting.com TOO CONSUlTING PTY LTD ABN: 39128805336
G:"2£tp". R: .~.,,]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of pages 2 to 22 (of 25)
Page 2
We trust the above is satisfactory and look forward to your approval. Should you have any queries regarding this matter please contact the undersigned. Yours faithfully DOUG REYNOLDS TOO CONSULTING blc Rick Templeton
Page 3
Department of State Development, Infrastructure and Planning -
IDAS form 1-Application details
(Sustainable Planning Act 2009 version 4.1 effective 4 July 2014)
This form must be used for ALL development applications.
You MUST complete ALL questions that are stated to be a mandatory requirement unless otherwise identified on this
form.
For all development applications, you must:
• complete this form (/DAS form 1-Application details)
• complete any other forms relevant to your application
• provide any mandatory supporting information identified on the forms as being required to accompany your
application.
Attach extra pages if there is insufficient space on this form.
'\11 terms used on this form have the meaning given in the Sustainable Planning Act 2009 (SPA) or the Sustainable
.'Ianning Regulation 2009.
This form and any other IDAS form relevant to your application must be used for development applications relating to
strategic port land and Brisbane core port land under the Transport Infrastructure Act 1994 and airport land under the
Airport Assets (Restructuring and Disposal) Act 2008. Whenever a planning scheme Is mentioned, take it to mean land
use plan for the strategic port land, Brisbane core port land or airport land.
I
I PLEASE NOTE: This fo~ is not required to accompany requests for compliance assessme~
This form can also be completed online using MyDAS at www.dsdip.gld.gov.au/MyDAS
I Mandatory requirements
Applicant details (Note: the applicant is the person responsible for making the application and need not be the owner
of the land. The applicant is responsible for ensuring the information provided on alllDAS application forms is correct.
Any development permit or preliminary approval that may be issued as a consequence 01 thiS application will be issued
to the applicant.)
. ~ame/s (individual or company name in full) I Mr Rick Templeton
For companies, contact name C/- Tod Consulting Pty Ltd - Doug Reynolds
Postal address PO BOX61
Suburb Noosaville
State OLD 1 Postcode 14566
Country Australia
Contact phone number I 07 5449 9600
Mobile number (non-mandatory requirement)
Fax number (non-mandatory requirement)
Great state. Great opportunity.
Queensland
C;nVi>rnmpnt _
Page 4
Email address (non-mandatory requirement) I [email protected]
Applicant's reference number (non-mandatory 115633
requirement)
1. What is the nature of the development proposed and what type of approval is being sought?
Table A-Aspect 1 of the application (If there are additionai aspects to the application please list in Table B-Aspect 2.)
a) What is the nature of the development? (Please only tick one box.)
o Material change of use 0 Reconfiguring a lot 0 Building work ~ Operational work
b) What is the approval type? (Please only tick one box.)
o Preliminary approval o Preliminary approvai
under s241 and 5242
~ Development permit
under s241 of SPA
of SPA
c) Provide a brief description of the proposal, including use definition and number of buildings or structures where
applicable (e.g. six unit apartment building defined as a multi-unit dwelling, 30 lot residential subdivision etc.)
I Driveway construction within Council road reserve I
d) What is the level of assessment? (Please only tick one box.)
o Impact assessment ~ Code assessment
Table B-Aspect 2 of the application (If there are additional aspects to the application please list in Tabie C-
Additional aspects of the application.)
a) What is the nature of development? (Please only tick one box.)
o Material change of use 0 Reconfiguring a lot 0 Building work 0 Operational work
b) What is the approval type? (Piease only tick one box.)
o Preliminary approval o Preliminary approval o Development
under s241 of SPA under s241 and s242 permit
of SPA
c) Provide a brief description of the proposai, including use definition and number of buildings or structures where
applicable (e.g. six unit apartment building defined as a mufti-unit dwelling, 30 lot residential subdivision etc.)
d) What is the level of assessment?
o Impact assessment 0 Code assessment
Table C-Additional aspects of the application (If there are additional aspects to the application please list in a
separate table on an extra page and attach to this form.)
o Refer attached schedule 0 Not required
IDAS form I-Application details
Version 4.1-4 July 2014
Page 5
2. Location of the premises (Complete Table D andlor Table E as applicable. Identify each lot in a separate row.)
Table D-Street address and lot on plan for the premises or street address and lot on plan for the land adjoining or
adjacent to the premises (Note: this table is to be used for applications involving taking or interfering with water).
(Attach a separate schedule if there is insufficient space in this table.)
~ Street address and lot on plan (All lots must be listed.)
D Street address and lot on plan for the land adjoining or adjacent to the premises (Appropriate for
development in water but adjoining or adjacent to land, e.g. jetty, pontoon. All lots must be listed.)
Street address Lot on plan Local government area
description (e.g. Logan, Cairns)
Lot Unit Street Street name and official Post- Lot no. Plan type
no. no. suburb/locality name code and plan no.
i) 22 Hoop Pine Road, 4562 11 SP184289 Sunshine Coast
Eerwah Vale CouncillNoosa Council
ii)
Iii)
Planning scheme details (If the premises involves multiple zones, clearly identify the relevant zonels for each lot in a
separate row in the below table. Non-mandatory)
Lot Applicable zone / precinct Applicable local plan / precinct Applicable overlay/s
i)
ii)
iii)
Table E-Premises coordinates (Appropriate for development in remote areas, over part of a lot or in water not
adjoining or adjacent to land e.g. channel dredging in Moreton Bay.) (Attach a separate schedule if there is insufficient
space in this table.)
Coordinates Zone Datum Local government
(Note: place each set of coordinates in a separate row) reference area (if applicable)
Easting Northing Latitude Longitude
D GDA94
D WGS84
D other
3. Total area of the premises on which the development is proposed (indicate square metres)
1100,000
4. Current usels of the premises (e.g. vacant land. house, apartment building, cane farm etc.)
I Vacant Land
IDAS form I-Application details
Version 4.1-4 July 2014
Page 6
5. Are there any current approvals (e.g. a preliminary approval) associated with this application? (Non-
mandatory requirement)
~ No D Yes-provide details below
List of approval reference/s Date approved (dd/mm/yy) Date approval lapses (dd/mm/yy)
6. Is owner's consent required for this application? (Refer to notes at the end of this form for more information.)
~ No
D Yes-complete either Table F, Table G or Table H as applicable
Table F
~ame of ownerls of the land
l!We, the above-mentioned ownerls of the land, consent to the making of this application.
Signature of ownerls of the land
Date
Table G
Name of ownerls of the land I
D The owner's written consent is attached or will be provided separately to the assessment manager.
Table H
Name of ownerls of the land I
D By making this application, I, the applicant, declare that the owner has given written consent to the making of the application.
!. Identify if any of the following apply to the premises (Tick applicable box/es.)
D Adjacent to a water body, watercourse or aquifer (e.g. creek, river, lake, canal)-complete Table I
Table J
D On strategic port land under the Transport Infrastructure Act 1994-complete
D In a tidal water area-complete Table K
D On Brisbane core port land under the Transport Infrastructure Act 1994 (No table requires completion.)
D On airport land under the Airport Assets (Restructuring and Disposal] Act 2008 (no table requires completion)
D Listed on either the Contaminated Land Register (CLR) or the Environmental
the Environmental Protection Act 1994 (no table requires completion)
Management Register (EMR) under
Table I
Name of water body, watercourse or aquifer
IDAS form 1-Application details
Version 4.1-4 July 2014
Page 7
Table J
Lot on plan description for strategic port land Port authority for the lot
Table K
Name of local government for the tidal area (if applicable) Port authority for the tidal area (if applicable)
8. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow,
water etc)
[8J No 0 Yes-ensure the type, location and dimension of each easement is included in the plans submitted
9. Does the proposal include new building work or operational work on the premises? (Including any
services)
LJ No [8J Yes-ensure the nature, location and dimension of proposed works are included in plans submitted
10. Is the payment of a portable long service leave levy applicable to this application? (Refer to notes at the
end of this form for more information.)
[8J No-go to question 12 DYes
11. Has the portable long service leave levy been paid? (Refer to notes at the end of this form for more
information.)
o No
o Yes-complete Table L and submit with this application the yellow local governmenUprivate certifier's copy of the
receipted QLeave form
Table L
Amount paid Date paid QLeave project number (6 digit number
(dd/mm/yy) starting with A, B, E, L or P)
I
12. Has the local government agreed to apply a superseded planning scheme to this application under
section 96 of the Sustainable Planning Act 2009?
[8J No
o Yes-please provide details below
Name of local government Date of written notice given Reference number of written notice given
by local government by local government (if applicable)
(dd/mm/yy)
IDAS form 1-Applica/ion de/ails
Version 4.1-4 July 2014
Page 8
13. List below all of the forms and supporting information that accompany this application (Include alilDAS
forms, checklists, mandatory supporting information etc. that will be submitted as part of this application. Note:
this question does not apply for applications made online using MyDAS)
Description of attachment or title of attachment Method of lodgement to
assessment manager
Cover Letter By Mail
IDAS Form 1 and Checklist 4 By Mail
IDAS Form 6 - Building or Operational Work against a planning scheme By Mail
Associated Engineering Drawings by Tod Consulting ref 15633-C01 to C07 By Mail
114. Applicant's declaration
[;8] By making this application, I declare that all information in this application is true and correct (Note: it is unlawful to
lrovide false or misleading information)
Notes for completing this form
• Section 261 of the Sustainable Planning Act 2009 prescribes when an application is a properly-made application.
Note, the assessment manager has discretion to accept an application as properly made despite any non-
compliance with the requirement to provide mandatory supporting information under section 260(1)(c) ot the
Sustainable Planning Act 2009
Applicant details
• Where the applicant is not a natural person, ensure the applicant entity is a real legal entity.
Question 1
• Schedule 3 of the Sustainable Planning Regulation 2009 identifies assessable development and the type of
assessment. Where schedule 3 identifies assessable development as "various aspects of development" the
applicant must identify each aspect of the development on Tables A, Band C respectively and as required.
Question 6
• Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is required for
an application. Section 260(l)(e) ot the Sustainable Planning Act 2009 provides that if the owner's consent is
required under section 263, then an application must contain, or be accompanied by, the written consent of the
owner, or include a declaration by the applicant that the owner has given written consent to the making of the
application. It a development application relates to a state resource, the application is not required to be supported
by evidence of an allocation or entitlement to a state resource. However, where the state is the owner of the
subject land, the written consent of the state, as landowner, may be required. Allocation or entitlement to the state
resource is a separate process and will need to be obtained before development commences.
Question 7
• If the premises is listed on either the Contaminated Land Register (CLR) or the Environmental
Management Register (EMR) under the Environmental Protection Act 1994 it may be necessary to
seek compliance assessment. Schedule 18 of the Sustainable Planning Regulation 2009 identifies
where compliance assessment is required.
Question 11
• The Building and Construction Industry (Portable Long SeNice Leave) Act 1991 prescribes when the portable long
service leave levy is payable.
• The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy
are prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002.
IDAS fonn 1-App/icalion delails
Version 4.1-4 July 2014
Page 9
Question 12
• The portable long service leave levy need not be paid when the application is made, but the Building and
Construction Industry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a development
permit is issued.
• Building and construction industry notification and payment forms are available from any Queensland post office or
agency, on request from QLeave, or can be completed on the QLeave website at www.qleave.qld.gov.au. For
further information contact QLeave on 1800803481 or visit www.qleave.qld.gov.au.
Privacy-The information collected in this form will be used by the Department of State Development, Infrastructure
and Planning (DSDIP), assessment manager, referral agency andlor building certifier in accordance with the
processing and assessment of your application. Your personal details should not be disclosed for a purpose outside of
the IDAS process or the provisions about public access to planning and development information in the Sustainable
Planning Act 2009, except where required by legislation (including the Right to Information Act 2009) or as required by
Parliament. This information may be stored in relevant databases. The information collected will be retained as
required by the Public Records Act 2002.
"FICE USE ONLY
Date received ____________ 1 Reference numbers
NOTIFICATION OF ENGAGEMENT OF A PRIVATE CERTIFIER
To Council. I have been engaged as the private certifier for the
~---------------I
building work referred to in this application
BSA Certification license Building
Date of engagement Name number classificationls
QLEAVE NOTIFICATION AND PAYMENT (For completion by assessment manager or private certifier if
applicable.)
Date receipted
Name of officer
Amount paid form sighted by
I 'Jescription of the work QLeave project
number (5)
Date paid
assessment
who sighted the
form
manaoer
The Sustainable Planning Act 2009 is administered by the Department of State Development, Infrastructure and
Planning. This form and all other required application materials should be sent to your assessment manager and any
referral agency.
Department of State Development, Infrastructure and Planning
PO Box 15009 City East Qld 4002
1.113 QGOV (13 74 68)
[email protected] IDAS form I-Application details
Version 4.1-4 July 2014
www.dsdip.qld.gov.au
Page 10
Department of State Development, Infrastructure ann Planning -
Schedule 3 Assessable Development
Checklist 4-0perational work
(Sustainable Planning Act 2009 version 4.1 effective 1 October 2014)
This checklist only applies when the development application seeks approval for operational work. Before completing
this checklist. please complete Checklist 1-Various aspects of development.
You may complete this checklist as part of your development application. The checklist will:
• help you identify whether you need to make a development application for the proposed development
• help you identify the relevant Integrated Development Assessment System (IDAS) form you need to complete as
part of your application
• assist in identifying the assessment manager or referral agency for development that is assessable development
under schedule 3 of the Sustainable Planning Regulation 2009.
If your development involves reconfiguring a lot, building work or material change of use, it is recommended you
complete Checklisf 2-Material change of use. Checklist 3-Reconfiguring a lot, or checklist 5-Building work, where
relevant.
If you are unsure of any answers to questions, phone or visit your local government. or go to the Department of State
Development. Infrastructure and Planning's website at www.dsdip.gld.gov.au.
All terms used in this checklist have the meaning given in the Sustainable Planning Act 2009 or the Sustainable
Planning Regulation 2009.
I Part 1-General questions
1.1 Is the operational work clearing native vegetation on:
• freehold land
• indigenous land
• any of the following under the Land Act 1994:
land subject to a lease
a road
trust land, other than indigenous land
land subject to a licence or permit?
0 No • Continue to question 1.2
[g] Yes • Complete part 2 of this checklist
1.2 Is any of the proposed operational work associated with reconfiguring a lot and the reconfiguration is
also assessable development?
[g] No • Continue to question 1.3
0 Yes • Complete part 3 of this checklist
Great state. Great opportunity. Queensland
r.nvl'mmpnt _
Page 11
1.3 Does any of the proposed operational work involve taking or interfering with:
• water from a watercourse, lake or spring, or from a dam constructed on a watercourse or lake
• artesian water as defined under the Water Act 2000, schedule 4
• overland flow water
• subartesian water
[2J No • Continue to question 1.4
D Yes • Complete part 4 of this checklist
1.4 Is the operational work the construction of a dam, or carried out in relation to a dam, and, because of the
works, the dam must be failure impact assessed?
[2J No • Continue to question 1.5
D Yes • Complete part 5 of this checklist
1.5 Is any of the proposed operationat work tidal works?
[2J No • Continue to question 1.6
D Yes • Complete part 6 of this checklist
1.6 Is any of the operational work proposed to be carried out completely or partly within a coastal
management district?
[2J No • Continue to question 1.7
D Yes • Complete part 7 of this checklist
1.7 Is any of the proposed operational work for constructing or raising waterway barrier works as defined
under the Fisheries Act 1994?
[2J No • Continue to question 1.8
0 Yes • Complete part 8 of this checklist
1.8 Is any of the proposed operational work to be carried out completely or partly within a declared fish
habitat area as defined under the Fisheries Act 1994?
[2J No • Continue to question 1.9
D Yes • Complete part 9 of this checklist
1.9 Is any of the proposed operational work removing, destroying or damaging marine plants as defined
under the Fisheries Act 1994?
[2J No • Continue to question 1.10
D Yes • Complete part 10 of this checklist
1.10 Does the proposal involve operational works that are high impact earthworks in the Great Barrier Reef
Wetland Protection Area?
~NO I. Continue to question 1.11
Checklist 4-Operational work
Version4.1-1 October 2014
Page 12
• Complete part 11 of this checklist
1.11 Does the proposal involve operational works that are the construction or modification of a levee?
~ No • End of checklist
D Yes • Complete part 12 of this checklist
I Part 2-Clearing native vegetation
I 2.1 Do any of the following apply?
The clearing is on premises to which structure plan arrangements apply. D Yes ~ No
The clearing is clearing, or for another activity or matter, mentioned in schedule 24, part 1 of D Yes ~ No
the Sustainable Planning Regulation 2009.
The clearing is mentioned in schedule 24, part 2 of the Sustainable Planning Regulation 2009, ~ Yes D No
as clearing for the particular land.
• If you answered yes to any of the above, this aspect of your operational work is not assessable development
• If you answered no to ALL of the above, continue to question 2.2
2.2 Is the proposed vegetation clearing for a relevant purpose under the Vegetation Management Act 1999,
section 22A for one or more of the following?
A project declared to be a coordinated project under the State Development and Public Works D Yes D No
Organisation Act 1971, section 26
Necessary to control non-native plants or declared pests D Yes D No
To ensure public safety D Yes D No
For relevant infrastructure and the clearing cannot reasonably be avoided or minimised D Yes D No
A natural and ordinary consequence of other assessable development for which a D Yes D No
development approval was given under the repealed Integrated Planning Act 1997, or a
development application was made under that Act, before 16 May 2003 and is outside an area
.Jeclared to be a declared area part 2, division 4, subdivision 2 of the Vegetation Management
Act 1999.
For fodder harvesting outside an area declared to be a declared area part 2, division 4. D Yes D No
subdivision 2 of the Vegetation Management Act 1999:
For thinning D Yes D No
For clearing of encroachment D Yes D No
For an extractive industry outside an area declared to be a declared area part 2, division 4, D Yes D No
subdivision 2 of the Vegetation Management Act 1999
For necessary environmental clearing D Yes D No
For high value agriculture clearing D Yes D No
For irrigated high value agriculture clearing D Yes D No
The Minister responsible for administering the Vegetation Management Act 1999 is satisfied D Yes D No
the development applied for is a for special indigenous purpose under the Cape York
Peninsula Heritage Act 2007 outside an area declared to be a declared area part 2, division 4,
subdivision 2 of the Vegetation Management Act 1999
Checklist 4-0peralional work
Version 4.1-1 October 2014
Page 13
Department of State Development, Infrastructure and Planning -
IDAS form 6-Building or operational work assessable
against a planning scheme
(Sustainable Planning Act 2009 version 3.0 effective 1 July 2013)
This form must be used for development applications for building work or operational work assessable against a
planning scheme.
You MUST complete ALL questions that are stated to be a mandatory requirement unless otherwise identified on this
form.
For all development applications, you must:
• complete IDAS form I-Application details
• complete any other forms relevant to your application
• provide any mandatory supporting information identified on the forms as being required to accompany your
application.
Attach extra pages if there is insufficient space on this form.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 (SPA) or the Sustainable
Planning Reguiation 2009.
This form must be used for building work or operational work relating on strategic port land and Brisbane core port land
under the Transport Infrastructure Act 1994 and airport land under the Airport Assets (Restructuring and Disposal) Act
2008 that requires assessment against the land use plan for that land. Whenever a planning scheme is mentioned,
take it to mean land use plan for the strategic port land, Brisbane core port land or airport land.
----------
This form can also be completed online using MyDAS at www.dsdip.gld.gov.au/MyDAS
I Mandatory requirements
1. What is the nature of the work that requires assessment against a planning scheme? (Tick all applicable
boxes.)
~ Operational work-complete Table B
D Building work-complete Table A
Table A
a) What is the nature of the building work (e.g. building, repairing, altering, underpinning, moving or demolishing a
building)?
b) Are there any current approvals associated with this application? (e.g. material change of use.)
D No D Yes- provide details below
List of approval reference/s Date approved (dd/mm/yy) Date approval lapses (dd/mm/yy)
Great state. Great opportunity. Queensland
(;nvprnmpnt _
Page 14
Table B
a) What is the nature of the operational work? (Tick all applicable boxes.)
[:gJ Road works [:gJ Stormwater D Water infrastructure
D Drainage works [:gJ Earthworks D Sewerage infrastructure
D Landscaping D Signage D Clearing vegetation under the planning scheme
D Other-provide details
b) Is the operationai work necessary to facilitate the creation of new lots? (E.g. subdivision.)
[:gJ No D Yes-specify the number of lots being created I~ _
c) Are there any current approvals associated with this application? (E.g. material change of use.)
[:gJ No D Yes-provide details below
List of approval reference/s Date approved (dd/mm/yy) Date approval lapses (dd/mm/yy)
2. What is the dollar value of the proposed building work? $
(Inc GST, materials and labour.)
3. What is the dollar value of the proposed operational work? $65,000
(Inc GST, materials and labour.)
I Mandatory supporting information
4. Confirm that the following mandatory supporting information accompanies this application
I 'IIandatory supporting information Confirmation of Method of
lodgement lodgement
All applications involving building work or operational work
A site plan drawn to an appropriate scale (1:100, 1:200 or 1:500 are [:gJ Confirmed
recommended scales) which shows the following:
• the location and site area of the land to which the application relates
(relevant land)
• the north point
• the boundaries of the relevant land
• the allotment layout showing existing lots, any proposed lots (including the
dimensions of those lots), existing or proposed road reserves, building
envelopes and existing or proposed open space (note: numbering is
required for all lots)
• any existing or proposed easements on the relevant land and their
function
• any access limitation strips
• all existing and proposed roads and access points on the relevant land .
IDAS fonn 6-Building or operational work assessable
against a planning scheme
Version 3.0-1 July 2013
Page 15
A statement about how the proposed development addresses the local [8J Confirmed
government's planning schemes and any other planning documents relevant
to the application.
A statement addressing the relevant part(s) of the State Development o Confirmed
Assessment Provisions (SDAP). [8J Not applicable
Applications for building work (including extensions and demolition that is assessable development)
Floor plans drawn to an appropriate scale (1:50,1:100 or 1:200 are o Confirmed
recommended scales) which show the following: [8J Not app[icable
• the north point
• the intended use of each area on the floor plan (for commercial, industrial
or mixed use developments only)
• the room layout (for residential development only) with all rooms clearly
labelled
• the existing and the proposed built form (for extensions only)
• the gross floor area of each proposed floor area .
E[evations drawn to an appropriate scale (1:100,1:200 or 1:500 are o Confirmed
recommended scales) which show plans of a[1building elevations and [8J Not applicable
facades, clearly label[ed to identify orientation (e.g. north elevation).
Plans showing the size, location, proposed site cover, proposed maximum o Confirmed
number of storeys, and proposed maximum height above natural ground level [8J Not applicable
of the proposed new building work.
Plans showing the extent of any demolition that is assessable development. o Confirmed
[8J Not applicable
Applications for operational work involving earthworks (filling and excavating)
Drawings showing: [8J Confirmed
• existing and proposed contours o Not applicable
• areas to be cut and filled
• the location and level of any permanent survey marks or reference
stations used as datum for the works
• the location of any proposed retaining walls on the relevant land and their
height
• the defined flood leve[ (if applicab[e)
the fill level (if applicable).
Applications for operational work involving roadworks
Drawings showing: [8J Confirmed
• existing and proposed contours o Not applicable
• the centreline or construction line showing chain ages, bearings, offsets if
the construction line is not the centreline of the road and all intersection
points
• information for each curve including tangent point chainages and offsets,
curve radii, arc length, tangent length, supere[evation (if applicable) and
curve widening (if applicable)
• kerb lines including kerb radii (where not parallel to centreline) and
tangent point changes (where not parallel to centreline)
• edge of pavement where kerb is not constructed
• position and extent of channe[isation
• location and details of all traffic signs, guideposts, guardrail and other
street furniture
• pavement markinos includino details on raised pavement markers
IDAS form 6-Building or operalional worl< assessable
against a planning scheme
Version 3.0-1 July 2013
Page 16
• catchpit, manhole and pipeline locations
• drainage details (if applicable)
• cross road drainage culverts (if applicable)
• concrete footpaths and cycle paths
• location and details for access points, ramps and invert crossings
• changes in surfacing material.
Applications for operational work involving stormwater drainage
Drawings showing: ~ Confirmed
• existing and proposed contours o Not applicable
• drainage locations, diameters and class of pipe, open drains and
easements
• manhole location, chainage and offset or coordinates and inlet and outlet
invert levels
• inlet pit locations, chainage and offset or coordinates and invert and kerb
levels.
Applications for operational work involving water reticulation
Drawings showing: o Confirmed
~ Not applicable
• kerb lines or edge of pavement where kerb is not constructed
• location and levels of other utility services where affected by water
reticulation works
• pipe diameter, type of pipe and pipe alignment
• water main alignments
• water supply pump station details (if applicable)
• minor reservoir details (if applicable)
• conduits
• location of valves and fire hydrants
• location of house connections (if applicable)
• location of bench marks and reference pegs .
Applications for operational work involving sewerage reticulation
Drawings showing: o Confirmed
~ Not applicable
• location of all existing and proposed services
• location of all existing and proposed sewer lines and manhole locations
, location of all house connection branches
• kerb lines or edge of pavement where kerb is not constructed
• chain ages
• design sewer invert levels
• design top of manhole levels
• type of manhole and manhole cover
• pipe diameter, type of pipe and pipe alignment
• location of house connections (if applicable)
• sewer pump station details (if applicable) .
Applications for operational work involving street lighting
Drawings showing: o Confirmed
~ Not applicable
• location of all light poles and service conduits
• location of all other cross road conduits
• type of wattage and lighting
• any traffic calming devices
• additional plans for roundabouts and major roads (if applicable)
• details of anv variations to normal alianment
IDAS (onn 6-Building or operalional work assessable
against a planning scheme
Version 3.0-1 July 2013
Page 17
• details of lighting levels, I
Applications for operational work involving public utility services
Drawings showing: o Confirmed
~ Not applicable
• any existing light poles and power poles
• any existing underground services
• details of proposed services
• alteration to existing services,
Applications for operational work involving landscaping works
Drawings showing: o Confirmed
~ Not applicable
• the location of proposed plant species
• a plant schedule indicating common and botanical names, pot sizes and
numbers of plants
• planting bed preparation details including topsoil depth, subgrade
preparation, mulch type and depth, type of turf, pebble, paving and garden
edge
• the location and type of any existing trees to be retained
• construction details of planter boxes, retaining walls and fences
• the proposed maintenance period
• irrigation system details,
Privacy-Please refer to your assessment manager, referral agency andlor building certifier for further details on the
use of information recorded in this form,
OFFICE USE ONLY
Date received ____________ 1 Reference numbers
The Sustainable Planning Act 2009 is administered by the Department of State Development, Infrastructure and
Planning, This form and all other required application materials should be sent to your assessment manager and any
referral agency,
Department of State Development, Infrastructure and Planning
PO 80x 15009 City East Old 4002
10113 OGOV (13 74 68) IDAS fonn 6-Building or operational wot!< assessable
[email protected] against a planning scheme
Version 3.0-1 July 2013
www.dsdip.qld.gov.au
Page 18
HOOP PINE RD, COOROY
PRIVATE DRIVEWAY ACCESS
ENERGY SERVICE PROVIDERS
Personal Protective
U @~~gex ongm
--EQUipment -
NOTE: SERVICE lOCAllONS foRE IV'PROXIMATE ONLY FROM
PROVIDERS PLANS. LOCATlONSJoRE TO BE CONFlRMEO
PRIOR TO STAAT OF CONS1'RUCllON. PHONE cave
SERVICE LOCATIONS ON 1100 FOR DETAILS.
SAFETY OFFICER
North 0100:
54409114/0421097484
South 0100:
54995127 I 0409729457
Manual of Uniform Traffic Control Devices
~[E~[Z;J<$>[}[]~
NOTE: ALL SIGNS & LINE MARKING TO BE IN
ACCORDANCE IMTH THE MANUAL OF
[Q)om[S
. UNIFORM TRAFFIC CONTROL DEVICES. BEFORE YOU DIG
TELECOMMUNICATIONS
SERVICE PROVIDERS SERVICE LOCATIONS
It is the responsibility of the Foreman to
contact the relevant service authorities
NOn:.: SERVICE lOCATlONS ARE APPROXIMATE ONLY fROM to ascertain the exact location of
PROVIDERS PlANS. LOCATlONSARE TO BE CONFIRMED
PRIOR TO START OF CONSTRUCllON. PHONE DBYO services prior to construction.
SERVICE LOCATIONS ON ill! FOR DETAILS.
LOCALITY PLAN
NOT TO SCALE
PROJECT STANDARD DRAWINGS.
DRAWING INDEX NOOSA SHIRE COUNCIL
DRAWlNG NUMBER DESCRIPTION STO DVVG No. SHEET DESCRIPTION
15633. C01 LOCALITY PLAN AND DRAIMNG INDEX R.056 DRIVEWAY. RURAL DRIVEWAY
15633. CO2 GENERAL NOTES
R-'5 TABLE DRAIN CROSSING WTH VEHICLE ACCESS
15633. C03 GENERAL ARRANGEMENT PLAN, SETOlIT AND TYPICAL SECTION
INTERNA TIONAL EROSION CONTROL ASSOCIATION
15633 - C04 LONGITUDINAL SECTION AND PAVEMENT DETAILS
CDT-01 DUMPED ROCK CHECK DAM
15633 - COS CROSS SECTIONS - SHEET 1 of 3
15633 - C06 CROSS SECTIONS. SHEET 2 of 3
15633 - C07 CROSS SECTIONS. SHEET 3 of 3 .• TO BE READ IN CONJUNCTION VIITH ALL ASSOCIATED DOCUMENTS,
STANDARD SPECIFICATIONS AND AUSTRALIAN STANDARDS WHERE
NOTED WlTHIN INDIVIDUAL STANDARD DRAIMNGS. o 10 20 30m
b-l !
Scale 1:500@A1
Scale 1:1000@A3
Clent
"'- \leli6ed
1'''''' [)Bwjl'lll Tille
.~"
COP"l'RtGHT 0
TbNo•• _g •...cjecttl
~11II8CClOf<l_.wiIII".
••••nt be/wfttl Tod
ConMftng ply ld [)Ol and k:,
chnl TM~""" odtbo'
RICK TEMPLETON
TOO BLH
0"''''''
BLH
••••••••
GAJ
\lerl~ed
GAJ
RPEQ No
PRIVATE DRIVEWAY ACCESS COVER SHEET AND
DRAWING INDEX
AS SHOWN
OI'awlng
15633.C01
Nurrilw
A1
_. - ---
on SP1So'281l
engineers &. project managers ROp LOT'1
na~ _bl_
\IMd"~op..:lIk~
•••••
Ior_OIl.....cl....-d. )(Jl
_1115"001.,;0
_~Gl'5l2f)1I10
1'O_"._.lI.D_
__ l:aPD
_01_l:S31
••••
D.REYNOLDS
••
9072
0'"
21/9/2015
lOCAL AUlHORlTY
MCU APPROVAL
FtOLAPPROVAl.
N$C.'SCC
HORIZOATUd
VERT DA 1'\.U AH)
PS'" '.(3256
OWN
! ",,,,~ •._.t"!!!
m ~ ~ ~
I 1..,.1, .,1.".1.. 1.•.,1..,,1
•••••
1 of 7 A
•••••edlor_.In". A SSl.eD FOR;APPROVAL Rt,4201s.1l29lS1 RL ''(7,3i.( 1LU\,R£IoIV<T"'" .--. 1'1_
OPW APPROVAL
r--..~. RevDate Revision
Descrition Drawn
Page 19
GENERAL NOTES
EROSION & SEDIMENT CONTROL
EARTHWORKS
.• GENERAL NOTES
OBJECTIVES:
GENERAL:
1. 00 NOT SCALE DRAWINGS. 1. THESE DRAWINGS ME PROVIDED FOR GUIDANCE ONLY. THE CONTRACTOR $iV.Ll. ASSESS 'M-tIIT
1. THESE DAA'MNGS SHOULD BE RE.AD IN CQN.JJNCTlON WITH GEOTECHNICAL REPORT 15071 001, D"'TED MEASURES.ARE REQUIRED TO SUIT""E PROPOSED CONSTRUCTION METHODOLOGY AND STAGING.
2. All. DIMENSIONS ARE IN MIWMETRES OR METRES UNlESS NOTED OThERWISE.
6" Of MAY 201SAND PREPAAED BY TECTONIC.
3. All. DISCREPANCIES SHALl. BE REFERRED TO THE SUPERINTEN:lENT FOR CLARIFICATION BEFORE 2. THE CONTRACTOR SliAU. COOPlY 'MTH ALl STATUTORY REGUl...ATlONS DURING Tl-E CONSTRUCTION
2. AlL EXISTING UNDERGROUND SCfMCES TO BE LOCATED AND MARKED PRIOR TO COMMENCEMENT OF PHASE.'ND MAINTENANCE PERIOD.
PROCEEDING
EARll1'NORKS.
4 TME.CONTRACTOR SHAll NOTIFY THE SUPERINTENDENT IN v.-RrTlNG OF AU. VARIATIONS ARISING FROM 3 EROSION •••.•o SEOIMMITATION CONTROL MAY BE i\JDED BY MINIMISING THE MEA OF DISBURBANCE..
THE CLARlFICATIOO OF Tt1E DISCREPANCY. 3. AU. EARTHWORKS ACTMTIES INCLUDING STRIPPING. EKCAVATION. fIWNG. COMPACTION AND TESTING,
IS TO BE UNOERTAKEN IN ACCORDANCE 'MTH THE DRAWINGS. SPECIFICATIONS. CURRENT RELEVANT M•••.•AGEP.IENTPRINCiPlES:
5. TME. CONTRACTOR SHALL SUBMIT DETAILS OF AN'( ADOITlONAL COST ARISING FROM A VARLATION TO AUSTIVJJAN STANDARDS. OTHER STAnrTORY REQUIREMENTS"""" TO THE SATISFACTION OF TtE 4. THE MANAGEMENT PRINCIPLES EMPlOYED IN THS PlAN ME IN ACCORDANCE INlTH THE 'BEST
THE SUl='ERINTENDENT FOR foPPROVAl.., BEFORE PROCEEDING 1NlTH""e WORKS. LOCAl.. AUTHORITY AND THE ENGINEER PRACTICE EROSION AND SEDIMENT CONTROL' r.t..IoMJAL.PUBLISHED BY THE INTERN.A.TlONAL EROSION
6. All. WORK AND MATERIALS SHALl. BE IN ACCORDANCE 'MTH THE DRA'MNGS, SPECIFICATIONS, CURRENT 4. EARTHWORKS SHOlA.D AVOID THE EROSION OR SILTATION OF ADJOINING l..'NOS. STRE.AMS OR CONTROL ASSOCI"'TlON (IEGA). THE BASIC PRINCIPlES.ARE TO:
RaevANT AUSTRALIAN STANDARDS. OTt1ER STATUTORY REQUIREMENTS AND TO THE SATISFACTION W"'TERCOURSES, REFER EROSION AND SEDIMENT MA.NA.GEMENTPLMI mD NOTES.
MINIMISE Tt1E AREA OF DISTURBANCE;
OF THE LOCAl. AUTHORITY AND Tt1E ENGINEER.
5. ALL. EROSJON AND SEDIMENT CONTROlS TO BE INSTALLED AND FUllY OPERATIONAL PRIOR TO
CONTROl DRAINAGE P'"THS UPSTREAM OF SITE AND AT oun.ElS FROM SITE;
7. NO 'r\'ORK IS TO CO#.IMENCE ON SITE UNTIL THE APPROVAL Of' THE COUNCIL HAS BEEN RECEl\I£O IN Cor.lMENCEUENT OF EARTHWORKS.
v.-R1TlNG AND AN OffiCIAL PRE-START l.lEETING 'MTH A REPRESENTATIVE OF COUNCIL AND THE
5. EARTH'M:>RJ(S SHOULD BE STAGED TO MINI "'ISE THE EXTENT AND DURATION Of SOIL EXPOSURE. MIN1MISE EROSION;
ENGINEER HAy,;: BEEN H8.0. THE CONTRACTOR IS TO O9TAlN A COPY OF Tt£ Mlt-VTES OF THE
PRE-5TART MEETlOO -'NO SHALL COMPI. Y vvrrH THE REQUIREMENTS THEREOF. • MINIMISE SEDIMENTATION:
TOPSOIL:
&. THE WORK AREA 'MLL BE MINIMISED TO FACIUTATE CONSTRUCTION 'M-1ILST ENAalNG CCNT1NUAl. 7. PRIOR TO ANY EARTHWOAAS ACTMTIES, TREE STUMPS. BUILDING DEBRIS. ORGANIC RICH TOPSOIL MID PROGRESSIVELY REVEGETATE AND REHAaIUTATE THE SITE.
OPERATIONS OF THE SPORTS COMPLEX. TO Tt1E SATISFACTION Of' THE PRINCIPAL AND SEVERELY ROOT AFFECTED AREAS MUST BE REMOVED
SUPERINTENDENT. CONSTRUCTION PRE.START MEEllNG-
8. ORGANIC RICH TOPSOIL MUST NOT BE USED IN FILL IT SHAlL BE STOCKPILED FOR RE.USE IN
9. 'NORKlNG HOURS. COMMUNIC"'TIONS PROTOCOlS. SITE .-.cCEss, AREA FOR CONTRACTORS 5. THE CONSTRUCTION PRE-START tJEETING IS AN OPPORTUNITY FOR All PARTIES TO DISCUSS CRITICAL
lJ',NDSCAF'lNG OR DIsPOSED OF. TOPSOIL STOCKPILES SHALl. NOT EXCEED 2M IN HEIGHT.
FACILlTIESISTORAGENOO SITE SECURITY TO BEAGREED WITH THE PRINClPAl. •••.•D SUPERINTENDENT. ISSUES. SUCH M:
SUBSOILS
10. THE FOLLOWING HOLD POINT INSPECTIONS WILL BE REQUIRED; • KEY OBJECTIVES OF""E EROSION AND SEDIMENT CONTROl PLAN;
9. ENSURE SUITABlE GROUND COVER IS PROVIDED TO AlL EXPOSED SUBSOILS AS SOON AS PRACTICAL
CONSTRUCTION PRE-STAAT MEETING TO MINIMISE THE RISK.OF SOIL EROSION. ESPECiAllY IF THE SOILS ARE DISPERSIVE. REQUIRED W"'TER QUAlIT'l' OBJECTIVES:
• SCT OUT PERFORMANCE MONITORING ANO INSPECTION PROCEDURES;
SUBGRAOES
DEMOLITION 10. SUBGRAOES IN PAVEMENT AREAS SHAlL eE PROOF ROLlED USING A M~IUlA( lOT FLAT DRUM ROLLER IDENTIFICATION Of THE RESPONSIBLE SITE OFFICCRS:
AND AN'( son SPOTS OR UNSUITABLE MATERIAlS SHAU BE EXCAV"'TEO At«) REPLACED 'MTH SELECT
SUBGRAOE PRooF-ROL.l.S
IDENTIFICATION OF CRITICAl.. ENVIRONMENTAl...CONCERNS;
FILL
PRE-SEAL PRooF-ROLLS
STOCXPILE MANAGEMENT; REPORTING PROCEDURES FOR NDN-COMPLI-'NCE ACTMTlES •••.•D EVENTS.
• CONCRETE PRE-POURS
11. CONTRACTOR TO ENSURE STOCKPILES ARE NOT LOCATED IN A POSITION 'M-lERE THEY COULD BE SITE INSPECTION AND MONITORING:
FIfoW. INSPECTION WASHED INTO A GUTTER. DRAIN OR W"'TER Boo'1. SUCH AS:.
6. CONTRACTOR SHAll NOMINATE A PERSON RESPONSIBLE FOR INSTAUATlON, MONITORING /oW
11. THE CONTRACTOR SHALl. PROVIDE AlL MANAGEMENT PLANS, INCLUDING TRAFFIC MANAGEMENT PlAN. ON A ROAD PAVEw.ENT; MAINTENANCE OF CONTROL MEASURES (E.G. SITE FOREMAN).
ENVlRONIo1ENTAL MANAGEMENT PlAN AND WORK PlACE HEALTH AND SAFETY PLAN FOR REVIEW AND
APPROV,&J.OF PRINCIPAL AND SUPERINTENDENT, PRIOR TO CONSTRUCTION. 'MTHIN AN OVERLAND FLOW PATH: 7. ALl EROSION /oM) SEDIMENT CONTROL MEASURES SHOULD BE INSPECTED:
AT LEAST Di\JLY IM-lEN RAIN IS OCCURING:
12. FOLLOWING COMPlETION OF THE WORKS THE CONTRACTOR SHAlL CLEAN UP Tt1E SITE AND • AOJ"'CENT TO STREAM BANKS.
DEMOBIUSE TO THE SATISFACTION OF THE PRINCIPAL AND SUPERINTENDENT. "'T LEAST 'M::EKLY (EVEN IF WORK IS NOT OCCURING ON-SITE):
12. CONTRACTOR TO ENSURE STOCKPILES ARE COVERED WITH A TMP CR OTt1ER IMPERVIOUS COVER.
LONG TERM STOCKPILES CAN BE COVERED WITH MUlCH OR TEMPORARY VEGETATION (GRASS).
SURVEY 'MTHlN 24 HOURS PRIOR TO EXPECTED FWNFALL.:
13. ENSURE APPROPRIATE OUST CONTROl MEASURES EXJST FOR ALL STOCKPILeS
1. THIS DESIGN IS 6.'SEDON SURVEY PROVIDED BY MURRAY & ASSOCIATES SUR\lE'fORS. WITHIN 18 HOURS Of'''' RAINFALl EVENT.
14. ENSURE •••.•AWROPRIATE SEDIMENT COtrrROL SYSTEM IS LOCATED DO'MI-SLOPE OF All STOCKPILES.
2. THE CONTRACTOR SHALL CONFIRM EXISTING LEVELS. FEATURES AND UTIUTlES PRIOR TO 8. CONTRACTOR TO CHECK AFTER RAINFALl. FOR PERFORM •••.•CE INDICATORS SUCH .-.s EVIDENCe OF
CONSTRUCTION. SITE REH.4BlUTATlON: EXCESSIVE FLOW CONCENTRATIONS. EROSION PATHS DEVELOPING. SILT AND SEDIMENT
ACCUMULATION
15. EN~ THE SOIL SURFACE IS SCARIFIED PRIOR TO THE PLACEMENT OF TOPSOIL TO BREAK UP ANY
EXISTING SERVICES 9. CONlR.'CTOR TO Ct£CK DURING RAIN THAT FLOWS AAE NOT BYPASSING CONTROL MEA$JRES.
EXCESSIVE COMP"'CTION. AND ENABLE THE APPROPRIATE KEYING OF Tt1E SOIL LAYERS.
,. THE LOCATION OF AU. IN-GROUND AM) OVERHE.AO SERVICES HAS BEEN DETERMtNED FROM FIELD
16. SCARIFY LIGHTl...Y COMPACTED SOILS TO A MINIMUM DEPTH OF l00MI,I AND HEAVILY COMPACTED 10. 'MiEN A SITE INSPECTION DETECTS'" NOTABLE FAILURE IN ll1E ADOPTED MEASURES. THE SOURCE OF
SURVEY, DIAl. BEFORE YOU DIG ENQUIRIES -'NO INFORMATION PROVIDED BY .••SERVICE LOCATOR.
SUBSOILS TO A MINIMUM DEPTH Of' 3OOMM. THIS Fi\JLURE MUST BE IN\lESTlGATED ,t,ND THE APPROPRLATE AMENOMENTS MADE TO THE SITE
2. THE SERVICES ARE SHOI'hl ON THESE DRAWINGS FOR INFORMATION ONI. Y AND NO RESPONSIBlUTY IS CONTROLS.
17. TURF MUST NOT BE PLACED ON EXCESSIVElY COMPACTED SOILS.
TAKEN FOR THE ACCUAACY OR COMPLETENESS OF THE INFORMATION SUPPLiED. 11. THE CONTRACTOR SHAU. MAINTAIN A WRITIEN RECORD OF OATES Of ALL. INSPECTIONS INCLUDING ANY
18 SOIL TESTING SHOULD BE USED TO DETERMINE AN'( REQUIRED Ct£MICAL ADJUSTMENT TO THE SOIL CORRECTNE ACTIONS TAKEN.
3. THE CONTRACTOR SHALL VERIFY THE LOC"'T1ON OF All. EXISTING SERVICES ON THE SITE PRIOR TO
(E.G. GYPSUM, U •.••E, FERTIUSER. PH AQ.JJSTh'ENTS).
COMMENCING WORKS.
4. NO WORK IS TO BE UNDERTAKEN OVER OR WITHIN 3M OF EXISTING SERVICES PRIOR TO NOTIFIC"'TlON 19. All SITE REHABILITATION MEASURES SHOULD BE MONITORED, PARTlCtJL..A,RLYAFTER RAINFALL REiNFORCED CONCRETE PAVEMENT
TO THE APPROPRLATE AUTHORIT1ES.
1. THE CHARACTERISTIC COMPRESSIVE STRENGTH OF Tt1E CONCRETE (F'C) MUST NOT BE LESS THAN 32
5. EXISTING VALVES. HYDRANTS. PITS. ACCESS CHAMBERS AND OTHER UTILITIES SHAll BE MODiFIED ROAD PAVEMENT
MPAAT 28 DAYS.
WHERE NECESSARY TO SUIT FINAL FINISHED SURFACE LEVELS.
1. SUBGIVOE TESTS SHALL BE UNDERTAKEN •••.•D RESULTS SUPPLIED TO Tt1E DESIGNER. TO DETERMINE 2. CONCRETE Sl-W...L.BE READY MIXED. CONCRETE SI-W.L CONTAIN PORTlAND FLYASH BLENDED CEMENT
THE ADEQUACY Of' THE PAVEMENT DEPTH DETAILED ON Tt1E DRAWING$. FOR INCREASED [)l.IR,I.BIUTY. THE PROPORTION OF FLYASH SHALL BE 25'110
BY ••••
'EIGHT. OF Tt1E TOTAl
CLEARING, GRUBBING AND DISPOSAL COMBINED 'NEIGHT OF FLYASH NoD PORTlAND CEMENT.
2. SUBGRAOES IN PAVEMENT AREAS SHALl. BE PROOF ROLLED USING A MINIMUM lOT FlAT DRUM ROLLER 3. CONCRETE COVER TO Tt1E OUTSIDE F-'CE OF NN REINFORCEMENT IS TO BE:
GENERAL: AND ANY SOFT SORTS OR UNSUITABLE MATERIALS SHALl. BE exCAVATED AM) REPLACED 'MTH SOMMTOP AND SlOES
1. CLEARING SHOULD NOT OCCUR UNLESS PRECEEOED BY THE INST.-.u.ATION OF ALL. NECESSARY COMPACTED saECT GR,AJIILt.AR FILL (TYPE 2.3) 70MM BOTTOM
DRAINAGE .-.NO SEDIMENT CONTROL MEASURES. THE EXCEPTION woutD BE AN'( CLEARING 4. ALL CONCRETE IMJRo( IS TO BE EXECUTED IN ACCORD •••.•CE WITH Tt1E CURRENT EomON OF.
3 All. PAVING OPERATIONS INCLUDING MATERIAL SUPPLY. CONSTRUCTION PROCEDURES AND TESTING
NECESSARY TO I>J.l.OWINSTAlLATION OF THESE COtrrROl MEASURES. 5. _M 3600. $.V, CONCRETE STRUCTURES
REQUIREMENTS SHALL BE IN ACCORDANCE WITH TNR STANDARDS.'ND SPECIFICATION
AS 1379 - READY.MlXED CONCRETE
2- CLEARING SHOULD BE STAGED TO MINIMISE THE EXTENT AND DURATION OF SOIL EXPOSURE. 5. THE TEST RESUL.TS 1fl:E TO CONFORM TO THE ACCEPTABIUTY REQUIREMENTS OF THE.CURRENT
EDITION OF;.s 3600 (PRo.ECT .-.ssESSUENT RECUIRED).
3. EST.ABlISH AN'( NQN..OISTURBANCE OR EXCLUSION AAEAS IDENTIFIED.
7. THE MAXIMUM SIZE.OF "'GGREGATE SHAlL BE 2OMM.
4. 'M1ERE APPROPRIATE, IDENTIFY, ISOLATE MlDiOR PROTECT RETAINED VEGETATION. 8. Tt1E CONCRETE SHAlJ. SLUMP TEST AT 100MM UNLESS NOTED OTt1ERWISE
9. ALl CONCRETE TO BE MECHANICAl.LY VIBRATED.
S. CLEARING SHAU. BE MIN1MlSEO TO ONLY THE TREES AND VEGETATION NECESSARY TO UNDERTAKE 10. PLASTIC CI'WRS OR CONCRETE BLOCKS TO BE USED TO SLFPORT REINFORCEMENT AND GIVE THE
THESE WORKS. CORRECT CONCRETE COVER.
12. THE FACE OF ALL. CCNCRETEAGAINST 'NHICH NE"NCONCRETE IS TO BE POURED SHALL BE
5. CLEAAING AAD GRUBaNG INCLUDES REMOV,&J.OF THE MAIN TREE ROOTS TO A MINIMUM DEPTH OF 1.0M
AND THE REMOVAL OF SURFACE ROOTS AND VEGETABlE IAATTER FROM THE TOP 0.3!JI BELOW Tt1E Tt10ROUGH. Y SCA£lBLEO.
13. All CONCRETE SURFACES ARE TO BE CURED BY AN foPPROVEO METHOO FOR SEVEN (7) DAYS
NATURAL SURFACE. LEVa.
IMMEDIATELY CONCRETE IS HARD. PREFERRED METHOD IS TO COVER WITH PLASTIC SHEEnNG TAPED
7. DISPOSAL Of AlL CLEARED VEGETATION AM) RUBBISH SHPU. BE IN ACCORDANCE 'MTH THE AT EDGES AND LAPS.
REQUIREMENTS OF THE LOCAL "UTHORITY. 14. REQUiRED CURING PERFORMANCE (CONTRACTOR'S REsPONSiBILTY): CRACKS IN CONCRETE (90 DAYS
AFTER PLACEMENT) SHAl..l NOT EXCEED THE FOlLOWING UMrTS:
8. CLEAAED VEGETATION CAN BE PROCESSED THROUGH WOOD CHIPPING AND THE MULCH PRODUCED
11. DECORATIVE coNCRETE; NOT GREATER THNol O.lM"I (BARELY VISIBLE). DECORATI\fE CONCRETE 'MTH
PLACED IN INTERIM STOCKPILES FOR LATER USE IN EROSJON AND SEDIMENT CONTROl OR
CRACKS EXCEEDING LIMIT MAY BE REJECTED
lAND$C.APING PLRPOSES. 12. ALl OTt1ER CONCRETE: 0.3MM (OURA8lLTYLIMIT). CONCRETE CRACKS EXCEEDING WMITMUST BE
REPlACED OR REPAIRED. OBTAIN APPROVAl. FOR REPAIR METHODS BEFORE COMMENCING 'IvORt<.
15. BAR SCHEDULE.
N. TYPE 500N HOT ROLl.ED HIGH YIELD BARS TO M 4671.
RL. RECTANGULAR RIB MESH TQ AS 4871.
15. REINFORCEMENT VP Sl'UCE LENGTHS (UN.O ON DRAWINGS)
13. -N12 _450MM
14. -N16.&OOMM
15• .RE1NFORCING MESH TO BE LAPPED 225MM MIN.
DnwiIlgTIIIe
Vori~ed Pro""
co•• """"
COPYRIGHT C
Trw.~g.1Wjod
e~'''~''''".
•lJ"ment_Toc!
ConeulIftg PI)'td (li:}_li:
10
••
RICK TEMPLETON
TOD BLH
Qesigned
BLH
GAJ
V" •••
GAJ
RPEQ No
PRIVATE DRIVEWAY ACCESS GENERAL NOTES
Drawing
15633-C02
Nurrbel
~:.;r;;
e,*,L This~lng thlllltrit be Appl"oved Ref> LOT 11 on SPI84-289
engineers & project managers
-.•.- •••••
uMd /of ••••• tp.at\e projocL 9072 LOCfJ. AUTHORIn' NSCISCC
_,lll'_111100 a ~ ~ ~ • ~ 10
nw.~g"""lIOtbe_
•••••••••
1M.
e:-a7_'11O
1'O
•• ..._
_.III_l:l$
e1._.ClD_ ___._ 0." MCUAPPROVAL
ROLAPPROVAl...
HORlZOA'i1..M
veRT OATl.I.l At«) to,' I 1..1.. 1 !I.I".I, !1II1.. ' ..!
2 of?
lor_Nelon
""*'"
•••1Il....ud •
fa ••••••.••_ ••• II.
A $SLED FOR APPROVI\L x"- •••••• 105:131
'11912015 OPW APPROVAl. FlJ,l2015102981 Rl. ~ •....•.
r_""~"'" Rev DaterRevision Desert tion Drawn
/
Page 20
LOT2
ON RP 187377
NO ACCESS TO EXISTING
NEIGHBOURING DRIVEWAY
FROM PROPOSED DRIVEWAY
(~
+-
-Q:r"1iiI~ =- _ - ---:::
,/ /'
_
/" /"
/ ~\
.#
/ /-
LOTt
r PROVIDE CONCRETE DRIVEWAY ACCESS IN ONRP 187377 '--_/- -- ~-~////I
ACCORDANCE IMTH IPWEAQ STD DRG R-050 ~ .r' --- -- F-7',/ \ 8
DEMOLISH AND REMOVE :.....- '" . ',1 I
CONTROL LINE CL01 EXISTING TRACK TO PREVENT -------.,.~ EXTENT OF WORKS I
-
'~'0--=: J'
REFER SETOUT TABLE BELOW VEHICULAR ACCESS '~
(
TOCOOROY
. A EXISTING TREES
k~~~.,
PROVIDE ROAD EDGE GUIDE POSTS HOOP PINE ROAD /I,TO,BE\REM,. OV\ED , \ ' \ \' '''' •. ~"\
@500mCRS-CONFIRMONSITE ~Ji~ ;( I ~,\ L'" ~
" \\ \\~l,\\(,\' \A\\;\'\iI\\":\ ~~:',,::~,~;\ >;~~~"?{~C/
/
TO OCEAN VIEW DRIVE
.:
..,' .,:, 1'[" ..•;' 'f - . ' :/' {"I,"'(- ",j-.«/""""" '", ,. " "'" " .• ". ~~ ~""
LOT 11
-
- ON $P 184289
~ ~- ,>, I
,I ~K ~Ii IJ J I i I~I ~ I ~ ~ I ~ \ J \ ~ \ ~ \ ~ \ g~ \ , \ ~ \
PROPOSED EASEMENT FOR
TURNING AREA AND
STROMWATER DISCHARGE
I
lP
~~
-0
g
~
g8
~
0
~
0
I I ~
(:)
I ~
go
g
g
go ~ g" 0g: ~€~
~J.....~!5
ourrET OPEN DRAIN TO
EXISTING GULLY AND PROVIDE
g g 09.. GROUTED ROCK SCOUR OUTLET
-..J: g." ~,
0 :-..
STEEPEN SAnER TO AVOID TABLE DRAIN PROTECTION. 10m2 (MIN)
PROPERTY BOUNDARY REFER SETOUT TABLE BELOW 0 ,," h.
EXISTING DRIVEWAY
ACCESS TO BE MAINTAINED
PROVIDE 1.0m HIGH DUMPED ROCK
CHECK DAMS EVERY4.00-5.00mAS PER
LOT 2
ON RP 864123 I !ff
;I: ~
g_.
EXISTING
AND CHANNEL
KERB
IECA STD DRG CDT-01 '" ~ t fi (J ~
!/J
GENERAL ARRANGEMENT PLAN 0::i ,. :to
~ ::s o 5 10 15m
SCALE 1:250
00
o()'~() b--" Seale 1 :250 @A 1
, I
<: ,::i scale 1:500 @A3
I '"
SETOUT TABLE - CONTROL LINE CL01 SETOUT TABLE. TABLE DRAIN LEGEND
Northing Rad/Spiral Chainage Easling Northing Level Rad/Spiral
Chalnage Easting Level -- - -- PROPOSED CONTROL LINE
o 1004.996 1923.185 137.199 o 1002.44 1921.925 136.845
PROPOSED CONCRETE PAVEMENT EDGE
136.847 50 8264 100821 1914.517 134.709 62,846
1.408 1005.617 1921.921 --)--)-- PROPOSED TABLE ORAlN
2,816 1006.168 1920.624 136.495 16,528 1007.924 1906.383 132.52
--) -->-- EXISTING TABLE DRAIN
1007.633 1917.158 135.554 36.737 1010.174 1886.3 126.674
6.58
('" III!
EXISTI NG EDGE OF BITUM EN
1010,25 1910.974 133,885 50 44.189 1011.016 1878.896 124,518
13255
1904.319 132216 51.354 1012.574 1871.903 122.45 EXISTING TOP OF BANK
19,929 1011.142
1896,525 130.25 66." 1015.656 1856,804 118.157
27.793 1012.188 EXISTING BDnOM OF BANK
1893.713 129.541 -150 82.681 1018,792 1840.994 114,278
30.63 1012.565 EXISTING PROPERTY BOUNDARY
94,09 1021.361 1830.083 111.923
33.467
43.995
1013.049
1014.842
1890.917
1880.543
128.832
126.2 104.094 1023615 1820.337 109.939 ) PROPOSED DUMPED ROCK CHECK DAM
1876.383 125.145 .200 111.714 1025.119 1812,867 108,693
48.217 1015561 PROPOSED ROAD EDGE GUIDE POST
52.438 1018.455 1872.257 124089 121.368 1027.311 1803.465 107.116
128.212 1028.192 1796.678 106.088
62.436
66.757
1018.573
1019.488
1862.485
1858.262
121.59
120509 -200 129.765 1028.403 1795.055 105.67 , 0.5m
71,078 1020.585
1024.15
1854.082
1840.494
119.429
115.917
131.319
137.836
1027.416
1023.484
1793.75
1788.553
105.252
104.800
SHOULDER llol,3 OOm \MOE DRIVEWAY I ROAD EDGE GUIDE POSTS
85.126 DESIGN
SELECTFILL
SURFACE
94.687 1026.58 1831.232 113.527 150
0
1 1 300%
104,249 1027.813 1821.738 111202
/ 1.0m HIGH DUMPED
129.292 1031.037 1796.903 106,419 ALL 1 in2 ,/ ROCK CHECK DAM
BATIERSTO
131.816 1031.38 1794.266 106.023 6.5
VEGETATED
I 3"
1029.775 1792.145 105.627
134.341
141.001 1025.757 1766.833 105.450
150mm THICK CONCRETE PAVEMENT...J
~'i
~~ROCK LINED TABLE DRAlN
_ REFER NOTES ON SHEET C02 AND
- 300mm DEEP
DETAILS ON SHEET CO,
~EXISTING o 123m
L-i' ; I
SURFACE DRIVEWAY TYPICAL SECTION
Seale 1:50 @A 1
SCALE 1:50 Seale 1:100@A3
"' ..• •••••• ."' ... Projlld Orawlng TllI•
TOD GENERAL ARRANGEMENT ;'; SHOWNr';~'
COPYRIGHT C
TI* lhw'n\J1I ~ 10
RICK TEMPLETON
BLH GAJ PRIVATE DRIVEWAY ACCESS
Deslgnlld V.~~lId
-"
eopyo1g,ln~_to.
~1 ••.• n1bl1tw""Tod
BLH GAJ PLAN, SETOUT AND Drewlnll Number
C~~lId(ll::l
ciwIl. TI* ••••••.•••••••
•• d"'''
aNy t>. RPeQ No
RDP LOT 11 on SP1&f289 TYPICAL SECTION 15633-C03
engineers & project managers
uMod "" _ opock praject 9072
"' ...
17
LOCAL AUTHOFlITY NSCJSCC
_fI1~lllQI D~~JOLDS o ~ ~ ~ ~ ~ ~
_eo-07S3a:Jtlll ~f/1"'mJ
0." '"'CU APPROVAL
TlIiI~"'''II<Itt>...-.
let_
'loIIluId""c~OII'
••.••
....-.
••••• A SSUEOFOR~ROVAL xx
; ••1"O..,.1II._Cll.D_
0_ - __
A8111It,.~",
"':::t.'// >41912015 ROL APPROVAL
OPWAPPROVAL RM201S102981
! ..,1",1,::1 ~.,I ,..In '111I""t ..J., ,I,::,!
~1oOJt_~"_
30f7
'_IlOI<M~ Rev Dale Revtslon Descri tion Drawn
Page 21
N12 PERIMETER BAR TO
CORNERS, EDGES AND JOINTS
ALL SIDES MINIMUM LAP 450mm
75
10x10 PARCH EM RD SEAL OR
APPROVED EQUIVALENT
ELASTOMERIC SELANT ON
BONO BREAKING TAPE REFER
DETAlL 06 BELOW
I~~~"m~"" MESH 60 COVER
~ 25mm TOOL JOINT SEAL
UPON COMPLETION
n
~PARCHEM ROADSEAl OR
APPROVED EQUIVALENr'
R16 - 300 CTR H.D 11 SL82 REINFORCING
MESH 50 TOP AND
~[ :;:4l;' :~:;';':.~~;'~-(:::?
~.;~::.::::>.!'~.::)..~'?~;.,:_~~
--.1
~~~:L~~~~;i;;';2~
GALVANISEO DOWELS
---r"
SIDE COVER
(400 LONG) ~TH
f-.r~;"X,:~~,;;:,~::.:
••;•..'m'::~~"..fc:~::q.z..::
-:-:::~"';7..:C.S;;;i;_
PARCHEM DOWELFORM
SLEEVE (AND 16mm
INSERn SLEEVE ON ONE
END, (OR APPROVED
~K DPM ON 30mm SAND
"\.'DPM ON 30mm SAND \
lO~R BOOmmWIDE MESH WITH 50
i'-..
1"----- BOND BREAKlNG
TAPE OR BACKING ROD
EOUIVALENT THAT " COVER TO BASE OF JOINT. CUT
EVERY ALTERNATIVE WIRE AT JOINT I'-
ALLOWS LATERAL
SHRINKAGE)
I 200
I 200
I LOCATION MARK JOINT LOCATION
FORM BOARDS BEFORE POURING
ON 10mmTHICK
COMPRESSIBLE
APPROVED 10mm MATERIAL
COMPRESSIBLE FILLER
02: CONCRETE CONTRACTION/CONSTRUCTION JOINT (CJ) DETAIL 03: JOINT SEAL DETAIL
01: CONCRETE EXPANSION JOINT (EJ) DETAIL NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
AT MAXIMUM 5.0m CENTRES OR AS SHOWN (C.J.) ON PLAN
AT MAXIMUM 18.0m CENTRES OR AS SHOWN ( E.J. ) ON PLAN
ro
0> SHOULD A CONTINUOUS POUR BE DESIRED; THEN DANLEY
,.: "K.FORM" (175mm) JOINT FORMER COULO BE USED ~TH
~ HOLES RE-DRILLED FOR R16 DOWELS.
i;:
~
0 TO~OY
MATCH SMOOTHLY J:
INTO EXISTING
PAVEMENT
"
9,
~r-=- DESIGN SURFACE
""'-
EXISTING SURFACE
r----I--. F"'-=-. :::--
~ ;;
'..," .,;
-- - r:::--
- __ r- ~
...J:
~
i;:
-I-
--.... .-~
0
'<D'""
-
0 ro
ro
:::-~~
- __ G
~
...J:
.-,.:
0
ro
R.200m R.200m
- - ':::r---
-r:::::--
R150m
9,
-- ~
R~
Heriz Curve Data ;.;;; R50m R.150m
~15.67 •
.25%
Vertical Geometry Grade (~. '00/, 27.40 m
112.746m
Vertical Grade Length 0.0 4m
-
30 VC
-
Vertical Curve Length (m) R- 1.65
Vertical Curve Radius (m)
DATUM R.L. 94.50
CUT DEPTH (-)
-- ~ ;;
0 ~
~
~ ::I ~ :;; ~ .,8
M
;; ;; OJ
g ; ~ 8
-::" - - .,~
-
M
@ 8 i! :!! ~~ ~ ;:;
FILL DEPTH (+) <i ., <i <i
0
q <i ~ .,
N
d ~
0
~
~
~
- -:;:"'
~ ~
~
~
;;
0
I'l
<i ~
~
~
~ II
~~~ ::I !!
"
N
!! !! '" ~ ~ ~ ~
DESIGN
ill ~ ~.
'"
l'
N !! Ii!
"
l'l
~ .,8
N :!l ~
~
~
~ '" ~
N
~
~
~
e !':! i ~
~ ~~
" t'! !1
~ :! '"
~ :! !! ~ "~ ~ ~ ~ ~ ~
~ ~
:;: ~ ~ ~ 8 :!!
!! ~~
N
ill ~ l' M
;; ;;; '"
;:
0
::I ill ~ ~
N
~
N
~. ~ ~ ~ ill N
~
~
~ ~ e
M
"'~ ~
N
-
N
EXISTING M
~ '" ••~ :: ~ ~ ~ ~ ~ !':! !':! ~ ~
a ~ !1 0
:! "
" :! ~ :! !! ~ ~
~
~ ~ ~ :!! ~ ~ '" '" l:i ~ .,
~
" ~
N
~ ~
M
~ 8i ~ ~ '"~ N
"~ ~
"
M
~ ;!
~
" !! ~
~.
CHAINAGE 8., ~ ~
~ ~ ,; (;l g ;:: ~
0 ori
~ ~ i! ~ ~~
" ~ '"'"
0
0 ~ 0 N N
M
M
•
HORIZONTAL SCALE 1:250
VERnCAL SCALE 1:250 0 5 10 15m
; ;
L::--l I
scale 1:250 @Ai
-
scale 1:500 @A3
am
v••••• Proj.,;:t .•.....• Seale ~ ISlleeI S1z,
TOD """"
Assodll«l~
BLH GAJ PRIVATE DRIVEWAY ACCESS LONGITUDINAL SECTION ASSHOWN A1
T'* ""'"""" 0 \I>
It'aMg II IUbied RICK TEMPLETON V~fttd
~in~_"" Designed
AND PAVEMENT DETAILS Dllrwlng Nulfbet
.lI'••_~TOCl BLH GAJ
e-n"g~l)Illd~).-.d"""
RPEQ No 15633-C04
,....
Approved
IR~
~ T1nlhwlng_l""lyt. LOT 11 on SP1342S9
engineers & project managers RCP
--
9072
•••• ~for,....opoocIftcPfCllod.
~ ~ ~ •
_I. ---
LOCALAUlHORlTY NSC<SCC
_01_.xl
O~~:OLOS
- •! ! ..."1",,1....1 •••. 1 1... 1....1") 1 ..• 1 •.. 1,,,.1
c
,-~
PSM '432!!6
"""" "" ""
_CNot01SS3:n1lO ......."G10Mll:337 MCU APP'RCNAJ.
TN..~
101"_
•••• fIllI t. ••• ~
••••1IWU<l.
A SSL.EO FOR N'PRCNAL XX
J"O •••••• _OI.O_
'. •4?/' "'211912015
" ROl.lo.PPROVAL
RM2015.'029ll1
VERT OAn.MAHD
Rl. 147.394
~1o'Jl. __ "'_ 40f7
'--l"'~'in"" .•••:lHII.'" OPW N'P'RCNAJ.
Rev Dale Revision Oeseri tion Drawn
/
Page 22
DESIGN SURFACE
EXISTING SURFACE
CONTROL LINE Cl01
X = 1011.152
Y = 1904.249
Z=132.199 .-/
.-/
..,
, L CONTROL LINE CL01
X = 1015.954
Y = 1874.642
Z = 124.699
Datum 122.00
N
o
m
•...
'".; ~
+- f--
m
., '.,"
m ;:0; m
N
'" '.,
"
a
N
DESIGN .;
.-/
Datum 130.00 .•..••••.. ~~ ~ ~~
N m
~
., m .,
~ m N
'" ., 0 M ~
m ~
.,
~ N
~ N
''""
DESIGN
" N
oi oi oi
~ ~~ ~ ~ ~
oi oi oi EXISTING
~ ''"" ''""
~~ ~
M ~ '"
~~
N ~ ., ;; ;; m m
.... 0 0
0 0 0
;:j oi oi
N M m
OFFSETS
0 0
0 0 0
"i '" '"-
EXISTING oi oi C! 0 0
~~ ~ ~ ~ M 0 oi
;! 00 0
0 0 0 CHAINAGE 50.000
OFFSETS M 0 ~
0
0 0 0
<'i <'i
0
ci '" oi 0
"
1
CHAINAGE 20.000
CONTROL LINE CL01 ,,' -
, - -=
CONTROL LINE CL01
X= 1014.161
Y = 1884.480
=
Z 127.199
--- ~
X = 1008.857 ,...- Datum 124.00
Y = 1913.965 /" ;:O;~
Z= 134.699 DESIGN
Datum 132.00
~~
g(1;
DESIGN EXISTING
~~
00
EXISTING OFFSETS gg
~N
CHAINAGE 40.000
OFFSETS
CHAINAGE 10.000
3.00% ..J_00"!l0
~MATCH SMOOTHLY
INTO EXISTING
--- --- ---
CONTROL LINE CL01 CONTROL LINE CL01
PAVEMENT
X = 1004.996 X = 1012.498
Y=1923.185
=
Y 1894.340
/
-- =
3.00% .~ _ -- - Z 129.699
Z=137.199
Datum 126.00
Datum 136.00
., m
.... m ., m ~ 0 m .,
., m ;:0; m
.... ~ ~ ;:0;
::I ;;; '...,m" :;; '.,;"
m N
DESIGN ,.: ,.: ,.:
0 N N
N
,.: ,.: .,; DESIGN .,; 'm" 'm"
~~ ~ ~ ~~ ~ ~ N N
~ ~~
.... m ~ m ~~
.,
•... m
.... '" ~
;:0;•... N N
0
EXISTING
0
;;;
m
••m ~
.,; ~
.,; ., ~
M
.,; .,; M
,.: ,.: ;C ,.:
N N M
EXISTING
0 0
,.: ,.: ,.: .;
~ ~~ ~ ~~~ ~ ~~ ~ ~~
., 0 0 ~ 0
0
0
0 0 0 0
OFFSETS '" 0 0
8 0
0
0
0 ~
0
OFFSETS m 0 0 0 0
'" oi
-'" '"
0 0
<'i <'i '"
M 0
0 0
<1 <'i ~ ci
" ci oi oi
CHAINAGE 30.000
CHAINAGE 0.000
o
I _
5I 10
;
15m
;
scare 1 :250 @A 1
Scale 1 :500 @A3
o,.,,,,,'"
__~...l_._h 0_ ••••
I'd
el"
TOD CROSS SECTIONS ;~ SHOWNr';7'
COPYRIGHT 0
BlH GAl PRIVATE DRIVEWAY ACCESS
TIW~iI",*,jodlo
RICK TEMPLETON
"",,,"'" v.ri~ed
SHEET 1 of 3
tV_fC~_Tod
~plylld!IcI_Ic"
BLH GAl
RPEQ No
"""""-
15633-C05
_ nn..-- ••.•
tIIot1ylK
..-cllarltlla~P"~J-el. engineers & project managers
_:01_-.0 '-'""
~:~N0u:.S 9072
ROP
LOCALAUTliORllY
LOTl101lSP1M289
NSCISCC
to s••••
-"m...oml c"•••
G ~ M ~ ~ ~
no. hdIg_ nallK_
Iar_~...e....ud
.••••.•
•
dlarcannuc:llon.k'l.... A ssueo FOR APPROVAL XJl
_~G1_~f(1
••• II .1 __
.••• 11111.'"
-.e_
1'O""'8l._.0UlO5et SlgZ -/
'11912015
MeU APPROVAL
ROLAPPR(JIJAL
Of'WAPPROVAL RM2015(l2SMll
HORlZ 0AT\.lM
VERT OAtud AHO
RL 147.3g,j
,. hL...L..J .. ', •.!....I... ! ,!.,..! ..I..!
~"""_-.IN .•. 50f7
..- ~ Rev Dale Revision Desai tion Drawn
, P'
The text continues on page 23.